Tender For Roc.No.3677/2022/E2 Agamt-Ii -2023-2024 P10 Constuction Of Anganwadi Building At Pattavarthi
Tender Value
14.30 Lakhs
Estimated cost
Bid Submission
21 Jul 2023
0 days left
EMD
15000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
harur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Roc.No.3677/2022/E2 Agamt-Ii -2023-2024 P10 Constuction Of Anganwadi Building At Pattavarthi Constuction Of Anganwadi Building At Pattavarthi
BOQ
| Sl. No. | Item Description |
| 1 | Constuction of Anganwadi Building at Pattavarthi |
| 2 | Earth Work excavation and deposting on bank intial lift of 2mm in all classus of soil as per SS20B |
| 3 | CC 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc., complete. |
| 4 | Brick Work in CM 1:5 mix using bricks ground moulded size of 22 x 11 x 7 cm for the following incl cutting etc., complete complying with standard specifications etc., complete. |
| 5 | Supply and Erecting sheet centering ncluding cost and conveyance of all materials to site and labour charges etc., complete. |
| 6 | for Column |
| 7 | for Lintel, Roof, Bottom, Sunshade |
| 8 | CC 1:1.5:3 mix using 20mm ISS HGB Metal for all RCC Items for exculding cost of reinforcement and fabrication charges, centering and shuttering but incl curring incl etc., complete. |
| 9 | Supply and fabricating and placing in position MS Steel or Ribbed Tor Steel for all reinforced cement concrete works as per the design given including cost and conveyance of all materials to site and labour charges etc., complete. |
| 10 | Finishing the exposed surface of RCC item of work such as slabs beams, sunshade, facia canopy slab, staircase waist slab etc., compelete in cm 1:3 10 mm thick etc. completed. |
| 11 | Plastering with CM 1:4 20mm thick over the cement concrete for floor finish incl curing etc. complete complying withs standard specification and as directed by dept., officer Rate for 10m2 |
| 12 | Plastering with CM 1:5 12mm thick all floors includingcuring etc. complete complying withs standard specification and as directed by dept., officer Rate for 10m2 |
| 13 | Wheathering course concrete using best quality broken jelly of size 20mm in pure slacked lime over the RCC roof slab in proportion of brick jelly top lime being 32 :12.5 by the volume and laid over a single layer and consolidated to the required. |
| 14 | Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3 12mm thick with water proofing compound confirming to IS by 2% by wieght of cement used and the joint pointed nealty to full depth. |
| 15 | Paving the floor with scratch proof desing ceramic tiles of any colour and any size laid in CM 1:3 20mm thick and pointing with white cement 0.4 kg per sqm mixed wiht colouring pigment to slut the colour of the tiles etc., complete. |
| 16 | Paving the floor with scratch proof desing ceramic tiles of any colour and any size laid in CM 1:3 20mm thick and pointing with white cement 0.4 kg per sqm mixed wiht colouring pigment to slut the colour of the tiles etc., complete. |
| 17 | Dadooing wall with colour galzed tiles of any colour and any size laid in CM 1:2 10mm thick and pointing withwhite cement 0.4 kg per sqm mixed wiht colouring pigment to slut the colour of the tiles etc., complete. |
| 18 | Providing the following thickness of Granolithic pattern floor finish with Plain cement concrete 1:2:4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete. |
| 19 | CC 1:2:4 mix using 20mm ISS Metalincluding cost and conveyance of all materials to site and labour charges etc., complete. |
| 20 | Distembering two coats using best approved Interiar Oil distember with one coat primer over new plastered surfaceincluding cost and conveyance of all materials to site and labour charges etc., complete. |
| 21 | Painting two coats approved plastic emulsion paint with one coat primer over new cement plastered sufaceincluding cost and conveyance of all materials to site and labour charges etc., complete. |
| 22 | Black Board paint two coats with approved cement paint over cement plastered surface including cost and conveyance of all materials to site and labour charges etc., complete. |
| 23 | Painting two coats over new Iron works using best quality of enamel paintincluding cost and conveyance of all materials to site and labour charges etc., complete. |
| 24 | Supply and Cost of Steel Door, window Ventilator |
| 25 | Door D |
| 26 | Door D1 |
| 27 | Door D2 |
| 28 | Windows |
| 29 | Ventilator |
| 30 | Jolly |
| 31 | Fixing charges for Steel Door, window Ventilator |
| 32 | Door D, D1, D2 |
| 33 | Windows, Ventilator, Jolly |
| 34 | Supply and fixing of cuddappa slab 40mm thick including cost and conveyance of all materials to site and labour charges etc., complete. |
| 35 | Provision for Electrification Arrangements |
| 36 | Light & Fan |
| 37 | Supply and Fixing of Tube Light |
| 38 | CFL |
| 39 | BHF wiht CFL |
| 40 | Supply and Fixing of Street Light |
| 41 | Supply and Fixing of Fan |
| 42 | Plug Point |
| 43 | Power Plug Point |
| 44 | S & Fixing DPMain switch |
| 45 | S & Fixing TNEB Meter Board |
| 46 | Service Pipe |
| 47 | Service Connection |
| 48 | Service Charge to EB |
| 49 | Supply and Fixing of Exhaust Fan SD 114 |
| 50 | Provision for Water Supply Arangement |
| 51 | 1000 Ltr Tank |
| 52 | 50mm PVC Pipe |
| 53 | 50mm PVC Bend |
| 54 | 25mm PVC Pipe |
| 55 | 25mm PVC Elbow |
| 56 | 25mm PVC Tee |
| 57 | Supplying and fixing PVC Rainwater down fall pipe of 100mm dia with necessary shoes, bends etc., complete. |
| 58 | Provision for RWH incl Pipe & Specials |
| 59 | Provision for Baby IWC, |
| 60 | Provision for EWC |
| 61 | Provision for Name Board |
| 62 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Jul 07, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJul 21, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 21, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender