Military Engineer Services-MES has published Tender For Age I Cgn 45 23 24 Servicing Maintenance Of Summer Appliance At Diferent Sectors Under Age I Cg Noida. Submission Date for this Tender is 05-08-2023. AMC of Air Condition Tenders in noida Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 29-Jul-2023 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 05-08-2023 |
Sl. No. | Item Description |
1 | Material and labour for carrying out repairs/maintenance/servicing of water cooler storage type of 40/80,60/120 Litres capacity, flushing of storage tank and chemical cleaning, repair/replaement of unserviceable/.worn out spares and accessores cleaning of drain pipes, float valves, s/s tray, push tap, body frames and base plates fan motor all as specified and directed by Engineer-in-Charge. Note-Spares required for replacement will be measured and paid separately Under respective items |
2 | Supply and fix in replacementnew compressor rotary type suitable for 40/80ltrs water cooler ofall as directed. Make :As per OEM |
3 | Supply and fix in replacementnew copper condenser coil suitable for 40/80ltrs water cooler of .Make :As per OEM |
4 | Supply and fix in replacementnew running/starting capacitor suitable for 40/80ltrs water cooler all as dirceted .Make-Keltron/ Siemens/ Tibcon/ Sarda. |
5 | Supply and fix in replacementnewCP push type Water tap 15 mm size suitable forwater cooler storage type of 80/40,60/120Litres complete all as directed. |
6 | Supply and fix in replacementnew relay suitable for 40/80ltrs water cooler all as directed .Make :As per OEM |
7 | Material and labour for Leak test with CO2/Nitrogen gas for 24 hours and arrest leakage with brazing for 40/80,60/120 ltrs water cooler |
8 | Material for charging only refrigerant gas after pressure test for water cooler with existing type gas complete all as directed. |
9 | Material and labour for carrying out repair /maintenance/ servicing ofRefigarator of 165 Ltrs,180 ltrs 250 Ltrsand 310 Ltrs cap periodic cleaning,checking of electrical circuitand accessories to make the Refigarator in good working condition all as specified and directed by Engineer-in-Charge. Make:LG /Godrej Note- Gas charging ifrequiredwill be measured and paid separately Under respective items |
10 | Material and labour for Leak test with CO2/Nitrogen gas andfor 24 hours arrest leakage with brazing for Refigarator of 180-320 ltr cap complete all as directed. |
11 | Material for charging only refrigerant gas after pressure test Refigarator of 180-320 ltr cap with existing type gas complete all as directed. |
12 | Material and labour for carrying out repair /maintenance/ servicing of Deep freezer 320ltr cap Freezer periodic cleaning, cleaning of water tub and checking of electrical circuit repair/ replacement of unserviceable/worn out spares and accessories to make the Deep Freezer in good working condition all as specified and directed by Engineer-in-Charge. Note- Spares required for replacement will be measured and paid separately Under respective items |
13 | Supply and fix in replacementnew copper condenser coilfor Deep freezer 320ltr cap.Make :As per OEM |
14 | Supply and fix in replacementnew condenser fan motor for Deep freezer 320ltr cap.Make :As per OEM |
15 | Supply and fix in replacementnew thermostate for Deep freezer 320ltr cap.Make :As per OEM |
16 | Material and labour for Leak test with CO2/Nitrogen gas and arrest leakage with brazing forDeep freezer 320ltr cap |
17 | Material for labour for charging only refrigerant gas after pressure test ofDeep freezer 320ltrcap with existing type gas R-22,134a |
18 | Supply and Fix in replacement of metal clad industrial plug of 20 Amp, 50 Hz, 2 pole and earth 250 volt. Make-Havells,L&T,Legrand |
19 | Supply and Fix in replacement of industrial 3 core PVC round seathedflexible copper cable of size 1.5 sq mmincludind connected from plug connector of equipment complete all as specified. Make-Havells,Plaza,Finolex |
20 | Supply and Fix in replacement of industrial 3 core PVC round seathedflexible copper cable of size 2.5 sq mmincludind connected from plug connector of equipment complete all as specified. Make-Havells,Plaza,Finolex |
21 | Supply and fix in replacement PVC flexible hose of 20 mm dia with all accessorfes fixed on wall/ceiling/roof etc with suitable GI saddles and screws for connecting with split type Air Conditioner as drain pipe complete all as specified and directed. |
22 | Supply and fix in replacement Rigid PVC pipe of 20 mm dia with all accessorfes fixed on wall/ceiling/roof etc with suitable GI saddles and screws for connecting with split type Air Conditioner as drain pipe complete all as specified and directed.Make-AKG,Plaza,Prince |
23 | Taking out dismentling, cleaning and servicing ofevaporative desert cooler of capacity of 3000 / 4000 Cu. m. / Hr. and refixing the same on original position complete all as directed. |
24 | Supply and fix in replacementnew fan motor working on 230 Volts 50 Hz 1/7 H.P. and reconnecting the same with electrical connections for the evaporative desert cooler of capacity of 3000 / 4000 Cu. m. / Hr. complete all as directed. MAKE: COOL HOME/KHAITAN /CG |
25 | Supply and fix in replacement new water pump working on 230 Volts 50 Hz 1/66 H.P. and reconnecting the same with electrical/water connections for the evaporative desert cooler of capacity 3000/4000 cu.m/hr. complete all as directed . MAKE: KHAITAN/CG/COOL HOME |
26 | Supply and fix in replacementnew Evaporative Cellulose Cooling Padfor the evaporative desert cooler of capacity 3000/4000 cum/ Hr. |
27 | Supply and fix in replacementnew selector switch and reconnecting the same with electrical connections for the evaporative desert cooler of capacity 3000/4000 Cu.m/Hr. complete all as directed |
28 | Supply and fix in replacementnew grill to match with the replaced grill for the evaporative desert cooler of capacity 3000 / 4000 Cu.m/Hr. complete all as directed |
29 | Disconnecting of electric connectionof the split AC cap 2.00 TR from its stabilizer or its electric board and remove the front cover of indoor AC unit and clear it with pressure water and wire mesh/ brush/nylon brush without spoiling in side area of room, then refixing the front cover of indoor unit split type AC including cleaning of air filter.Remove the outer cover of out door unit and covered the condenser moto with ploythene/plastic cover so that water shall not be entered in the motor while cleaning the unit with pressure water and applyingcleaner solution and clean with wire mesh bursh/nylon brush to the condensing coil of out door unit including greasing of fan motor, checking of complete wiring of ACs and tightening all electrical connection with thimble and reconnecting the electrical connection with DBs, Stabilizer as per site condition, Notes- Spares required for replacement will be measured and paid separately |
30 | Supply and fix in replacementnew Running/ starting capacitors suitable for split ACcap 2.00 TR . Make :- Keltron/ Siemens/ Tibcon/ Sarda. |
31 | Supply and fix in replacementnew Thermostatic switch suitable for split ACcap 2.00 TR . Make:- utrtol/Siemens /Carrier/ Tibcon/ Sarda. |
32 | Supply and fix in replacementnewFan Motor for out door unit suitable for split ACcap 2.00 TR Make:- Ranutrtol/ Siemens/Carrier/Tibcon/Sarda |
33 | Supply and fix in replacementnew Electronic Display Boardsuitable for split AC cap 2.00 TR Make :As per OEM |
34 | Supply and fix in replacementnew Swing Motor suitable for split ACcap 2.00TR Make :As per OEM |
35 | Supply and fix in replacementnew evaporator coil copper for split AC cap2.0 TR Make :As per OEM |
36 | Supply and fix in replacementnew condencer coil copper for split AC cap2.0 TR Make :As per OEM |
37 | Supply and fix in replacementnew copper pipe with insulation of size 1/4" for split AC cap2.0 TR |
38 | Supply and fix in replacementnewcopper pipewithinsulation of size 3/8" for split ACcap 2.0 TR |
39 | Material and labour for Leak test with CO2/Nitrogen gas and arrest leakage with brazing on indoor/oudoorof copper pipe AC 2.0 TR /1.5 TR Split Air conditioner |
40 | Material and labourfor charging only refrigerant gas after pressure test to a compressor for split type AC 2.0 TR /1.5 TR Capacity with existing type gas R-22,134a |
41 | Supply and fix in replacementnewnylon air filter cleanable indigenous of suitable size for thesplit type AC 2.0 TR Capacity complete all as directed. |
42 | Supply and fix in replacementnew fan blades suitable for condencer motor for the split type air conditioners2TR capacity all as directed. MAKE :As per OEM |
43 | Supply and fix in replacementnew balance centrifugal blower with motor for the split air conditioners of the2 TR capacity complete all as directed.Make :As per OEM |
44 | Supply only in replacementnew cord lessremote suitable for split AC of capacity 2.0 TR /1.5 TR as directed by Engineer-in-charge Make :As per OEM |
45 | Supply and fix in replacementnewprinted circuit board (PCB)of 2 TR capacity and reconnecting the same with electrical connections for split type AC and complete all as directed.Make :As per OEM |
46 | Supply and fix in replacementnewprinted circuit board (PCB)for inverter AC 1.5 TR capacity and reconnecting the same with electrical connections for split type AC and complete all as directed.Make :As per OEM |
47 | Supply and fix in replacementnewprinted circuit board (PCB)for inverter AC2TR capacity and reconnecting the same with electrical connections for split type AC and complete all as directed.Make :As per OEM |
48 | Disconnecting the electrical connections and remove the split type A/C including copper pipe of capacity 1.5TR/2TRfrom the existing position and shifting the same to the near location, re-connecting the A/C after making the suitablehole with necessary connections including closing the hole at removed place with brick masonry matching with existing colour all as directed. |
49 | Disconnectingof electric connectionof the split type AC 1.5 TR from its stabilizer or its electric board and taking out from its position remove the front cover and outer cover, cleaning with pressure water and wire mesh/ brush/nylon brush andpressure waterwithout spoiling in side area of room including cleaning of air filter, refixing the outer cover and front cover, greasing all moving parts.Checking and reconnecting electrical connection of DBs, Stabilizer,including checking of wiring of ACs as per site condition and tightening all electrical connection with thimble. Note - Spares required for replacement will be measured and paid separately |
50 | Supply and fix in replacementnewRunning / Starting capacitors suitable forsplit type AC 1.5 ton. Make :- Keltron/ Siemens/ Tibcon/ Sarda. |
51 | Supply and fix in replacementnew Swing Motor suitable forsplit type AC 1.5 ton Make :As per OEM |
52 | Supply and fix in replacementnewcopper evaporator coilfor 1.5 ton split type AC.Make :As per OEM |
53 | Supply and fix in replacementnew copper condencer coil for 1.5 ton split type AC.Make :As per OEM |
54 | Supply and fix in replacementnew Electronic Display Boardsuitable forsplit type AC 1.5 ton.Make :As per OEM |
55 | Supply and fix in replacementCompressor for 1.5 TR Split AC of any make and model complete all as directed. |
56 | Supply and fix in replacementCompressor for 2 TR Split AC of any make and model complete all as directed. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail