| 1 | Scraping old paints with scrappers, sand papering and washing the soap water or soda including scaffolding up to 5m height including cost of all labour, T&P required to complete as direction of EIC. |
| 2 | Painting two coats with approved brand of synthetic enamel paint of approved shade and quality over a coat of approved primer to new wood and iron works including cost of paint, primer, putty, scaffolding, T&P, cost, conveyance of all materials and cost of all labour and T&P required for the work etc. complete as per the direction of EIC. (Paints of Burger/Nerolac/J&N /Asian/ ICIBrand is to be used.) |
| 3 | Finishing wall surface of walls with wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, labour T&P etc. complete the work as per the direction of engineer incharge. |
| 4 | Painting two coats with appd. Brand of Plastic emulsion paint of appd. Shade and quality over a coat of approved primer to inside wall including cost of paint, primer, putty, scaffolding, cost ofall labour and materials required for the work etc. comp. (paints of Berger, Nerolac, J&N & Asian ICIBrand is to be used.) |
| 5 | Weather coat two coats of approved brand and shade overa coat of primer over exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost, conveyance of all materials, cost of all labour, T&P etc. complete as directed by EIC. (Weather coat should of ICI/Berger/Asian is to be used) |
| 6 | Fly ash brick masonry in C.M.(1:6)having minimum crushing strength of 75 Kg/Cm2 and size of 25cm x 12cm x 8cm in super structure with ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, champering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC. |
| 7 | 12mm (1/2\") thick cement plaster (1:6) for finished smooth surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC. |
| 8 | 16mm (5/8\") thick cement plaster (1:6) for finished rough surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC. |
| 9 | Supplying all materials, labour, T&P and fixing wash hand basin of size (24\"\"x18\"\") with hole for pillar taps with cast iron or M.S. brackets painted white including cutting holes in wall and making good the damages etc. all complete as per specification and direction of the Engineer in charges. (Cera / Hindware) |
| 10 | Supplying all materials, labour, T&P and fitting & fixing 15mm dia CP angular stop cock with supply of or jointing materials completeas per specification and direction of the Engineer in charge. (Make:- Plaza) |
| 11 | Supplying all materials, labour, T & P and fitting and fixing 15mm CP 2 way bib cock with C.P.Health Flushet with supply of all jointing materials complete as per specification and direction of the Engineer - in - charge. (Make:- Plaza) |
| 12 | Supplying all materials, labour, T & P and fixing standard sized toughen glass-shelf (600 x 120mm glass shelf with anodized aluminium angle frame, C P Brass bracket and guard rail)fixed to wooden plugs with CP screws as per specification and direction of the Engineer - in - charge. (Make:- Plaza) |
| 13 | Supplying all materials, labour, T&P and fixing B.E mirror of superior glass mounted on 6mm thick A.C sheet or plywood sheet and fixed to wooden plugs with CP screws and washerscomplete as per PH specification and direction of the Engineer in charges.(Make:Golden fish/SaintGobin/ Modi etc.) |
| 14 | Supplying all materials, labour, T&P for fitting & fixing and laying 20mm dia u-PVC pipes (Sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cementetc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. (Pipes of ORIPLAST/ Hariplast / Supreme) |
| 15 | Supplying all materials, labour, T&P for fitting & fixing and laying 25mm dia u-PVC pipes (Sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cementetc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. (Pipes of ORIPLAST/ Hariplast / Supreme) |
| 16 | Supplying all materials, labour, T&P and fitting and fixing 10 liters capacity low level flushing cistern with a pair of cast iron or M.S brackets complete with fitting such as symphonic arrangements 15mm nominal size brass/pvc ball valve with polythine float CP brass handle, unions and couplings for connection with inlet, outlet and overflow pipes, 40mm dia porcelain enameled flush bend, 12mm dia pvc inlet connection pipe including cutting holes and making good the same and connection the flush bend with cistern and closet and connection the inlet pipe with supply main etcall completeas per specification and direction of the Engineer in charge.(Make:-Parryware/ Hind/ Cera.) |
| 17 | Supplying all materials, labour, T&P and fixing Wash Down water closet(European type W.C. pan) with internal \"S\" or \"P\" trap to the floor with wooden plug and chromium plate screws including jointing the trap with soil pipe in cement mortar (1:1) etc. all complete as per specification and direction of the Engineer in charges. (Cera / Hindware) |
| 18 | Supplying all materials, labour, T&P for fitting and fixing and laying 110mm dia PVC pipes class-II (4kg per cm2) with all fittings of oriplast make all round hunching with CC 1:4:8 and top haunchinh with chips concrete in C.C (1:3:6) including supply of all jointing materials like Gaskets, adhesive, solvent, cement etc and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kinda of soil & rock & refilling the trenches including testing etc as per PHspecification and direction of the Engineer in charges. (Supreme) |
| 19 | Providing, fitting and fixing of 32mm thick BWR flush door with both side lamination with 1mm thick laminates as per the specification complete with all materials, inclusive of all hardware material, hinges, nails, screws, doorknobs, handles, topper etc. including the cost of all materials, labour and T&P and overheads etc. complete. The exposed wood work shall be finished with automotive paint. two coats with primer. The rates also includes the cost of 40 x 25mm wooden beading for the partition in front of the door and finished with automotive paints and as per direction of EIC. (BWR board will be of Century / Gattani / Mayur) |
| 20 | Providing and Fixingfile cabinet storage of 450mm deep made of 19mm thick BWR ply wood the edges to be finished with 12mm thick wooden lipping. All the surface to be finished with 1mm thick laminate with approved shade including enamel painting the shele to be provied at 18\" interval. The rate included cost of necessary fittings like Auto CloseHinges, locks handles etc. of any approved make like godrej etc. All complete as per the instruction of Engineer-in-charge. |
| 21 | Providing & Fixing of Armstrong Mineral Fibre Acoustical Suspended Ceiling System with DuneSupreme (Bevelled Tegular) Edge Tiles With Armstrong 15mmExposed GRID. The tiles should have Humidity Resistance (RH) of 99%, NRC 0.5, Light Reflectance =85%, Thermal Conductivity k = 0.052 - 0.057 w/m K, Colour White, Fire Performance UK Class 0 / Class 1 (BS 476 pt - 6 &7) in module size of 600 x 600 x 16mm , suitable for Green Building application, with Recycled content of 44%. The tile shall be laid on Armstrong Silhouette profile grid system with 15mm white flanges incorporating a 6mm central reveal in white/black colour and with a web height of 45mm and a load carrying capacity of minimum 15.68Kgs/M2 & minimum pull out strength of 100 KgsSilhouette, Main Runners & Cross Tees to have mitred ends & “birdsmouth” notches to provide mitred cruciform junctions. The T Sections have a Galvanizing of 90 grams per M2 and need to be installed with Suspension system of Armstrong make. The Tile & Grid system used together should carry a 30 year warranty.To comprise main runner spaced at 1200mm centres securely fixed to the structural soffit using Armstrong suspension system (specifications below) at 1200mm maximum centre.The First/Last Armstrong suspension system at the end of each main runner should not be greater than 450mm from the adjacent wall.Flush fitting 1200mm long cross tees to be interlocked between main runners at 600mm centre to form 1200 x 600 mm module.Cut cross tees longer than 600mm require independent support.600 x 600mm module to be formed by fitting 600mm long flush fitting cross tees centrally between the 1200 mm cross tees.Perimeter trim to be Armstrong wall angles of size 3000x19x19mm, secured to walls at 450 mm maximum centres. |
| 22 | Dismantling and removing RCC columns beams slab staircase landing lintels includingstacking the same for reuse and removing the debris within 50m.lead including cost of alllabours,T & P required for the work etc. Complete as directed by EIC. |
| 23 | Earth work in excavation of foundation treaches in all kinds of soil including moorum, stoney earth and earth mixed with boulders ( except sheet rocks and boulders requiring for blasting) including dressing and levelling the bed up to the required depth and depositing the excavated materials at places away from the work site with all leads and 1ifts, T&P shoring and shuttering and dewatering if required etc. comp. as directed by EIC. |
| 24 | Excavation of foundation in laterite rock or any hard rock (other than granite or disintegrated rock) removed by chiseling including dressing and leveling the bed not exceeding 1.5m in depth and depositing the soil within initial lead of 50mand as per specification approved by the Department & as per direction of Engineer-in-charge. |
| 25 | Filling foundation and plinth with river sand, well watered, rammed including cost, conveyance, royalties of materials, cost of all labour and T&P required for the work etc. complete as per direction of EIC. |
| 26 | P.C.C of prop. (1:3:6) in foundation and floor using 40mm. Size crusher broken hard granite metal of approved quality from approved quarry including lowering,laying concrete to required levels laid in layers not exceeding 150mm thick including cost,conveyance,royalities of all materials,cost of all labour,T & P required for the work etc.required to complete as per direction of EIC. |
| 27 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalitiesof all material,dismantling the centering,shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in.FOOTING |
| 28 | R.C.C M-20 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalitiesof all material,dismantling the centering,shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in COLUMN |
| 29 | Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC |
| 30 | Supplying,fitting,fixing stainless steel gate of grade 304 with made out of structural stainless steel pipe as per design and drawing fixed in proper position with grouted clapms including making good to the damages of walls and floors in all floors including cost,conveyance of materials cost of all labour,T & P etc. required complete as per direction of EIC. |
| 31 | Filling in foundation and plinth or floor with excavated earth or moorum or extra good earth including laying, watering and ramming in 23 Cm (9\") thick layers with all necessary leads and lifts complete with cost of all labour, T&P etc. required to complete as per direction of EIC. |
| 32 | Providing Granite stone prepolished 20mm thick of areaabove 0.40 Sqm in flooring of approved quality, colour and size in floors, treads on steps and landings in all floors at all height on 20mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with neat white cement slurry jointing the tile with neat white cement slurry mixed with required quantities of pigments of approved marks to match the shades of the granite tile if requiredwatering and curing for 21 days, including cost, conveyance, loading, unloading, royaltiesof all materials, cost of all labour, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. |
| 33 | Fly ash brick masonry in C.M.(1:6)having minimum crushing strength of 75 Kg/Cm2 and size of 25cm x 12cm x 8cm in foundation & plinth with ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, champering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC. |
| 34 | Quarrying, collecting, conveying supplying and laying at work site 40mm size BHCB granite stone metal of approved quarry including cost, conveyance, royalties of all materials, cost of all labour, T&P required for the work to complete as per specification and direction of EIC |
| 35 | Quarrying, collecting, conveying supplying and laying at work site 20mm size BHCB granite stone chips of approved quarry including cost, conveyance, royalties of all materials, cost of all labour, T&P required for the work to complete as per specification and direction of EIC |
| 36 | R.C.C 1:1 1/2:3 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalitiesof all material,dismantling the centering,shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills.in SLAB |
| 37 | 12mm thick cement plaster (1:4) for finished smooth to masonry surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC. |
| 38 | Supplying all materials, labour, T&P for fitting and fixing and laying 110mm dia UPVC pipes class-II (4kg per cm2) with all fittings ofall round hunching with CC 1:4:8 and top haunchinh with chips concrete in C.C (1:3:6) including supply of all jointing materials like Gaskets, adhesive, solvent, cement etc and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kinda of soil & rock & refilling the trenches including testing etc as per PHspecification and direction of the Engineer in charges. (Make:ORIPLAST/ Hariplast / Supreme) |
| 39 | Supplying all materials, labour, T&P for fitting and fixing and laying 160mm dia UPVC pipes class-II (4kg per cm2) with all fittings ofall round hunching with CC 1:4:8 and top haunchinh with chips concrete in C.C (1:3:6) including supply of all jointing materials like Gaskets, adhesive, solvent, cement etc and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kinda of soil & rock & refilling the trenches including testing etc as per PHspecification and direction of the Engineer in charges. (Make:ORIPLAST/ Hariplast / Supreme) |
| 40 | Removing old lime or cement plaster from walls including raking out joints 12mm deep andremoving the debris within 50m lead. including cost of alllabours,T & P required for the work etc. Complete as directed by EIC. |
| 41 | Providingand applying water proffing treatment(Two component glass fibre reinforced specially formulated acrylic modified cementious eklastic coating system ) using Sika / equivalent topseal 109 @ 2.50 Kg/Sqm and Sika / equivalent feb-1 or equivalent (glass fibre cloth) including all cost of conveyance ,labour T&P etc complete as per direction of EIC. |
| 42 | Dismantling brick or stone masonry in CM under 3m height including stacking the stacking the useful materials for reuse and removing the debris within 50m lead. including cost of alllabours,T & P required for the work etc. Complete as directed by EIC. |
| 43 | Providing, fitting and fixing of Combiflex expansion joint (Sika) of 2mm thick 200mm wide including two layers adhesive including cost of all labour and materials, T&P etc. complete as per direction of EIC. |
| 44 | 2.5cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips of approved quality from approved quarry including hoisting and laying concrete,watering and curingincluding cost, conveyance, royalities of all materials, cost of all labour, T & P required for the work etc.required to complete as per direction of EIC. |