Renewal Of Bt Road At Jeyaraj Nagar 115021R1524 Periyasamy Nagar 1St Street 115021R1430 Kalathupottal Main Road 115021R1440 Neppoliyan 7Th Street115021r1453 Aalavai Nagar 1St Main Road 115022R1516aruldaspurum Main Road 115022R1579 Thiru.Vi.Ka Elementary S, Madurai-Tamil Nadu
TDR : 38557939
Tender Notice
Corrigendum Details
BOQ
Expired
Madurai
Tamil Nadu
Corrigendum : Renewal Of Bt Road At Jeyaraj Nagar 115021R1524 Periyasamy Nagar 1St Street 115021R1430 Kalathupottal Main Road 115021R1440 Neppoliyan 7Th Street115021r1453 Aalavai Nagar 1St Main Road 115022R1516aruldaspurum Main Road 115022R1579 Thiru.Vi.Ka Elementary S
Name of Work: Renewal of BT Road at Jeyaraj nagar 115021R1524 Periyasamy Nagar 1st street 115021R1430 Kalathupottal main road 115021R1440 Neppoliyan 7th street115021R1453 Aalavai Nagar 1st main Road 115022R1516Aruldaspurum main road 115022R1579 Thiru.vi.ka Elementary school road 115022R1549 Christian street 115022R1544 Periyasam Konar street 115022S0165 Ayyanar kovil main road115023R1397 Sellur 60feet Road115023R1375 Package -3
Sl. No.
Item Description
1
Providing and laying tack coat of 2 Kg / 10sqm over the BT surface treated with binder using 2Kgs of bituminous Emulsion for 10 sqm area including cost of bituminuous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 specifications
2
Advance Patchwork 13.20mm Providing Advancve Patchwork using 50mm consolidated Thickness by using 1m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1m3 of Metal For Pre Mixing For existing surface advance Patchwork including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for pre mix carpet only rolling by 60-70KN power roller for pre mix carpet and seal coat seperately including labour charges for spreading the mix for pre mix carpet application of bitumen for seal coat over pre mix carpet, including labour charges for spreadingseal coat seperately over premix carpet etc.including higher charges and fuel charges for, bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
3
Providing and laying bituminous concrete 30/40mm thick using 0.13 cum of 19.00 mm 9.50mm,0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30 kgs of VG30/VG40 bitumen for premixing per 10sq.m including cost and convwyance of ll materials to CMP site heatingthe bitumen and aggregate to requried Temperature and mixing them in requried in central hot mix plant 20-30 ton capacity ,conveying the mix by tipper trucks to paver ite spreading the mix to uniform thickness of 40mm with meachnical paver to the specified grades and cross sections and consolidated by 8-10 tonne vibratory/Pneumatic roller to the requried density etc.including laour for attending to the paver to the site20-30t CMP with bitumen boiler,tipper trucks,Paver Finisher /9mPaver Finisher,Vibratory/Pneumatic roller and roll Other tools and plant Requried,including fuel and all other incidental charges etc.as per Specfication using CMP as per Clause 507 of MORTH Rev-5
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.