Tender For Providing C.C Renewal Of B.T Road Surface West 1Ststreet 115067S0381,West 2Nd Street 115067S0383,Sammattipuram Mettu 1St Street 115068S0247,Sammattipuram Mettu 2Nd Street 115068S00248,Ramajan Asari Street 115068R01966, Ponpandiyan Street, Madurai-Tamil Nadu
TDR : 38579718
Tender Notice
Corrigendum Details
BOQ
Expired
Madurai
Tamil Nadu
Corrigendum : Tender For Providing C.C Renewal Of B.T Road Surface West 1Ststreet 115067S0381,West 2Nd Street 115067S0383,Sammattipuram Mettu 1St Street 115068S0247,Sammattipuram Mettu 2Nd Street 115068S00248,Ramajan Asari Street 115068R01966, Ponpandiyan Street
Name of Work: Providing C.C& Renewal of B.T Road Surface @ WestStreet 115067S0381,WestStreet 115067S0383,Sammattipuram Mettu 1st Street 115068S0247,Sammattipuram Mettu 2nd Street 115068S00248,Ramajan Asari Street 115068R01966, Ponpandiyan Street 115068R2164,Kokkulappi Main Road & Malai Amman Kovil Street 115067R0369,Irulandi Thevar Colony 3rd Cross Street 115067R2144,Muthu Thevar Colony & Extn 115067R0375,Bharathiyar Apartment 2nd Cross Street 115059R1793,Sabesthiyar Church 3rd Street 115059R1796,Sarvothaya 2nd Street 115059R1888,E36 Road-1 115060S0226,Anthoniyarkoil Kallarai Street Road 115061R05311,Ansarinagar 6th Street 115061S01458,Ansarinagar 2nd East Street Road115061R05310,Ansarinagar 2nd East Street Road115061R05310 in Ward No -59,60,61,67,68 in Zone -3
Sl. No.
Item Description
1
Dismandling the Existing Damagaed Concrete Road etc,complete.
2
Plain Cement Concrete 1:1.5:3 (one cement, one and halffineaggregatesandthreecoarseaggregates) using20mmsizeISSHBGmetalincludingcostand conveyanceofallmaterialstositeandincludingfor the mixing, laying and labour charges etc., complete as per standard specification
3
Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad andjoint sealentetc,completeas perstandard specification
4
Chargestowardsfinishingtheconcretesurfacewith power traveler machine rate shall include the cost of fule charges hire for machine and labour charges for operation etc.,,
5
Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
6
Providing and laying tack coat of 2 kgs/10 sqm over the B.T. surface treated with binder using 2 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications.
7
Providing and laying Bituminous concretete 30mm/40mm thick using 0.13 cum of 19.00-9.50mm grade dmetaland 0.17cum of 9.50-2.36mm grade dmetaland 0.26 cum of 2.36mm & below metal with 45.27kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50 . 30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and agregates to require dtemperature and mixing the min required temperature in central hot mix plant 20-30 tonnes capacity conveying themix by tipper trucks top a versite, spreading the mixin required temperature for uniform thickness of 40mm /30mm with mechanical paver to the specified grades and crosssections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen into bitumen tank and metal to fee derunit, labour for attending to paver site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher, Vibratory roller sand all ot her too lsand plants required, including all ot herincidental charges etc., complete using CMP clause 507 of MORTH Rev - 5
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.