| 1 | Earth work in excavationover area ( exceeding 30 cm in depth. 1.5 Mtr in width as well as 10 sqm on plan) including disposal of excavated earth lead up to 50 m and lift up to 1.5 Mtr. Disposal earth to be leveled and neatly dressed.All kinds of soil |
| 2 | At Village Doulpura |
| 3 | At Village Kundwa |
| 4 | Earth work in excavationover area ( exceeding 30 cm in depth. 1.5 Mtr in width as well as 10 sqm on plan) including disposal of excavated earth lead up to 50 m and lift up to 1.5 Mtr. Disposal earth to be leveled and neatly dressed.All kinds of soil. Ordinary Rock |
| 5 | At Village Doulpura |
| 6 | At Village Kundwa |
| 7 | Earth work in excavationover area ( exceeding 30 cm in depth. 1.5 Mtr in width as well as 10 sqm on plan) including disposal of excavated earth lead up to 50 m and lift up to 1.5 Mtr. Disposal earth to be leveled and neatly dressed.All kinds of soil. Hard rock (requiring blasting) useful material 30% |
| 8 | At Village Doulpura |
| 9 | At Village Kundwa |
| 10 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr. : All kinds of soil |
| 11 | At Village Doulpura |
| 12 | At Village Kundwa |
| 13 | Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) |
| 14 | At Village Doulpura |
| 15 | At Village Kundwa |
| 16 | Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto 1.5 Mtr. Including taking out the excavated soil and depositing and refilling of jhiri with watering and ramming and disposal of surplus excavated soil as directed within a lead of 50 Mtr. All kinds of soil. |
| 17 | At Village Doulpura |
| 18 | At Village Kundwa |
| 19 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 20 | At Village Doulpura |
| 21 | At Village Kundwa |
| 22 | Random Rubble Stone masonry for foundation and plinth in cement sand mortar above 30 cm thick walls. Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 23 | At Village Doulpura |
| 24 | At Village Kundwa |
| 25 | Random Rubble stone masonry for superstructure aboveplinth level one storey height above 30cm. thick walls in :Cement Mortar 1:6 ( 1-Cement : 6-Sand). Add extra for Wall upto 30cm. and less thickness. |
| 26 | At Village Doulpura |
| 27 | At Village Kundwa |
| 28 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish :20mm thick. |
| 29 | At Village Doulpura |
| 30 | At Village Kundwa |
| 31 | Painting exterior surface ofWallwith 100% acrylic exterior paint of approved brand and manufacture to give an even shade with two or more coats including prepartion of base with sand papering, primer, putty,etc complete in all respect including scaffolding and safety provision New Work |
| 32 | At Village Doulpura |
| 33 | At Village Kundwa |
| 34 | Providing and laying cement concrete including curing, compaction etc. complete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, levelling course etc up to floor five level excluding the cost of centering and shuttering.M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stoneaggregate 20mm nominal size). |
| 35 | At Village Doulpura |
| 36 | At Village Kundwa |
| 37 | Providing and fixing steel gate grating and grills made of angles, tees, square bars orflats black pipe with holdfast and fittings complete as per deign and drawing including cutting welding and fabrication with priming coat of red oxide.square rectangular hollow tubular section are used. |
| 38 | At Village Doulpura |
| 39 | At Village Kundwa |
| 40 | Supplying and fixing of chain link fencing with angle iron posts 50x50x6mm placed at every 3 Mtr. apart 30cm in ground embedded in cement concrete 1:3:6 (30x30x45cm) corner and every tenth post to be strutted with (50 x 50 x 6cm) angle iron provided and fixed and fitted with posts including earth work in excavation etc. complete with chain link size.50mm x 50mm x 3.15mm |
| 41 | At Village Doulpura |
| 42 | At Village Kundwa |
| 43 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal ofexcavated earth, lead upto 50m andlift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil |
| 44 | At Village Doulpura |
| 45 | At Village Kundwa |
| 46 | By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator / by mechanical means at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) for grading-IIIMaterial |
| 47 | At Village Doulpura |
| 48 | At Village Kundwa |
| 49 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. |
| 50 | At Village Doulpura |
| 51 | At Village Kundwa |
| 52 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 53 | At Village Doulpura |
| 54 | At Village Kundwa |
| 55 | Providing and laying in position specified grade ofcement concrete forall RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix |
| 56 | At Village Doulpura |
| 57 | At Village Kundwa |
| 58 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings,strap beam, raft , bases of columns etc. |
| 59 | At Village Doulpura |
| 60 | At Village Kundwa |
| 61 | Providing and laying in position specified grade ofcement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcementfor Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.M20 grade Nominal Mix / Design Mix |
| 62 | At Village Doulpura |
| 63 | At Village Kundwa |
| 64 | Providing and laying in position specified grade ofcement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcementfor Beams, suspended floors, roofs, griders having slopes up to 15º, landings, balconies, shelves, chajjas, lintels, bands, plain windows sills, staircases and spiral staircases etc.M20 grade Nominal Mix / Design Mix |
| 65 | At Village Doulpura |
| 66 | At Village Kundwa |
| 67 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. (\"Original producers\" who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786)Cold twisted deformed bars (IS : 1786). |
| 68 | At Village Doulpura |
| 69 | At Village Kundwa |
| 70 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with wooden members and removal of formwork for upto floor three level for : Suspended floors, roofs landings staircases, balconies, girders, cantilevers, bands, coping bed plates,anchorblocks,sills,chhajjas,lintel,beam etc. |
| 71 | At Village Doulpura |
| 72 | At Village Kundwa |
| 73 | Columns, pillars, posts and struts etc. |
| 74 | At Village Doulpura |
| 75 | At Village Kundwa |
| 76 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) |
| 77 | At Village Doulpura |
| 78 | At Village Kundwa |
| 79 | Kota stone slab flooring 25 mm thick over 20 mm (average) thickbase laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing completewith base of cement mortar 1 : 4 (1 cement : 4 coarse sand)For area of each slab from 901 to 2000 Sq.Cm : |
| 80 | At Village Doulpura |
| 81 | At Village Kundwa |
| 82 | Random rubble dry stone Kharanja under floor. |
| 83 | At Village Doulpura |
| 84 | At Village Kundwa |
| 85 | Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/ vertical or curved surfaces)excluding the cost of purlins, rafters and trusses and including cutting to size and shape whenever required.1.00 mm thick with zinc coating not less than 275 gm/m2 |
| 86 | At Village Doulpura |
| 87 | At Village Kundwa |
| 88 | Structural steel work riveted,bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: |
| 89 | At Village Doulpura |
| 90 | At Village Kundwa |
| 91 | With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steel worksTrusses and Pillars |
| 92 | At Village Doulpura |
| 93 | At Village Kundwa |
| 94 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 95 | At Village Doulpura |
| 96 | At Village Kundwa |
| 97 | Direction and Place Identification signs with size more than 0.9 sqm size board. (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing) |
| 98 | At Village Doulpura |
| 99 | At Village Kundwa |