Water Resources and Irrigation Government Departments Closing in 0 days TDR #38583005

Tender For Replacement Of Damaged / Worn Out Components Of Calama Make 36 Mtrs Head, 3 Cusec Discharge With 70 H.P Submersible Motor-Pump Unit No. 1 With Re- Installation At L.I.S Dabbar Potha.

Issued by Government Departments · Rajouri, Jammu And Kashmir
Tender Value
Ref. Documents
Estimated cost
Bid Submission
18 Jul 2023
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
200
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Rajouri → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Replacement Of Damaged / Worn Out Components Of Calama Make 36 Mtrs Head, 3 Cusec Discharge With 70 H.P Submersible Motor-Pump Unit No. 1 With Re- Installation At L.I.S Dabbar Potha.

BOQ

Name of Work:- Replacement of damaged / Worn out components of Calama make 36 mtrs head, 3 cusec discharge with 70 H.P Submersible motor-pump unit No. 1 with re- installationat L.I.S Dabbar Potha.
Sl. No. Item Description
1Replacement of damaged / Worn out components of Calama make 36 mtrs head, 3 cusec discharge with 70 H.P Submersible motor-pump unit No.1 with re- installationat L.I.S Dabbar Potha by way of extraction of pumpset from sump tank and dismantling/disconnecting the pump set from delivery pipe, bends and then extracting out manually with the help of chain pulley block fitted with gantry at site and shifting of pump set to the bank of the river at a height of approx. 10 feet with the help of chain pulley block and moving trolley fitted with gantry. Shifting the pump set through river path approx. 1.5 Km to the gantry destination pointfor unloading from tractor and then loading to pickup van after using chain pulley block installed on the gantry also by using manual labour and other necessary tools and tackles ,thereafter carriage of the pump set to workshop. Dismantling pump set at workshop for repairing of motor and pump components. Repairing of pump by way of fabrications and fitting of 04 Nos. gun metal neck rings, 01 No. guide bush, 01 No. steel space bush, 01No. mesh seal oil ring and reconditioning of 02 Nos. sleeve bushes. Providing and fitting of 01 No. thrust plate. Rebuilding of 01 No. Impeller by way of welding, turning and reconditioning. Rebuilding/reconditioning of impeller/rotor shaft by re - metalling with high class rods at worn out portions and then machining, turning, polishing, finishing, to true size. Complete rewinding of 70 HP, 1450 RPM Colama make submersible motor by dismantling the rotor and stator and then rewinding completely with the original specified copper wire after extracting out old/damaged copper winding, varnishing, drying and then re-assembling the motor. Providing and fitting of new motor bush housing 01 No. as per sample and specifications. Providing & fitting of 3-core, 35 mm2 submersible copper cable of 5 mtrs. length to the motor side of the submersible Pump set.Re-assembling of pump and motor in the workshop, shifting of pump set from workshop to L.I.S. Dabbar-Potha after repairs by loading/un-loading of the pump set to the gantry destination point and then carriage to sump tank throughthe mechanical transport/head load, lowering the pump set into the sump tank from the river bank at a vertical depth of 10 feet approx. with the help of chain pulley block and moving trolley fitted with the gantry at site, fitting of pipes, bends and delivery pipe for re-fitting/ jointing the pump to rising main. Joining of each lead of 1x3x35 mm2 submersible copper cable coming from starter with lead of 3 core , 35 mm2 submersible copper cable coming from motor( stator ) by jointing/fixing copper thimbles 95 mm2 and then tightening with nuts & bolts and insulating the joint of each individual lead of 3core, 35mm2 copper cable. Also using water proof cable compound for preventing the moisture and short circuiting, insulating with patch roll and tapping, filling clean water and then testing/commissioning of pump set on full load at site.Complete job includes cost of material, labour charges for skilled and semi- skilled workers, loading/unloading and transportation/carriage charges including testing and commissioning of the job at site.Complete Job.

AI Tender Summary

OUR REF NO 38583005
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 18-07-2023
Authority
Authority Name Irrigation And Flood Control Department
Work Description Replacement Of Damaged / Worn Out Components Of Calama Make 36 Mtrs Head, 3 Cusec Discharge With 70 H.P Submersible Motor-Pump Unit No. 1 With Re- Installation At L.I.S Dabbar Potha.
Basic Detail
Tender No MID/AN/37
Bidding Type Tender
Location
City Rajouri
State Jammu And Kashmir
Key Dates
Publish Date 11 Jul 2023
Submission Date 18 Jul 2023
Open Date 19 Jul 2023
Finance
Tender Value Ref. Documents
Tender Fee 200
EMD Ref. Documents
Exemption Not Available
Document List
ded9bb98-1e93-4cc5-b514-2e943638d3d2.html
BOQ_614513.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 11, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 18, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 19, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

ded9bb98-1e93-4cc5-b514-2e943638d3d2.html

xls

BOQ_614513.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders