Construction Of 100 Bedded Girls Hostel In Oav At Uttarkul (Binjharpurblock) In The District Of Jajpur
Tender Value
3.92 Crore
Estimated cost
Bid Submission
24 Jul 2023
0 days left
EMD
3.92 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
panikoili → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of 100 Bedded Girls Hostel In Oav At Uttarkul ( Binjharpurblock ) In The District Of Jajpur
BOQ
| Sl. No. | Item Description |
| 1 | CIVIL WORKS(PART-I) Construction ofsingle under reamed bored compaction pile foundation of 300mm dia upto 6.0mlongwith RCC M-25 using crushed broken hard granite chips of 20mm and down graded with required design with cost conveyance taxes cost of all materials and labour etc complete as per specification and direction of Engineer in charge Pile upto 6mtr. long |
| 2 | Extra 2 mtr. long |
| 3 | Earth work in excavation of foundation in hard soil including dressing and levelling the beds within 50m. initial lead and 1.5m. initial lift with cost, conveyance, taxes as per specification and directionof Engineer in charge |
| 4 | Filling foundation and plinth with good quality river sand with watering and ramming incluing cost, conveyane, cost of all materials and labour etc complete as per direction and specification of Engineer in charge |
| 5 | Filling foundation and plinth with excavated earth incluing cost, conveyane, cost of all materials and labour etc complete as per direction and specification of Engineer in charge GF |
| 6 | Conveyance of excavated earth by mechanical means incluing 5 km. lead complete with cost, conveyane, cost of all materials and labour etc complete as per direction and specification of Engineer in charge GF |
| 7 | Cement concrete (1:3:6) in foundation and plinth using 4cmsize hard crusher broken granite stone metal of approved quality and from approved quarry including lowering, laying concrete watering, curing etc, complete to required levels laid in layers to required thickness including cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc, complete as per specification & direction of the Engineer-in-charge GF |
| 8 | Fly Ash Bricks masonry (25cmx12cmx8cm) having crushing strength not less than 75Kg/sqcm in cement mortar (1:6) after immersing the bricks for six hours in water before use in Foundation and Plinth for ornamental flower beds, plinth molding and similar such type of works with all necessary projections, cutting, circular molding, corbelling, watering, curing etc. including cost, conveyances, royalties ofmaterials and cost of all labour with T&P required for the work etc. complete along with testing of strength as per relevant I.S.standard andas per specification & direction of Engineer-in-charge.Ground floor |
| 9 | Fly Ash Bricks masonry (25cmx12cmx8cm) having crushing strength not less than 75Kg/sqcm in cement mortar (1:6) after immersing the bricks for six hours in water before use in Superstructure and for ornamental flower beds, plinth molding and similar such type of works with all necessary projections, cutting, circular molding, corbelling, watering, curing etc. including cost, conveyances, royalties ofmaterials and cost of all labour with T&P required for the work etc. complete along with testing of strength as per relevant I.S.standard andas per specification & direction of Engineer-in-charge.Ground floor |
| 10 | 1st floor |
| 11 | 2nd floor |
| 12 | Terrace floor |
| 13 | Fly Ash Bricks masonry (25cmx12cmx8cm) having crushing strength not less than 75Kg/sqcm in cement mortar (1:4) after immersing the bricks for six hours in water before use in Superstructure and for ornamental flower beds, plinth molding and similar such type of works with all necessary projections, cutting, circular molding, corbelling, watering, curing etc. including cost, conveyances, royalties ofmaterials and cost of all labour with T&P required for the work etc. complete along with testing of strength as per relevant I.S.standard andas per specification & direction of Engineer-in-charge.Ground floor |
| 14 | 1st floor |
| 15 | 2nd floor |
| 16 | RCC work ofM-25 with 20mm and down graded size crushed stone aggregates mixed by concrete mixer, laying in layers and compacting by vibrator & all leads and lifts including frame works including cost, conveyance, cost of all labour, T&P, cost of all materials etc. complete as per direction and specification of Engineer-in-charge. Pile Cap |
| 17 | Plinth Beam |
| 18 | Column superstructure GF |
| 19 | 1st floor |
| 20 | 2nd floor |
| 21 | Terrace floor |
| 22 | LintelGF |
| 23 | 1st floor |
| 24 | 2nd floor |
| 25 | Terrace floor |
| 26 | ChajjaGF |
| 27 | 1st floor |
| 28 | 2nd floor |
| 29 | Terrace floor |
| 30 | Staircase GF |
| 31 | 1st floor |
| 32 | 2nd floor |
| 33 | Roof Beam GF |
| 34 | 1st floor |
| 35 | 2nd floor |
| 36 | Terrace floor |
| 37 | Roof slab GF |
| 38 | 1st floor |
| 39 | 2nd floor |
| 40 | Terrace floor |
| 41 | Shelves GF |
| 42 | 1st floor |
| 43 | 2nd floor |
| 44 | Cutting, straightening coiled or bent up M.S. Rod or tor steel using SAIL/RINL/TATA/JINDAL STEEL/ SHYAM STEEL includingbending, binding, welding and joining if necessary and tying the grills and placing in position as required for R.C.C. Work and for providing fan hooks as required, hoisting, lowering, laying including cost, conveyances, taxes of M.S. Rod or tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all floors (payment will be made on standard weight of B.I.S. for M.S. Rods or tor steel only) etc. complete as per specification & direction of Engineer-in-charge Ground floor |
| 45 | 1st floor |
| 46 | 2nd floor |
| 47 | Terrace floor |
| 48 | Supplying, fitting & fixing in all floors of M.S.grillsgate in doors and windows with top rails, steel windows, critical frames for windows balustrades of stair case and parapet railing made out of M.S.square bar/flat as per approved drawing and design including making holes in walls and RCC structure, wood work etc and making good to the damages to walls with cement concrete(1:2:4) with hard crusher broken granite stone chips of 12mm to 20mm size(20mm size not to exceed 25%) of approved quality with cost of all materials with cost of welding all T&P, sundreis etc complete in all respect as per specification and direction of Engineer in charge(screws and other hardward required materials to be used in the work shall be of approved quality and specification and shall have to be supplied by the contractor at his own cost |
| 49 | Supplying fitting and fixing of 125mm x 65mm (after moulding) well blendbeautiful WPC wood plastic composite choukath in door opening area in wall surface of WPC chaukaths 150mm anchore fastner screw cutting the holes filling the cutting holes in cement concrete (1:2:4) etc. complete as per specificastion and direction of Engineer in charge. In all floors |
| 50 | Supplying and Providing of 30mm thick flush door shutters with approved quality of 30mm thick BWR block board pasted with 1mm thick sunmica on both side of approved desig and quality with cost of materials and labour etc complete as per specification and direction of Engineer in charge In all floors |
