Repairing, Maintenance Of Dvdf, Oven, Ht / Lt Binding Machine, Oil Filter / Centrifuging Machine Etc Installed At Repairing Workshop Gorakhpur, Maharajganj, Deoria, Kasia Kushinagar And Padrauna Under Ewd Gorakhpur
Tender Overview
Project Description
Repairing, Maintenance Of Dvdf, Oven, Ht / Lt Binding Machine, Oil Filter / Centrifuging Machine Etc Installed At Repairing Workshop Gorakhpur, Maharajganj, Deoria, Kasia Kushinagar And Padrauna Under Ewd Gorakhpur
BOQ
| Sl. No. | Item Description |
| 1 | Heating Chamber (Oven) |
| 2 | Porviding & Installation of 2 KV Heating Element (Oven) [ISI mark] |
| 3 | Porviding & Installation of Contactor 40 Amp.[ SEIMENS/SCHNEIDER Make] |
| 4 | Porviding & Installation of Contactor 63 Amp.[ SEIMENS/SCHNEIDER Make] |
| 5 | Porviding & Installation of Contactor 18 Amp.[ SEIMENS/SCHNEIDER Make] |
| 6 | Porviding & Installation of Belt V-type |
| 7 | Porviding & Installation of Single Phasing Preventer (415V AC) |
| 8 | Porviding & Installation of Kit-Kat 200 Amp. |
| 9 | Porviding & Installation of Theromostat |
| 10 | Oven Contactor Coil |
| 11 | Porviding & Installation of 40 Amp [ SEIMENS/SCHNEIDER Make] |
| 12 | Porviding & Installation of 63 Amp [ SEIMENS/SCHNEIDER Make] |
| 13 | Porviding & Installation of 18 Amp [ SEIMENS/SCHNEIDER Make] |
| 14 | Motor Rewinding/Repairing |
| 15 | Porviding & Installation of MCB 63 Amp [ISI mark] |
| 16 | Porviding & Installation of Glass Wire 2.5 MM |
| 17 | Labour Charges for misllaneous works |
| 18 | DVDF-SET |
| 19 | Porviding & Installation of Meter Requlator [ISI mark] |
| 20 | Porviding & Installation of Timer |
| 21 | Porviding & Installation of Frequency Meter [ISI mark] |
| 22 | Porviding & Installation of Volt Meter [ISI mark] |
| 23 | Porviding & Installation of Amp. Meter [ISI mark] |
| 24 | MotorRewinding |
| 25 | Armeture Rewinding |
| 26 | High Voltage-SET |
| 27 | Porviding & Installation of Voltage Regulator [ISI mark] |
| 28 | Porviding & Installation of Amp. Meter [ISI mark] |
| 29 | Porviding & Installation of Volt Meter [ISI mark] |
| 30 | Porviding & Installation of Bell |
| 31 | Porviding & Installation of Transformer 12.012 |
| 32 | Power Analyser-SET |
| 33 | Repairing of Transformer |
| 34 | Repairingof Varriac |
| 35 | Porviding & Installation of Contactor Back ML-4 |
| 36 | Porviding & Installation of Volt Meter [ISI mark] |
| 37 | Porviding & Installation of Ammeter [ISI mark] |
| 38 | HT WINDING MACHINE |
| 39 | Porviding & Installation of Turn Counter Meter |
| 40 | Porviding & Installation of Reverse/Forward Switch |
| 41 | Porviding & Installation of Belt (A-57, A-5x, A-40) |
| 42 | Porviding & Installation of Ball Bearing |
| 43 | Porviding & Installation of Coupling Rubber |
| 44 | Porviding Mobil oil |
| 45 | Motor Rewinding |
| 46 | LT WINDING MACHINE |
| 47 | Porviding & Installation of Turn Counter Meter |
| 48 | Porviding & Installation of Reverse/Forward Switch |
| 49 | Porviding & Installation of Foot Switch |
| 50 | Porviding & Installation of Ball Bearing |
| 51 | Porviding & Installation of Belt (A-57, A-5x, A-40) |
| 52 | Porviding & Installation of Contractor 63 Amp. |
| 53 | Porviding & Installation of Gear oil |
| 54 | Motor Rewinding |
| 55 | Repairing of Gear Box |
| 56 | Hydraulic Trolley. |
| 57 | Porviding & Installation of Hydraulic kit back & front. |
| 58 | Porviding & Installation ofBearing. |
| 59 | Porviding & Installation ofBig shaft. |
| 60 | Porviding & Installation ofSmall shaft. |
| 61 | Porviding & Installation ofDall pin. |
| 62 | Porviding & Installation ofHydraulic oil. |
| 63 | Porviding & Installation ofBig wheel. |
| 64 | Porviding & Installation ofSmall wheel. |
| 65 | Porviding & Installation ofHouging wheel shaft. |
| 66 | Porviding & Installation ofRepit. |
| 67 | Porviding & Installation ofClutch chain. |
| 68 | Porviding & Installation ofBig lock. |
| 69 | Porviding & Installation ofHandle lock. |
| 70 | Porviding & Installation ofWheel lock. |
| 71 | Chain Tickle & Weighing Machine. |
| 72 | Repairing of Chain Tickle including labour charge. |
| 73 | Repairing of weighing Machine labour charge. |
| 74 | Oil Filter/Centrifuging Machine |
| 75 | Porviding & Installation of Filter cartridge |
| 76 | Porviding & Installation ofHeater Elements 2.0 Kw rated |
| 77 | Porviding & Installation ofHeater Packing |
| 78 | Porviding & Installation ofPacking of inlet & outlet and vacuum pump |
| 79 | Porviding & Installation ofTemperature meter |
| 80 | Porviding & Installation ofVacuum meter |
| 81 | Porviding & Installation ofHose pipe coupling |
| 82 | Porviding & Installation ofHose pipe |
| 83 | Porviding & Installation ofRoller chain 3/8\" |
| 84 | Porviding & Installation of Safety Valve |
| 85 | Porviding & Installation ofFilter Tank Packing |
| 86 | Porviding & Installation ofOver load relay |
| 87 | Porviding & Installation ofH.R.C. FuseKit-Kat32 amp.415 V. L & T Make or equivalent |
| 88 | Porviding & Installation ofContractor M N X-9L & T Make or equivalent |
| 89 | Porviding & Installation ofContractor M N X-A1 L & T Make or equivalent |
| 90 | Porviding & Installation ofContractor M N X-A2 L & T Make or equivalent |
| 91 | Porviding & Installation ofPorcelain connecting Rod |
| 92 | Porviding & Installation ofMCB 63 Amp.phase with neutralL & T Make or equivalent |
| 93 | Porviding & Installation ofPush button switch |
| 94 | Porviding & Installation ofHeater casing |
| 95 | The scope includes repairing of vacuum pump including replacement of damaged spares parts etc. Andfilling of mobile oil in vacuum |
| 96 | The scope includes change of spare parts i.e,Paking bush packing seat with machining and grinding etc.and Rebinding of inlet pump motor. |
| 97 | The scope includes change of spare parts i.e,Paking bush packing seat with machining bush with machining,surfacing and grinding etc.and Rebinding of outlet pump motor. |
| 98 | Complete replacement of wiring (damaged),rebinding in panel,heaters and change HR fuse. |
| 99 | Complete painting of Existing Machine after removing of old dust.surface & making proper surface in one coat red oxide & two coat of best quality of synthetic enamel paints. |
| 100 | Serviceof above spare parts |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender