Tender For Construction Of Centrifugal Machine Foundation, kichha-Uttarakhand

Kichha Sugar Company Limited has published Tender For Construction Of Centrifugal Machine Foundation. Submission Date for this Tender is 17-07-2023. Dismantling Work Tenders in kichha Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

38572739
Tender For Construction Of Centrifugal Machine Foundation
Open Tender
Indian
Uttarakhand
kichha
17-07-2023

Tender Details

Construction Of Centrifugal Machine Foundation , Dismantling& Re-Construction Of Foundations For Three Nos. Centrifugal Machines With Hopper , Dismantling Of Old Rcc Machine Foundationsincluding Dismantling Machine, Chisel, Hammers, Labour& T&P Etc. Required For Proper Completion Of The Work. Removing The Dismantling Material Within 60 Metres. From Site. , Dismantling Of Old Machine Foundations Rb Work Including Dismantling Machine, Chisel, Hammers, Labour & T&P Etc. Required For Proper Completion Of The Work. Removing The Dismantling Material Within 60 Metres. From Site. , Extra For Cutting Reinforcement Bars Manually / By Mechanical Means In R.C.C. Or R.B. Work ( Payment Shall Be Made On The Cross Sectional Area Of R.C.C. Or R.B. Work ) As Per Direction Of Engineer I / C. , Demolishing Brick Work In Cement Mortar Manually / By Mechanical Means Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material Within 50 Metres Lead As Per Direction Of Engineer-In-Charge. , Dismantling Of Cement Concrete Flooring Including Dismantling Machine, Chisel, Hammers, Labour & T&P Etc. Required For Proper Completion Of The Work. Removing The Dismantling Material Within 60 Metres. From Site. , Earth Work In Excavation / By Mechanical Means ( Hydraulic Excavator ) / Manual Means Over Areas ( Exceeding 30 Cm In Depth, 1.5M In Width As Well As 10 Sq.M On Plan Including Disposal Of Excavated Earth, Lead Up To 50 M And Lift Up To 1.5M, Disposed Earth To Be Levelled And Neatly Dressed In All Kinds Of Soil. , Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centring And Shuttering - All Work Up To Plinth Level :1:4:8 ( 1 Cement : 4 Coarse Sand ( Zone-Iii ) : 8 Graded Stone Aggregate 40 Mm Nominal Size ) , First Class Brick Work ( With Class 100 Bricks ) With 1:4 Cement And Coarse Sand Of Mortar In Foundation & Plinth And Also Including Supply Of All Materials, Labour And T&P Etc. Required For Proper Completion Of Work. , Steel Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Upto Plinth Levelusing Mild Steel And Medium / Tensile Steel Bars. , Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete, Including The Cost Of Centering, Shuttering, Finishing And Reinforcement - All Work Up To Plinth Level In1:1.5:3 ( 1 Cement : 1.5 Coarse : 3 Sand ( Zone-Iii ) : 4 Graded Stone Aggregate 20 Mm Nominal Size ) , Supply And Filling In Plinth With Sand Under Floors Including, Watering, Ramming Consolidating And Dressing Complete. , Proving Pocket Hole 150Mm X 150Mm Squaire And 800Mm Deep New Foundation Including Supply Of All Materials Labour & T & P Etc. Required. , 40Mm Thick Cement Concrete Flooring 1:2:4 ( 1 Cement: 2 Coarse Sand : 4 Graded Stone Aggregate ) With 20Mm Nominal Size Stone Aggregate A Floating Coat Of Neat Cement Including Cement Slurry, But Excluding The Cost Of Nosing Of Steps Etc. Complete. , Chipping Of Unsound Work Concrete Material From Coloum Foundation With Manual Chisel And / Or By Standard Power Driven Percussion Type Or Of Approved Make Including Clenning The Exposed Concrete Surface And Rainforcement With Wire Brushes Etc 75Mm Average Thickness And Disposel Of Debris For All Lead And Lifts All Complete As Per Direction Of Engineer In Charge , Drilling Suitable Holes Or Rebaring With Re-500 Of 20Mm Diameter In Reinforced Of Plan Cement Concrete With Power Driven Drill Machine To A Minimum Depth 100 Mm Upto 200Mmin Rcc Graft Foundation Beams Colums And Slabs To Introduced Steel Baars For Sunshades Balconies Including Fixing Of Steel Baars In Position Using Apoxy Resin Anchor Grout Of Approved Make But Excluding The Cos Of Reinforcement All Complete , Drilling Of Pocket Holes And New Bolt Installation Core Cutting In Rcc Foundation With Power Drill Macjhine Of 100Mm To 150Mm Dia Including Fixing Of Foundation Bolt In Position Using Apoxy Resin Anchor Grout Of Approved Make But Excluding The Cos Of Reinforcement All Complete

Key Value

Document Fees
INR 590 /-
EMD
INR 35000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: Dismantling& Re-construction of foundations for three nos. Centrifugal machines with hopper
Sl. No. Item Description
1Dismantling& Re-construction of foundations for three nos. Centrifugal machines with hopper
2Dismantling of old RCC machine foundationsincluding dismantling machine, chisel, hammers, labour& T&P etc. Required for proper completion of the work. Removing the dismantling material within 60 metres. From site.
3Dismantling of old machine foundations RB work including dismantling machine, chisel, hammers, labour & T&P etc. required for proper completion of the work. Removing the dismantling material within 60 metres. From site.
4Extra for cutting reinforcement bars manually/by mechanical means in R.C.C. or R.B. work(Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer I/c.
5Demolishing brick work in cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
6Dismantling of cement concrete flooring including dismantling machine, chisel, hammers, labour & T&P etc. required for proper completion of the work. Removing the dismantling material within 60 metres. From site.
7Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sq.m on plan including disposal of excavated earth, lead up to 50 m and lift up to 1.5m, disposed earth to be levelled and neatly dressed in all kinds of soil.
8Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
9First class brick work (with class 100 bricks) with 1:4 cement and coarse sand of mortar in foundation & plinth and also including supply of all materials, labour and T&P etc. required for proper completion of work.
10Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelUsing Mild Steel and Medium /Tensile Steel Bars.
11Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level in1:1.5:3 (1 cement : 1.5 coarse : 3 sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
12Supply and filling in plinth with sand under floors including, watering, ramming consolidating and dressing complete.
13Proving pocket hole 150mm X 150mm Squaire and 800mm deep new foundation including supply of all materials labour & T & P etc. required.
1440mm thick cement concrete flooring 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate) with 20mm nominal size stone aggregate a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete.
15Chipping of unsound work concrete material from coloum foundation with manual chisel and/or by standard power driven percussion type or of approved make including clenning the exposed concrete surface and rainforcement with wire brushes etc 75mm average thickness and disposel of debris for all lead and lifts all complete as per direction of engineer in charge
16Drilling suitable holes or rebaring with RE-500 of 20mm diameter in reinforced of plan cement concrete with power driven drill machine to a minimum depth 100 mm upto 200mmin RCC graft foundation beams Colums and Slabs to introduced steel baars for sunshades balconies including fixing of steel baars in position using apoxy resin anchor grout of approved make but excluding the cos of reinforcement all complete
17Drilling of pocket holes and new bolt installation core cutting in RCC foundation with power drill macjhine of 100mm To 150mm Dia including fixing of foundation bolt in position using apoxy resin anchor grout of approved make but excluding the cos of reinforcement all complete
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail