destilation of Destilation of perumal koil kulam with bathing ghatand retainging wall in keezhaguthagai habitation
Date
24-07-2023
Name of Work :Rejunevation ofKeelakuthagaiPerumal koil kulam in katharipulam Panchayat
Sl. No.
Item Description
1
Rejunevation ofKeelakuthagaiPerumal koil kulam in katharipulam Panchayat
2
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
3
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
4
Filling with river sandincluding cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
5
CC 1:4 :8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
6
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
7
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc., complete.
8
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
9
Provision for errecting centering cherges etc
10
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} 18% for other than Earth Quantity
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.