| 51 | Supplying and fitting fixing of Un-plasticized Poly Vinyl Chloride (UPVC) (FENESTA/NICL/VEKA LTD) Three track Three panel Sliding Window-60 series duly manufactured using UPVC reinforced profiles of 108mmx45mmx2.5mm for outer frames, and window sash of 39mmx58mmx2.25mm forcapable of mounting single glazing system, structurally reinforced with hot dip galvanized upto 50 microns of minimum thickness of 1.5mm prefabricated and welded through fluxion welding the door sash shall be fitted with 6mm thick clear toughened glass of SAINT-GOBAIN make duly fixed with EPDM weathering seal resistant accessories the clipping locking system made of aluminum 1 No. per set of sashes and the system is to be installed at the site using anchor fasheners,l silcon rubber sealant easy glazing/ deflating at site etc. including cost and conveyance of all materials accessories, labour charges, materials and conduct conforming to ASTMD 638-14 EN-477-95 and other applicable codes and standard |
| 52 | Supplying and fitting fixing of Un-plasticized Poly Vinyl Chloride (UPVC) (FENESTA/NICL/VEKA LTD) Casement Ventilator duly manufactured using UPVC reinforced profiles of 60mmx55mmx2.5mm for outer frames, 75mmx60mmx2.25mm for casement Window sash profile and 74mmx60mmx2.5mm mullion profile capable of mounting single glazing system, structurally reinforced with hot dip galvanized upto 50 microns of minimum thickness of1.5mm prefabricated and welded through fluxion welding the door sash shall be fitted with 12mm thick WPC Board of Greenly make duly fixed with EPDM weathering seal resistant accessories the clipping locking system made of aluminum 1 No. per set of sashes and the system is to be installed at the site using anchor fasheners,l silcon rubber sealant easy glazing/ deflating at site etc. including cost and conveyance of all materials accessories, labour charges, materials and conduct conforming to ASTMD 63-14 EN-477-95 and other applicable codes and standards. |
| 53 | Providing 6mm thick cement plaster in cement mortar (1:4) in all floors finished smooth to inside surface of brick walls after racking out joints, scrapping & cleaning the surface & finishing the plaster surface smooth using wooden float only to proper plumbs & level and making necessary grooves, beads & drip course to give required ornamental finish as per drawing, watering, curing, scaffolding, screening sand etc. complete with cost, conveyances, royalties ofmaterials and cost of all labour with T&P, sundries required for the work etc. complete as per specification & direction of Engineer-in-charge(Ground floor) |
| 54 | 1st floor |
| 55 | 2nd floor |
| 56 | Terrace floor |
| 57 | Providing 12mm thick cement plaster in cement mortar (1:6) in all floors finished smooth to outside surface of brick walls after racking out joints, scrapping & cleaning the surface & finishing the plaster surface smooth using wooden float only to proper plumbs & level and making necessary grooves, beads & drip course to give required ornamental finish as per drawing, watering, curing, scaffolding, screening sand etc. complete with cost, conveyances, royalties ofmaterials and cost of all labour with T&P, sundries required for the work etc. complete as per specification & direction of Engineer-in-charge(Ground floor) |
| 58 | 1st floor |
| 59 | 2nd floor |
| 60 | Terrace floor |
| 61 | Providing16mm thick cement plaster in cement mortar (1:6) in all floors finished smooth to inside ceiling surface of brick walls after racking out joints, scrapping & cleaning the surface & finishing the plaster surface smooth using wooden float only to proper plumbs & level and making necessary grooves, beads & drip course to give required ornamental finish as per drawing, watering, curing, scaffolding, screening sand etc. complete with cost, conveyances, royalties ofmaterials and cost of all labour with T&P, sundries required for the work etc. complete as per specification & direction of Engineer-in-charge(Ground floor) |
| 62 | 1st floor |
| 63 | 2nd floor |
| 64 | Terrace floor |
| 65 | Providingfitting and fixing of Vitrified Industrialtiles in floors of size (300mm x300mm ) over 20mm thick bed of cement mortar(1:4)jointed with neat cement slurry mixed with pigment to match the shades of tiles including cost, conveyances, royaltiesofmaterials and cost of all labour with T&P required for the work etc, complete as per specification & direction of the Engineer-in-chargeGF |
| 66 | 1st floor |
| 67 | 2nd floor |
| 68 | Providingfitting and fixing of Kotatiles in floors of above 0.10 sqm size in floorover 20mm thick bed of cement mortar(1:4)jointed with neat cement slurry mixed with pigment to match the shades of tiles including cost, conveyances, royaltiesofmaterials and cost of all labour with T&P required for the work etc, complete as per specification & direction of the Engineer-in-chargeTerrace floor |
| 69 | Providingfitting and fixing of Kotatiles in floor ofover 20mm thick bed of cement mortar(1:4)jointed with neat cement slurry mixed with pigment to match the shades of tiles including cost, conveyances, royaltiesofmaterials and cost of all labour with T&P required for the work etc, complete as per specification & direction of the Engineer-in-chargeGF |
| 70 | Providingfitting and fixing of Kotatiles in dadoes ofover 12mm thick bed of cement mortar(1:3)jointed with neat cement slurry mixed with pigment to match the shades of tiles including cost, conveyances, royaltiesofmaterials and cost of all labour with T&P required for the work etc, complete as per specification & direction of the Engineer-in-chargeGF |
| 71 | Terrace floor |
| 72 | Providingfitting and fixing of Granite tiles in floors of size over 20mm thick bed of cement mortar(1:4)jointed with neat cement slurry mixed with pigment to match the shades of tiles including cost, conveyances, royaltiesofmaterials and cost of all labour with T&P required for the work etc, complete as per specification & direction of the Engineer-in-chargeGF |
| 73 | Providingfitting and fixing of Vitrifiedtiles Colour printedin floors of size (600mm x 600mm ) over 20mm thick bed of cement mortar(1:4)jointed with neat cement slurry mixed with pigment to match the shades of tiles including cost, conveyances, royaltiesofmaterials and cost of all labour with T&P required for the work etc, complete as per specification & direction of the Engineer-in-chargeGF |
| 74 | 1st floor |
| 75 | 2nd floor |
| 76 | Providingfitting and fixing of Vitrifiedtiles Colour printedin dadoes (600mm x600mm ) over12mm thick bed of cement mortar(1:3)jointed with neat cement slurry mixed with pigment to match the shades of tiles including cost, conveyances, royaltiesofmaterials and cost of all labour with T&P required for the work etc, complete as per specification & direction of the Engineer-in-chargeGF |
| 77 | 1st floor |
| 78 | 2nd floor |
| 79 | Providing, Fitting & Fixing of Stainless steel of 304 grade in handrailing of 50mm diaof 2mm thick circular pipewith balustrade of size 32mmX32mm X2mm @ 0.90mtr. C/C and stainlesssquare pipes bracing of size 32mmx32mmx2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc. with cost, conveyance ofMaterials, Labour, TandP etc required for the complete in all respect and as per specification & direction of Engineer-in-charge |
| 80 | Distempering two coats over a coat of primer with any approved shade and quality with oil bound distemper in interior surface of walls up to any height & in all floors to give an even shade including cost, conveyance, taxes of all materials with labour, T&P required for the work complete in all respect as per direction of the Engineer-in-charge GF |
| 81 | 1st floor |
| 82 | 2nd floor |
| 83 | Terrace floor |
| 84 | Painting two coats with anti-fungal resistance Weather Seal Coat over a coat of primerof approved shade upto any height by means of brush to outside surface of walls after cleaning the surface including watering, curring etc. complete in all floors including cost, conveyance, taxes of all materials, labours sundries T&P required for the work as per specification and direction of Engineer in charge Ground floor |
| 85 | 1st floor |
| 86 | 2nd floor |
| 87 | Terrace floor |
| 88 | Painting two coats with approved Synthetic enamel paints of approved colour, shade over a coat of primer in Iron work including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour TandP etc complete as per specification and direction of Engineer in charge GF |
| 89 | 1st floor |
| 90 | 2nd floor |
| 91 | Terrace floor |
| 92 | Supplying, Diluting &SpreadingChemical Emulsion like CHLORPYRIPHOSOROther Chemical approved bythe Central Insecticides Board as directed by the manufacturer and spraying the mixture uniformly by the sprayer aspreconstructional antitermitetreatment and creating a chemical barrier under and around the column pits, wall trenches, basement excavation,top surface ofplinth filling, junction of walls and floorsalong with externalperimeter of thebuilding, expansion joints, surrounding the pipes and conduits etc. complete at the rate of 7.5 litres (or as directed by the manufacturer) per sqm on vertical and 5.0 litres per sqm on horizontal surfaces, 50% of the emulsion to be filled in center to center etc. complete as per the holes made in trenches at 150m.m IS:6313/1981(Part-II) completeincludingcost, conveyance, loading, unloading and ,es of all materials,cost of all labour, T&P, sundries and scaffoldingwhere required for the work etc.as directed by the Engineer -in -charge.( The payment shall be made on the basis of theactual measurement of the plinth area of the building at Ground Floor and vertical faces will not be measured for payment) |
| 93 | Providing 2.5cm thick grading concrete of prop.(1:2:2) on roof slab using 4.7 mm size H.G. chips of approved quality & from approved quarry including watering, curing withcost, conveyances, taxes of all materials, cost of all labour, T&P required for the work etc. complete as per direction of Engineer-in-charge FF |
| 94 | 2nd floor |
| 95 | Terrace floor |
| 96 | Supplying fitting and fixing of Rain water pipe 100mm dia PVC pipeincluding cost, conveyance, taxes of all materials with labour, T&P required for the work complete in all respect as per direction of the Engineer-in-charge |
| 97 | EI Work- Recessed wiringto light point/ fan point/Exhaust fan point/Call bell point with 1.5sqmm FR LS PVC Insulated single core multistarand copperConductorof ISI marked with 20mm dia non metalic PVC flexible conduct with 5Amps semi modular type switch socket & 1.5sqmm FR PVC Single core multistrand copper conductor as earth wire includingallaccessories and connection as per direction of Engineer in charge (Make- Finolex / L&T/ Havells ) - light pointGroup-A |
| 98 | -do-light pointGroup-B |
| 99 | -do-light pointGroup-C |
| 100 | -do-Fan pointGroup-B |
| 101 | -do- Fan pointGroup-C |
| 102 | -do-Call Bell pointGroup-C |
| 103 | Supply and fixing of separate metal box 150x75x60mm deep on surface with laminated cover for fixing 5/6Amps switch & socket etc as per direction of Engineer-in-charge.Make-Anchor/Cona |
| 104 | Supply and fixing of 5/6Amps socket on existing board.Make-Anchor/Cona |
| 105 | Supply and fixing of metal Box of 180mm x100 X 60 mm nominal size of surface or in cress with suitable size of phenolic laminated sheet cover infront including providing and fixing of 5 pin,15/16 Amp paino type socket outlet and 15/16 Amp piano typeswitch ISI marked connection painting etc as required complete in all respect as per direction of Engineer in charge(Make- Anchor/Cona) |
| 106 | Recessed wiring to submain in the following sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked conforming to IS-694/1990 in the following mm dia non-metallic heavy duty flexible conduit 1.6 mm thick along with the following sq.mm FR PVC insulatedsingle core multistrand copper conductoras earth wire as required complete in all respect as per direction of Engineer-in-charge.(Make of wire-Finolex/L&T/Havells)2x1.5+1x1.5 sqmm (Extra sub main) |
| 107 | 2x2.5 +1x1.5 sqmm (from MCB Box to switch board & power point) |
| 108 | 2x4 sq mm+1x1.5 sqmm (For AC) |
| 109 | 4x6+2x2.5 sqmm(Form MCCB cum busbar to TPN MCB Box ) |
| 110 | 4x16+2x10 sqmm(Form Main panel to Aux panel) |
| 111 | Supply & drawing of following pvc wire in existing wiring for D.G.supply as per direction of Engineer-in-charge.(Each room 1no fan & 1no light including Toilet & verandah) 2x1.5sqmm form room to TPN MCB Box. |
| 112 | 2x4sqmm from TPN MCB Box to Auxilary panel board. |
| 113 | 2x6sqmm fromAuxilary panel board Ground floor Main panel. |
| 114 | Supply and fixing Earthing with copper earth plate 600 mm X 600 mm X 3.15 mm thick ISI marked including accessoriesas required. |
| 115 | Extra for using salt & charcoal for Earthing. |
| 116 | Supply and fixing ofEarthing G.I. Pipe 3mtr long 40mm dia ISI Marked including all required acessories. |
| 117 | Providing and fixing 8 SWG (4 mm) dia copper wire on surface or in recess for loop earthing as required |
| 118 | Supply and fixing of Ding Dong(call Bell).Make-Anchor/Cona |
| 119 | Supply and fixing of following way single pole and neutral sheet steel MCB distribution board 250V on recess complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, detachable gland plate, interconnections, phosphatized and powder painted including earthing etc. as required (but with out MCB/ RCCB/ Isolator) Make-siemens/ Legrand/schnider8way TPN Double door MCB BOX |
| 120 | 12wayDouble door MCB BOX |
| 121 | Supply and fixing of following MCB \"C\" series model DX-3 suitable for loads of the following poles in theMCB DB ISI marked complete with connections testing and commissioning etc (Make- siemens/ Legrand/schnider ) 6/10Amps single pole MCB( Indivisuly to switch board for vernda & separate 5/6Amps socket) . |
| 122 | 10Amps double pole MCB (Indivisuly to switch board of each room & DG Supply on each TPN MCB Box.) |
| 123 | 32Amps double pole MCB for AC Connection. |
| 124 | 63Amps four pole MCB to 6way TPN Box as main. |
| 125 | 32Amps double pole MCB for 12way MCB Box |
| 126 | Supply and fixing of Bakelite Angle holder/Batten Holder of ISI marked in place of ceiling Rose completein all respect as per direction of Engineer in charge (Make : Cona / Anchore) |
| 127 | S/F of 1x30watt LED Tube light fitting with complete as per direction of Engineer-in-charge.Make- Philips/Bajaj |
| 128 | Supply and fixing of 9watt LED lamp.Make-Havells/Philips |
| 129 | Supply and fixing of 18watt round Type LED celling light (8\"x8\") with complete as per Direction of Engineer-in-charge.Make-Philips/Bajaj/Crompton |
| 130 | Supply and fixing of 90watt 5700K LED asymmetric optic (ISI marked) street light versatile diacast alluminiumIP66 roadway luminair with high power LEDs as light source and electronic driver with heavy duty GI bracket 36mm dia and required length complete with all connnection testing and commissioning etc as required as per direction of Engineer-incharge (Make:Bajaj / Philips / Crompton) |
| 131 | Supply of 4x1.5sqmm 4core copper non-armoud cable for streetlight Supply.Make-Polycap/Havells |
| 132 | Supply and fixing of 120sqmm 3.5core Allum Armoud cable for main supply.Make-Polycap/Havells |
| 133 | Laying of one number of PVC insulated and PVC sheathed / XLPE power cable of 1.1KV grade of size not exceeding 25 sq.mm direct in ground including excavation, sand cushing, protective covering and refilling the trench etc. as required. |
| 134 | Laying of cable on wall surface with clamping. |
| 135 | Supplying and making end termination with brass compression gland and aluminum lugs for following size of PVC insulated and PVC sheathed / XLPE aluminum cable of 1.1 KV as required - 3.5x120sqmm |
| 136 | 4x16sqmm |
| 137 | S/Fof 1200mm sweep white/milky colour ceiling fanwith step type electronics regulator ISI Markedincludingconnection complete in all respect as per direction of Engineer in charge (Havells velocity/Crompton jura/Usha striker) |
| 138 | Supply and fixing of heavy duty type Extra fan down rod 24x3cm |
| 139 | Supply and fixing offan hock. |
| 140 | S/Fof Heavy dutyExahust Fan 300mm sweep with lovers including connection testing and commissioning complete in all respect as per direction of Engineer in charge(Make Almonard/Havells/Crompton) |
| 141 | Supply and fixing of computor point const of 3nos 5Amps switch & socket with a suitable board as per direction of Engineer-in-charge.Make-Anchor/Cona |
| 142 | Supply and fixing of A.C. point const of15Ampssocket with 32Amps Double pole MCB with a suitable board as per direction of Engineer-in-charge.Make-Anchor/Cona |
| 143 | Supply and fixing of 3phase distribution panel boardmade of 16swg SS Sheetwith 1No 125Amp 25KA TPN MCCB and Busbar30 x 5mm size electrolytic copper flat with 3Nos micro LED indicatorwithcompleteas per direction of Engineer in-charge (Legrand/L&T/C&S) |
| 144 | Supply and fixing of 3phase distribution panel boar made of 16swg SS Sheetwith 1No 315Amp 50KA 4pole MCCB and Busbar40 x 5mm size electrolytic copper flat,3nos 160Amps 4 pole MCCB, 3nos 63Amps 2 pole MCB with 3Nos micro LED indicator & measurement meter completeas per direction of Engineer in-charge (Legrand/L&T/C&S) |
| 145 | PH work- Supplying all materials, labour, T&P and providing and fixing to wall or ceiling and floor CPVC pipesconforming to IS:15778 having thermal stability for hot and cold water supply, including all CPVC plain and brassthreaded fittings including fixing the pipe with clamps at 1.00. spacing. This includes Jointing of pipes & fittings with one step CPVC solvent cement and testing of Jointsall complete as per specification and direction of the Engineer in charge.20mm dia CPVC pipe In ground floor |
| 146 | 25mm dia C-PVCPipe |
| 147 | 32mm dia C-PVC Pipe |
| 148 | In 1st floor 20mm dia C-PVCPipe |
| 149 | 25mm dia C-PVCPipe |
| 150 | 32mm dia C-PVC Pipe |
| 151 | In 2nd floor 20mm dia C-PVCPipe |
| 152 | 25mm dia C-PVCPipe |
| 153 | 32mm dia C-PVC Pipe |
| 154 | Supplying all materials, labour, T&P and providing and fixing to wall or ceiling and floor pvc pipesconforming to ASTM-D-1785/89 (Sch-80) and pipe fittings of the following nominal bore with clamps including making good the wall, ceilingand floor all complete as per specification and direction of the Engineer in charge. In ground floor25mm dia PVC ASTM-D ( Sch-80) |
| 155 | 32mm dia PVC ASTM(SCH-80) Pipe |
| 156 | 40mm dia ASTM ( Sch-80 ) PVCPipe |
| 157 | In First Floor25mm dia PVC ASTM-D ( Sch-80) |
| 158 | 32mm dia PVC ASTM(SCH-80) Pipe |
| 159 | 40mm dia ASTM ( Sch-80 ) PVCPipe |
| 160 | In 2ndFloor25mm dia PVC ASTM-D ( Sch-80) |
| 161 | 32mm dia PVC ASTM(SCH-80) Pipe |
| 162 | 40mm dia ASTM ( Sch-80 ) PVCPipe |
| 163 | In 3rd floor 25mm dia PVC ASTM-D ( Sch-80) |
| 164 | 32mm dia PVC ASTM(SCH-80) Pipe |
| 165 | 40mm dia ASTM ( Sch-80 ) PVCPipe |
| 166 | 50mm dia ASTM ( Sch-80 ) PVCPipe |
| 167 | Supplying all materials,labour,T&P and cutting holes through existing brick work including making good the damages in cement mortar(1:4) for taking GI pipes and fittings/PVC pipes and fittings etc.all complete as per PH specification and direction of the Engineer-in-charge.In ground floor 250mm thick wall |
| 168 | In first floor 250mm thick wall |
| 169 | In 2ndfloor 250mm thick wall |
| 170 | Supplying all materials , labour, T&P and cutting holes in RCC floors and roofs upto 19cm thick for passing P.V.C pipes and G.I fittings etc. , and repairing the holes after insertion of pipe etc. with cement concrete (1:2:4) including finishing complete so as to make it leak-proofas per P.H. specification and direction of Engineer-in-charge In ground floor |
| 171 | In first floor |
| 172 | In 2nd floor |
| 173 | Supplying all materials , labour, T&P and cutting grooves in pucca floors and walls for taking P.V.C pipes and G.I fittings etc. and making good the damagesincluding finishing complete as per P.H. specification and direction of Engineer-in-charge.In ground floor |
| 174 | In first floor |
| 175 | In 2nd floor |
| 176 | Supplying all materials , labour, T&P and fitting and fixing brass/CP fittings of following nominal bore with supply of all jointing materialscomplete as per P.H. specification and direction of Engineer-in-charge.15mm C.P.Bib cock(Plaza make/Amber /Aquatic make ) . |
| 177 | 15mm C.P.Long Body Bib cock (Plaza make/Amber /Aquatic make ) |
| 178 | 15mm C.P.Two way Bib cock .(Plaza make/Amber /Aquatic make ) |
| 179 | 15mm dia CP Helth faucet.(Plaza make/Amber /Aquatic make ) |
| 180 | 15mm dia CP Angle Stop cock.(Plaza make/Amber /Aquatic make ) |
| 181 | 20mm dia CP Concealed Stop cock(Plaza make/Amber /Aquatic make ) |
| 182 | 25mm dia brass fullway valve(Shakti Make) |
| 183 | 32mm dia Brass fullway Vave (Shakti make) |
| 184 | 40mm dia brass fullway valve(Shakti Make) |
| 185 | 50mm dia brass fullway valve(Shakti Make) |
| 186 | 15mm dia. C.Pextension piece |
| 187 | 15mm dia. C.P flange |
| 188 | 125mm dia CP gratting |
| 189 | 15mm C.P.Pillar cock(Plaza make/Amber /Aquatic make ) |
| 190 | Supplying all materials ,labour ,T&P and fitting and fixing CP shower with 15mm or 20mm inlet including polishingetc.all complete as perspecification and direction of Engineer-in-charge. 15mm CP Revolving shower with shower Arm. (Plaza make/Amber /Aquatic make ) |
| 191 | Supplying all materials,labour,T&P and fixing Rotational moulded polyethylene cylindrical vertical water storage tanks conforming to IS : 12701--1996 including cutting holes through the tank and fixing mild steel tubes and fittings and providing extra sockets and jam nuts, fixing ball valve etc, including hoisting upto a height of 5 metres above ground level and placing the tank to the required position and providing 1st class K.B brickwork in cement mortar (1:6) of 0.46m height in staging and in circular protection wall to support the tank, 12mm thick cement plaster (1:6) over brickwork, R.C.C slab of size 1.60mx1.60m and 0.10m thick, R.C.C beam of 0.25mx0.30m and 2.60m average length in cement concrete(1:2:4) using 12mm size h.g chips including centering and shuttering,watering, curing, conveyance of all materials to worksite etc all complete as per specification and direction of the Engineer in charge. InThird floor 2000 litre capacity water storage tanks |
| 192 | Supplying all materials ,labour ,T&P and fixing 10 litres capacity PVC low level flushing cistern with a pair of PVC brackets complete with fittings such as pvc siphonic arrangements, 15mm dia nominal size pvc ball valve with polythene float ,pvchandles, unions and couplings for connection with inlet, outlet and overflow pipes, 32mm dia CP long flush bend, 15mm dia pvc inlet connection pipe including cutting holes and making good the same and connecting the flush bend with cistern and closet , and connecting the inlet pipe with supply mainetc.all complete as perspecification and direction of Engineer-in-charge .10 ltrs. capacity PVC L.L cistern (Slimline- Deluxe-white-Parryware) |
| 193 | Supplying all materials, labour, T&P and providing, fitting and fixing submersible pump with squirrel cage induction type submersible type submersible electric motor to run on 3 phase/1 phase line voltage ranging from 320 volt to 450 volt conforming to IS: 8034/89 with following specifications with suitable control panel, jointing with GI/PVC/HDPE pipes, electrification, testing, commissioning, trial running, conveyance of all materials to worksite, payment of taxes etc all complete as per specification and direction of the Engineer in charge 2 H.P three phase 3 stage head range 30 to 54 metres, discharge 155 to 110 L.M.P with outlet dia of 32mm 2 H.P three phase 3 stage head range 30 to 54 metres, discharge 155 to 110 L.M.P with outlet dia of 32mm |
| 194 | Supplying all materials, labour, T&P and providing, fitting and fixingopen well submersible pump with squirrel cage induction type submersible type submersible electric motor to run on 3 phase/1 phase line voltage ranging from 320 volt to 450 volt conforming to IS: 8034/89 with following specifications with suitable control panel, jointing with GI/PVC/HDPE pipes, electrification, testing, commissioning, trial running, conveyance of all materials to worksite, payment of taxes etc all complete as per specification and direction of the Engineer in charge . 1 H.P three phase 3 stage head range 30 to 54 metres, discharge 155 to 110 L.M.P with outlet dia of 32mm open well Submersible pump |
| 195 | DOL Control panel |
| 196 | 40mm dia steel short piece |
| 197 | Well cap |
| 198 | 50mm size CI bracket |
| 199 | 2.50sqmm flat cable |
| 200 | 20mm dia rigid UPVC pipes |
| 201 | Steel rope with cover |
| 202 | 32mm dia HDPE pipe |
| 203 | Labour charges for lowering including transportation |
| 204 | Supplying all materials,labour,T&P and fitting and fixing U-PVC SWR soil waste ventilating pipes and fittings of the following outside diameter conforming to ISI No.13592/1992 to walls with nails,bobbins and wooden plugs or laying in trenches including jointing with supply of approved rubber lubricant by non-heat application method/as per manufacturer\"s specification,testing,earthwork in excavation in all kinds of soil and refilling of trenches as per specification and direction of Engineer-in-charge .110mm dia U-PVC SWR Pipe (Supreme/Ashirvad) |
| 205 | 110mm dia U-PVC Door crossTee |
| 206 | 110mm dia U-PVC Plain Tee |
| 207 | 110mm dia U-PVC Door Tee |
| 208 | 110mm dia U-PVC Door Bend |
| 209 | 110mm dia U-PVC Plain Band |
| 210 | 110mm dia U-PVC Plain Shoe Bend |
| 211 | 110mm dia U-PVC \"P\"Trap |
| 212 | 110mm dia U-PVC Offset without ear |
| 213 | 110mm dia U-PVC Socket plain |
| 214 | 110mm dia U-PVC Cowl |
| 215 | 110mm dia U PVCSWRClamp |
| 216 | Supplying all materials , labour, T&P and cutting holes through existing brickor laterite masonry wall for takingU-PVC / HCI pipes and fittings including making good the damages etc. all complete as per P.H. specification and direction of Engineer-in-charge |
| 217 | Supplying all materials, labour, T&P and cutting of R.C.C roof or cornice for taking H.C.I pipes and making good the damages etc all complete as per P.H.Specification and direction of the Engineer in charge. |
| 218 | Supplying all materials , labour, T&P and cutting of RCC chajja for taking HCI or U-PVC pipe and fittings including making good the damages etc. all complete as per P.H. specification and direction of Engineer-in-charge |
| 219 | Supplying all materials , labour, T&P andfixing Vitreous chinawater closet ,squattingpan ( Indian type W.C. pan / Orissa pattern squatting pan ) duly embedded in cement concrete 1:5:10 using hard granite metal 4cm nominal sizeincluding fixing a pair of vitreous china 250mmx130mmx30mm foot rest, fixing 100mm dia hci \"P\" or \"S\" trap for water closet squatting pan including jointing the trap with pan in cement mortar (1:1), cutting the floor and mending good the damages etc. all complete as per P.H. specification and direction of Engineer-in-charge. 580mmx440mm size Orissa Pan(Hind ware/Parryware/ Cera Make) |
| 220 | Supplying all materials,labour,T&P and fitting and fixingvitrous Chaina washed down water Closet (European type water closet - EWC) with integral \"P\" or \"S\" type trap to the floor including wodden plug and chromoum plated screw including jointing the trap with soil pipe in CM(1:1) fixing plastic seat cover for washed down water closet with crmium plated brass hinges and rubber buffers including polishing etc all complete as per specification and direction of Engineer-in-charge.European Water Clost with S trapPlane (Hind ware/Parryware/ Cera Make) |
| 221 | Supplying all materials,labour T&P and fixing viterous squatting plate of following sizes with integral longitudinal flushing pipe including cutting the floor and mending good the danmages .ebedding the plate in 25mm cm(1:8) laid over 150mm cc(1:5:10)using 40mm hard granite metal,including 6mm thick white cement finishing at the top of the urinal fooot plate etc all complete as per specification and direction of the engineer un chargeSquatting urinal of 600mmx350mm(Hindware) |
| 222 | Supplying all materials ,labour ,T&P and fixing wash kitchen sinkwith outlet at end and weir overflow including fitting and fixing a pair of cast iron or MS brackets painted white, fixing 50mm/40mm dia CPbrass waste , fixing 50mm/40mm dia PVC waste pipe 910mm long with supply of wooden plugs, screws and cement etc. including cutting holes in walls and making good the damages etc.all complete as perspecification and direction of Engineer-in-charge600x450x250 mm stainless steel kitchen sink with drain board-glossy-IS:13983 - 1994 (Jayna make) |
| 223 | Supplying all materials ,labour ,T&P andfixing Wash basin with hole for pillar taps with cast iron or MS brackets painted white including cutting holes in walls and making good the damages with supply of wooden plugs, screws and cement etc. fixing pedestralfor wash basin recessed at the back for the reception of pipes and fittings, fixing PVC waste pipe of 32mm nominal diameter for wash basin including brass check nut complete, fixing pillar taps capstan head screw down high pressure lettered \"Hot\" and \"Cold\" with long screws, shanks and back nuts of 15mm dia nominal bore, fixing15mm dia PVC inlet connection pipe and making connection with pillar cocks and supply mains for wash basin , fixing 12mm dia CP brass waste etc.all complete as perspecification and direction of Engineer-in-charge.550mmx400mm size wash hand basin with Porcelain pedestal(Hind ware/Parryware/ Cera Make) |
| 224 | Counter top basin 560x455(Hind ware/Parryware/ Cera Make) |
| 225 | Supplying all materials ,labour ,T&P andfixing Mirror of superior glass mounted on 6mm thick A.C. sheet or ply wood sheet and fixed to wooden plugs with chromium plated brass screws and washers etc.all complete as perspecification and direction of Engineer-in-charge .Mirror(Bevellededge) 600mmx450mm |
| 226 | Big size Mirror |
| 227 | Supplying all materials,labour,T&P and fixing standard sized Glass-shelf with C.P brass bracket and guard rail complete fixed to wooden pluges with screw etc.all complete as per specification and direction of Engineer-in-charge.600mmx125mm size glass shelf with C.P guard rail |
| 228 | Supplying all materials ,labour ,T&P andfixing standard sizedCP brass towel rail completewith CPbrass brackets fixed to wooden plugs with chromium plated brass screws etc.all complete as perspecification and direction of Engineer-in-charge. 25mmx600mm long CP Towel rail |
| 229 | C P TowelRing |
| 230 | Supplying all materials ,labour ,T&P andfixing CP Soap Holder complete with CP brass bracketsfixed to wooden plugs with chromium plated brass screws etc.all complete as perspecification and direction of Engineer-in-charge. CP soap holder |
| 231 | Supplying all materials,labour ,T&P and filling in foundation and plinth with sand well watered and rammed including cost, conveyance of all materials to work site ,payment of royalty,taxes etc. all complete as per direction of the Engineer-in -charge |
| 232 | Supplying all materials, labour, T&P andproviding cement concrete ( 1:4:8 ) with 4cm size crusher broken hard granite metal including watering, curing, cost of all materials,conveyance of all materials to work site with payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge. |
| 233 | Supplying all materials, labour, T&P and providing cement concrete ( 1:2:4 ) with 12mm size crusher broken hard black granite chips including watering, curing,cost of all materials, conveyance of all materials to work site with payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge |
| 234 | In first floor |
| 235 | In 2ndfloor |
| 236 | Supplying all materials,labour,T&P and providing 12mm thick cement plaster(1:4) on brick work including watering,curing,cost of all materials, conveyance of all materials to worksite,paymentof royalty,all taxes etc.all complete as per PWD specification and direction of the Engineer-in-charge.In ground floor |
| 237 | In first floor |
| 238 | In 2ndfloor |
| 239 | Supplying all materials, labour, T&P and providing brick work withK.B.bricks having crushing strength not less than 75kg/cm² with dimensional tolerance± 8 percent in cement mortar (1:4) including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge InGround floor (Super structure ) |
| 240 | In first floor |
| 241 | In 2ndfloor |
| 242 | Supplying all materials, labour, T&P and providing 12mm thick cement plaster (1:4) on brickwork with cement punning and bitumen painting over top of wall including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in chargeIn first floor |
| 243 | In 2ndfloor |
| 244 | Supplying all materials labour T&P and filling in Sunken floors in toilets with sinter (light weight Slag)wellwatered and rammedincludingconveyance ofall materials to work site paymentofroyaltytaxes etcallcomplete asperdirection of Engineer in charge In ist floor |
| 245 | In 2ndfloor |
| 246 | Supplying the waterproofing material Pidifin 2K of Dr.fixit on equivalent water proofing material and appling in two coat over the concrete floor and dado upto 1\"-6\" in wall including cleaning,applying and mending as per specification including all labour charges as per direction of Engineer-in-charge. |
| 247 | In 2ndfloor |
| 248 | Supplying all materials, labour, T&P and providing ceramic tiles in floors, treads and landing on 25mm thick bed of cement mortar 1:1 (1 cement:1 sand) joined with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete as per direction of the Engineer in charge. size 30 x 30 cm Kajaria / Somany / Johnson to be pree approved .In ground floor |
| 249 | In Firstfloor |
| 250 | In 2nd Floor |
| 251 | Supplying all materials, labour, T&P and fixing porcelain glazed tiles in dados skirting on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shades of the tiles including rubbing and polishing complete as per direction of the Engineer in charge . 30cm x 45cm Kajaria / SomanyIn ground floor |
| 252 | In first floor |
| 253 | In 2ndfloor |
| 254 | Supplying all materials, labour,T&P and providing cement concrete(1:1.5:3) with 12mm size hard broken granite chips for R.C.C works including hoisting, laying, watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge In ground floor |
| 255 | In first floor |
| 256 | In 2ndfloor |
| 257 | Supplying all materials, labour, T&P and providing rigid and smooth centering and shuttering for R.C.C works including false work and dismantling them after casting including conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge R.C.C floor and roof slabs up to 4.30m height In ground floor |
| 258 | In first floor |
| 259 | In2nd floor |
| 260 | Supplying all materials, labour, T&P and providing M.S reinforcement for R.C.C work including cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge In ground floor |
| 261 | In first floor |
| 262 | In2ndfloor |
| 263 | Supplying all materials, labour, T&P and fixing granite tiles in dados skirting on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shades of the tiles including rubbing and polishing complete as per direction of the Engineer in charge In ground floor |
| 264 | In first floor |
| 265 | In 2nd floor |
| 266 | Supplying all materials, labour, T&P and providing fitting and fixing (Aqua guard) Pure Chill 120 PSS RO+UV of size 750x570x1350mm height with water storage capacity 80 liters along with 2 nos of faucets 1 for cold water and 1 for normal water including a flow of 1.5 ltr per minute etc all completeas per approved drawing,specification and direction of the Engineer in charge.Aquaguard 120 PSS RO+UV |
| 267 | Supplying and fitting-fixing of Un-plasticised Poly Vinyl Chloride (UPVC) (FENESTA / NCL VEKA LTD) Casement ToiletDoor – 60- Series duly manufactured using UPVC reinforced profiles of 60 mm x 55 mmx2.5 mm for outer frames, 102 mm x 60 mm x 2.25 mm for casement Door Sash Profile and 74 mm x 60 mm x 2.5mm mullion profile capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 2.0 mm prefabricated & welded through fusion welding.The Door sash shall be fitted with 12mm thick WPC Board of Greenply make duly fixed with EPDM weathering seal resistantaccessories like Bathroom locking system made of aluminium 1 No., per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges. The materials and product confirming to ASTM D 638-14, EN-477-95 and other applicable codes and standards. |
| 268 | Supplying all materials,labour,T&P and laying in trenches ( to level or slope ) unplasticized PVC pipe conforming to IS:4985/2000 of the following outside dia for class-3 (0.60mpa) including jointing with supply of approved solvent cement by non-heat application method/ as per manufactures\"s providing and laying in trench cement concrete(1:4:8) with 40 mm size hard granite metal in the Type-C-1 standard bedding surrounding or encasing including concrete for bedding and curing etc all complete as per PH specification and direction of the Engineer-in-charge.110mm dia U-PVC pipe ( Allround concrete ) |
| 269 | 160mm dia U-PVC pipe ( Allround contrete ) |
| 270 | Supplying all materials ,labour ,T&P and constructing gully trap chamber ofinside size 250mmx250mmwith 8cm thick RCC precast cover slab in cement concrete (1:2:4) mix using 12mm size crusher broken HG chips, foundation concrete (1:4:8) using 40mm size crusher broken HG metal on bed and around trap, KB brick work in cement mortar (1:6) in foundation and plinthand inside 12mm thick cement plastering (1:3) finished with a floating coat of neat cement including fixing 100mmx100mm size HCI gully trap, 150mmX150mm size CI gratingetc.all complete as per drawing,specification and direction of Engineer-in-charge.In side size 250mmx250mm |
| 271 | Supplying all materials ,labour ,T&P and constructing Inspection Chamber ofinside size 760mmx760mmx460mmwith cement concrete (1:3:6) using 40mm size crusher broken hard black granite metal on bed , KB brick work in cement mortar (1:6) in foundation and plinth, moulding and shaping the channel inside and benching with cement concrete (1:2:4) using 12mm size crusher broken hard black granite chips,12mm thick cement plaster (1:3)with cement punning to inside, cement flush pointing (1:3) to outside, R.C.C cover slab (1:2:4) using 12mm size crusher broken hard black granite chips with R.C.C man hole cover, earth work in excavation in all kinds of soil and refilling the cavity around the chamber including watering,curing,cost of all materials, conveyance of all materials to worksite, payment of royalty,all taxesetc.all complete as perapproved drawing, P.H specification and direction of Engineer-in-charge.Inside size : 760mmx760mmx460mm |
| 272 | R.C.P.C.Cover(18\" round man hole cover) |
| 273 | Supplying all materials ,labour ,T&P and constructing Man Hole Chamber ofinside size 910mmx910mmx910mmwith cement concrete (1:3:6) using 40mm size crusher broken hard black granite metal on bed , KB brick work in cement mortar (1:6) in foundation and plinth, moulding and shaping the channel inside and benching with cement concrete (1:2:4) using 12mm size crusher broken hard black granite chips,12mm thick cement plaster (1:3)with cement punning to inside, cement flush pointing (1:3) to outside, R.C.C cover slab (1:2:4) using 12mm size crusher broken black hard granite chips with R.C.C man hole cover, earth work in excavation in all kinds of soil and refilling the cavity around the chamber including watering,curing, conveyance of all materials to worksite, payment of royalty, taxesetc.all complete as perapproved drawing, P.H specification and direction of Engineer-in-charge Inside size : 910mmx910mmx910mm |
| 274 | R.C.P.C.Cover(18\" round man hole cover) |
| 275 | R.C.P.C.Cover(24\" round man hole cover for septic tank ) |
| 276 | Supplying all materials, labour, T&P & constructing Soak Way Pit of the following size with dry brick walling from bottom upto invert of inlet pipe andKB brick work in cement mortar (1:6) for the remaining height at top, cement concrete (1:4:8) using 40mm size crusher broken hard black granite metal on bed, 12mm thick cement plaster in cement mortar (1:4) inside and outside over masonry brick work, gravel backing in the rear of well steining, RCC cover slab in cement concrete (1:2:4) using 12mm size crusher broken hard black granite chips fitted with iron lifting handles including earth work in open well excavation in all kinds of soil and refilling of cavity around the pit and painting the iron works, watering, curing,cost of all materials,conveyance of all materials to worksite, payment of royalty, all taxes etc. all complete as per approved drawing,PH specification and direction of the Engineer-in- charge.1.40m dia x 2.00m deep inside size Soakway Pit |
| 277 | Construction 1 nos 100 users RCC Septic tank Earth work in excavation of foundation in all kinds of soil within 50m initial lead and 1.5m initial lift including rough dressing & breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of theEngineer-in-Charge. |
| 278 | - do - with addl. Depth of 1.5 m |
| 279 | Supplying all materials,labour ,T&P and filling in foundation and plinth with sand well watered and rammed including cost, conveyance of all materials to work site ,payment of royalty,taxes etc. all complete as per direction of the Engineer-in -charge |
| 280 | Supplying all materials, labour, T&P and providing shoring and shuttering for foundation trenches, pits etc with close wooden planks or sheets shuttering etc all complete as per specification and direction of the Engineer in charge |
| 281 | Supplying all materials, labour, T&P andproviding cement concrete ( 1:4:8 ) with 4cm size crusher broken hard granite metal including watering, curing, cost of all materials,conveyance of all materials to work site with payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge. |
| 282 | Supplying all materials, labour, T&P and providing cement concrete (1:1:5:3) with 12mm size hard broken granite chips for R.C.C works including hoisting, laying, watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge |
| 283 | Supplying all materials, labour, T&P and providing rigid and smooth centering and shuttering for R.C.C works including false work and dismantling them after casting including conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge For Roof slab |
| 284 | For RCC wall |
| 285 | Supplying all materials, labour, T&P and providing M.Sreinforcement for R.C.C work including cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge |
| 286 | Supplying all materials,labour,T&P and providing 6mm CP (1:4) with cement punning on brick work including watering,curing,cost of all materials, conveyance of all materials to worksite,paymentof royalty,all taxes etc.all complete as per PWD specification and direction of the Engineer-in-charge. |
| 287 | Supplying all materials, labour, T&P and providing,fitting and fixing 100mm x 100mm x 100mm SW Tee in wall including filling the recess with cement concrete (1:3:6) with 12mm size h.g chips all complete including watering, curing, conveyance of all materials to worksite, payment of royalty all complete as per specification anddirection of the Engineer in charge 110mm dia UPVC Tee |
| 288 | Supplying all materials, labour, T&P and making MS step iron in 20mm diameter MS steel bars and fixing into walls ofman hole/septic tank duly embedded in cement concrete (1:3:6) complete as per specification and direction of the Engineer in charge. |
| 289 | Supplying all materials, labour,T&P and providing Vent base in cement concrete(1:2:4) with 12mm size hard broken granite chips for R.C.C works including hoisting, laying, watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge |
| 290 | Supplying all materials, labour, T&P and fitting and fixing UPVC SWRsoil waste ventilating pipes and fittings to walls with nails, bobbins and wooden plugs or laying in trenches including earthwork in excavation in all kinds of soil and refilling of trenches as per specification and direction of the engineer in charge. 110mm diameter U-PVC SWR pipe |
| 291 | 110mm dia U-PVC Plain shoe bend |
| 292 | 110mm dia U-PVC Cowl |
| 293 | Filling in foundation and plinth with excavated materials, moorum including watering and ramming as directed by the Engineer in charge |
| 294 | Sinking of 150mmdia tubewell through hand boring (water jet ) method (2 nos).Supplying all materials, labour, T&P and setting up boring equipments including erection of suitable staging for installation of the required size of tube well, dismantling and removing the same after complection of the work, including transportation of the boring equipments, cleaning and levelling the site, excavation of mud pit, channels etc, levelling of site all complete as per direction of Engineer in charge |
| 295 | Supplying alllabour, T&P and transporting the boring pipes, top casing , grouting pipes, P.V.C pipes and fittings, P.V.C well screens, cement, bentonite and gravels etc to the worksite including loading and unloading etc all complete as per direction of Engineer in charge |
| 296 | Supplying alllabour, T&P and drilling pilot bore not less than 102mm dia, without casing pipes in all kinds of soils and rocks for the following depths excluding supply of necessary boring pipes including supply of necessary cutting equipments, extra sockets (whenever required) etc and withdrawing the boring pipes, washing and keeping the bore clear for logging if required all complete as per direction of Engineer in charge. Drilling pilot bore from 0 to 360 metres1 x 85.00m |
| 297 | Supplying alllabour, T&P and reaming the pilot bore to the following sizes and depths without casing pipes including withdrawing the boring pipes, washing the bore by means of pipe cylinder etc all complete as per direction of Engineer in charge Reaming 100mm to 150mm diafrom 0 to 360 metres |
| 298 | Reaming 150mm to 200mm dia from 0 to 360 metres |
| 299 | Supplying alllabour, T&P and jointing materials and lowering the 300mm dia top casing pipes into the position and removing the same after use all complete as per direction of Engineer in charge from 0 to 360 metres |
| 300 | Supplying all labour T&P and grouting with cementslurry for salinesealing intheborearoundthe 150 mm dia PVC casing pipe etc all complete as per the direction of the Engineer in charge. |
| 301 | Supplying alllabour, T&P and jointing materials and lowering the pvc casing pipes, fittings and well screens in position, including fitting and fixing of centraliser, cutter plug and washing the bore all complete as per direction of Engineer in charge 150mm dia PVC casing pipefrom 0 to 360 metres |
| 302 | Cost of 150mm dia PVC ASTM pipe (sch-80) |
| 303 | Cost of 150mm dia PVC pipe Cutting slot |
| 304 | Cost of 50 mm dia C.I. cutter plug |
| 305 | Cost of bentonite powder |
| 306 | Supplying all materials, labour, T&P and packing the bore with washed gravel of river shingles of required size and specification around the well screen and pipe etc all complete as per the direction of the Engineer in charge |
| 307 | Cost and Conveyance of Gravel |
| 308 | Supplying all materials, labour, T&P and packing the bore with river sand over the gravel pack etc all complete as per the direction of the Engineer in charge |
| 309 | Cost and Conveyance of sand |
| 310 | Supplying all labour T&P and grouting with cementslurry for sanitary sealingintheborearoundthe uppermost 3 metres of125/100mm dia PVC casing pipe etc all complete as per the direction of the Engineer in charge. |
| 311 | Cost of Cement |
| 312 | Cleaning and developing the tube well with supply of compressor worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment and labour as per direction of the Engineer in charge By Compressor |
| 313 | Supplying all materials, labour, T&P and constructingBore well protectionchamber of the inside size 650x650x1000hightwith cement concrete (1:3:6) using 40mm size hard granite metal on foundation, 1st class Fly ashbrickwork in cement mortar (1:3), with base cement concrete (1:2:4) using 12mm size h.g chips,12mmthick cement plaster (1:4)inside and outside, R.C.C cover slab in (1:1.5:3) using 12mm size h.g chips, earthwork in excavation in all kinds of soil and refilling the cavity around the chamber including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per approved specification and direction of the Engineer in charge. |
| 314 | Construction of 20000 Liters RCC Under ground Reserverof Inside size- 4.00 X 3.00 X2.00mEarth work in excavation of foundation in all kinds of soil within 50m initial lead and 1.5m initial lift including rough dressing & breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and as per direction of theEngineer-in-Charge. |
| 315 | Extra lifts of 1.50 mtr or part thereof over the initial lift of 1.5 mtr in all kinds of embankments and road works and ordinary earthwork in general. |
| 316 | Supplying all materials, labour, T&P and providing cement concrete (1:3:6) with 4cm size hard granite metal including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge In ground floor |
| 317 | Supplying all materials, labour, T&P and providing shoring and shuttering for foundation trenches, pits etc with close wooden planks or sheets shuttering etc all complete as per specification and direction of the Engineer in charge |
| 318 | Supplying all materials, labour, T&P and providing rigid and smooth centering and shuttering for R.C.C works including false work and dismantling them after casting including conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge R.C.C floor and roof slabs up to 4.30m height Roof Slab- |
| 319 | RCC beam,Column, girders and bressmer etc |
| 320 | Supplying all materials, labour, T&P and providing M.S reinforcement for R.C.C work including cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge In ground floor |
| 321 | Supplying all materials, labour,T&P and providing cement concrete(1:1 ½:3) with 12mm size hard broken granite chips for R.C.C works including hoisting, laying, watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge.In ground floor |
| 322 | Supplying all materials, labour, T&P and providing 12mm thick cement plaster (1:3) on brickwork including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in chargeIn ground floor (inside/outside) |
| 323 | Supplying all materials, labour, T&P and providing cement punning including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge In ground floor (inside/outside) |
| 324 | Supplying all materials, labour, T&P and making MS step iron in 20mm diameter MS steel bars and fixing into walls ofman hole/septic tank duly embedded in cement concrete (1:3:6) complete as per specification and direction of the Engineer in charge. |
| 325 | Filling in foundation and plinth with excavated materials, moorum including watering and ramming as directed by the Engineer in charge |
AI Tender Summary
Tender Timeline
Jul 10, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJul 24, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 25, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender