| 1 | Conducting Geological survey to fix borewell point |
| 2 | Drilling 150mm dia borewell in all kinds of soils except hard rock by first taking pilot bore and then enlarged to required dia meter to enable inserting inserting the PVC casing pipe by directed rotary mud and circulation method including all labour and water etc. |
| 3 | Supply of 150mm dia P.V.C.casing pipe etc., complete. |
| 4 | Labour charges for inserting 150mmO.D. PVC casing casing pipes assembly (with slot or without slots) in the drilled bore including jointing the pipesetc complete |
| 5 | Drilling of 150mm dia vertical bore in hard rock to the required depth including charges for labour,fuel,water required for drilling etc, complete |
| 6 | Developing the borewell with air compresser of 600 cfm capacity (minimum 8 hours) including transportation, labour and fuel charges for compresser as directed by corporation officers andonducting yield test by \"V\"notch method |
| 7 | Supply and delivery of three Phase wet type submersible pumpset with duly 50 lpm x 75m head fonform to IS 8034/88 with stainless stell shaft dynamically balanced SS impeller SS pump and motor casings and directly coupled to suitable..without panel board |
| 8 | Supply and delivery of wall mounting type control panel board made from Ms sheet 18 SWG vertin proof box type compriseof suitable Doi stater MCB for 3 phase pump set, ammeter over load relay under voltage protection power capacitor with ISI mark dry running preventor single pyhase preventor for 3 phase pumpset pilot lamps with switches internal wiring as per iE rules and suitable for operating the pumpset with duly 501 x 100m heads . |
| 9 | Supply and delivery of MS Kisok of size 0.75m x 0.45mx0.75m made up of MS angles of size 50mm x 50mm x 4mm alround covered with 16gauge MS sheet and kiosk door made up of MS plates of size 15mm x 3mm including cutting, welding, grinding locking arrangements, labour charges etc., complete |
| 10 | Supply and delivery ofUPVC pipe columnpipe cristal couplet pipe, screen pipe and .G.I.Pipes and PVC Pipe & Specials.32mm UPVC pipe |
| 11 | 110 mm PVC pipe |
| 12 | 32mm G.I Pipe |
| 13 | 32mm G.I Couping |
| 14 | 32mm Gm gate valve |
| 15 | 32mm GI bend |
| 16 | 32mm clamp set |
| 17 | 150mm borewell cover |
| 18 | 32mm Union |
| 19 | 32mm G.I H-nipple |
| 20 | 25mm G.I Tape |
| 21 | Shellac |
| 22 | Labour charges for erection of submersible pump set bore well in cluding fixing and jointing submersible cable with proper clamps pressuregauge up to the exrterior wallof pumproom kisok and erection of panel board consisting of TPCIN switches starter volt meter ammeter thre indicator tamp capaciator single phase preventor ater level guard laying and jointing if cables and earthing complete the pumpset on trial for 3 days. |
| 23 | Labour charges for erection of submersible pump set bore well in cluding fixing and jointing submersible cable with proper clamps pressuregauge up to the exrterior wallof pumproom kisok and erection of panel board consisting of TPCIN switches starter volt meter ammeter thre indicator tamp capaciator single phase preventor ater level guard laying and jointing if cables and earthing complete the pumpset on trial for 3 days. |
| 24 | Supply and delivery and fixing of HDPE tank as per IS 12701 / 1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges etc., (2000 Liter) |
| 25 | Charges for Putting borehole of size 23/30cm dia for file foundation in Sandy and Other loose soil by using hand Boxing set Rate Shall be include the cost of Labour for Boxing Fule Charges for Auger Bore and Other T & P Employed etc., complete |
| 26 | Earth work excavation in all kinds of soil except hard rock requiring blasting, inclusive of shoring, structing and blasting out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the departmental Officers, cleaning and leveling the site with initial lead of 10M and lift 2M etc., complete. |
| 27 | Plain Cement Concrete 1:4:8 (One cement four sand andeight aggregates) using 40mm gauge hard broken granite jelly for foundation including consolidation and dewatering for foundation whenever necessary etc. complete. |
| 28 | Supplying and filling in foundation andbasement with Stone Dust in layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification. |
| 29 | Brick work in CM 1:5 (one cement five sand) using 2nd class bricks in foundation and basement 1cum based on SI No.16 |
| 30 | Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides etc., complete. |
| 31 | Supplying and erecting shuttering with necessary supports for plain surface such as RCC boxing side slab, and similar,RCC Slab with all cross bracings etc., complete in all floors of any height (The retrieved materials should be taken back by the contractor).The payment for centering shall be given after the concrete is laid. (Vertical Portion Only) using steel plates10m2. |
| 32 | Supplying,erectingSTEELCENTERINGforsidesandsoffitsincsupportsandstruttingforplainsurfacesuchanreinforcedcementconcreteslasprectangualarbeamsteeorelbeamslintels,bedblocksstaircaseinallfloorsofanyheight(theretrivedmaterialsshouldbetakenbackbythecontractor)thepaymentforceneteringshallbegivenbytheconcreteislaid(bottom only) |
| 33 | Plain Cement Concrete 1:2:4 (one cement two sand and four aggregates) using 20mm gauge hard broken granite chips including watering and consoldation RCC etc., complete. |
| 34 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. |
| 35 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. |
| 36 | Paving the floor with Vitrified Marbonite tiles of approved quality and colour of size 600x600x8mm thick of approved make, quality and colour in all floors over a base layer of cement mortar 1:3(one cement three sand) 20mm thick and laid straight alignment and pointed neatly with colour cement at the rate of 0.40kg/m2 laid without any air gap in the tiles neatly and fixing in position as per standard specifications and as directed by the departmental officer. The colour & quality of tiles should be got approved by Municipal Engineer before use on work |
| 37 | Weathering Course with Concrete Broken Brick (S.I.No.278) & ( P & D) Data 54.Jelly 20mm gauge in pure slaked lime (no sand to be added) over roof slab,the proportion of brick jelly to lime being \"32 to 12.5 well beated with wooden beaters for giving required slope and thickness as directed by the departmental officers etc., complete.-10 cum |
| 38 | Finishing the top of roof with one course of machine pressed tiles of size 200 mm x 200 mm x 20 mm of approved quality in Cement Mortar 1:3 (One Cement add three sand) 12 mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete |
| 39 | Supplying and fixing in position Indian water closet of size 580 X 440mm, white glazed earthen ware of approved quality with \"P\" trap or \"S\" trap confirming to IS:2556 - Part XII with sand cushion and forming flooring alround the closet using 40mm broken brick jelly in lime concrete 1:2:5 ( one part of lime, two parts of sand and five parts of brick jelly) 100mm thick and finishing the top to required slope and including giving necessary connection to cast iron soil pipes/ PVC pipes by dismandling brick masonry, reinforced cement concrete roof/floor slab and making good the disturbed portion to original condition without leakage etc., complete complying with standard specifications and as directed by the departmental officers |
| 40 | R.C.C.Jolly by a new of following size in R.C.C. 1:1.5:3 using 20mm gauge hard broken granite stone jelly and river sand excluding cost of reinforcement but includingcharges,fabrication charges curing neat finishing and labour charges for fixing the jolly in position with standard spefication etc., complete. |
| 41 | Supply of 18W LED 3000K Square Type Recessed Fitting with LED Light of Higher End Philips / Havells / Equivalent etc.,complete. |
| 42 | Supply of 18W LED FittingsHigher End Philips / Havells / Equivalent etc.,complete. |
| 43 | Wiring with 2 x 1.5 sq.mm. (22 / 0.3 ) PVC insulated single core unsheathed copper conductor cable of 1100V grade in suitable heavy gauge MS conduit pipe on wall and ceiling with MS accessories with 150mm x 100mm x 75mm MS switch box for 5A 3 pin non interlocking flush type CS plug wfth painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for open plug point etc., complete. |
| 44 | Wiring with 2 x 1.5 sq.mm. (22 / 0.3 ) PVC insulated single core unsheathed copper conductor cable of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories and with TW switch box and 5A FT switch with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for open PVC light point / fan point (for electronic regulator) |
| 45 | ConstructionofinspectionchambersoffollowingsizeswithearthworkexcavationforfoundationwithDustFilling10mmthickandPlaincementconcretebedinC.M.1:5:10using40mmHBGjelly10mmthickforfoundation,23cmthickbrickwallworkinC.M.1:5forchambers,InnerandOuterPlasteringwithC.M.1:312mmthick,benching,channelling,75mmthickRCClooseslabcoveringinC.M.1:2:4mixusing20mmbluegranitejellyincludingnecessaryreinforcement,etc., complete Size for 60mm X 60mm X 60mm |
| 46 | Plastering with CM 1:5(One part of cement & five parts of sand) mix for 12mm thick including cost and conveyance of all materialsto work site and including all labour charges for mixing, laying, curing,finishing etc., complete as per standard specifications and as directed by departmental Engineers. |
| 47 | White washing one coats with freshly burnt shell lime white in colour in all floors including cost of lime and other materials brushes scaffolding charges etc.complete complying with standard specification and as directed by departmental Enginners. |
| 48 | Painting two coats with ready mixed Plastic EmulsionPaint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. - 10 sq.m |
| 49 | Supplying and laying Rubberised Interlocking Paver Block M40 grade Providing and laying of 80mm thick high strength type conforming IS 15658-2007 of rubberized interlocking Paver Block in size of minimum compressive strength of 40N mm2 in uniform shape of approved make to be laid in flurring bone pattern with quarry rubbish cushion below the uniform shape of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, quarry rubbish cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers, sweeping transporting loading unloading of laying paver block as per standard specification. |
| 50 | Dadooring the colour glazed wall tiles of size 10x150x6mm using pure cement 3mm thick and pointing with white cement using 0.40kg/m2. The rate including cost of tiles and colour cement and also including finishing thetop surface etc.complete. |
| 51 | Suplying fabricating erecting of ornamental grill work (for required Size 2.30 X 0.60 cm ) for compound top welded type using MS channel angle flat and squire bars etc., conforming to IS specification including primer coating and enamal painting as per design given by the departmental officers etc., complete as per STD Specification For Compound Wall Grill |
| 52 | Fabrication and supply and fixing of special type of ornamental Iron gate made out of using 40x12mm flat, 16mmSq.Rod and 75x40x6mm MS channel section for outer frame and shutter made out of variation type MS angle section with necessary stiffeners at intervals and necessary cross dioginal MS flats. The shutter frame shall be fully covered by 50 gauge CR angle and provided with required locking facilities and handle including cost of red oxide primer. (Working Data) |
| 53 | Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors. |
| 54 | Uprooting root vegetation and weeds by digging the area to a depth of 60CM removing all weeds and other growth with roots by forking repeatedly , breaking clods, rough dressing , flooding with water uprooting fresh growth after 10 to 15 days and then fine dressing for planting new grass ,including disposalof all rubbish with all leads and lifts. |
| 55 | Supplying, spreading and mixing red earth, sand and farm yard manure mixer with required base of chemical for control of pest and disease like Neem cake and carbo furedenand fertilizers for root regulator like DAP, Urea and superphosphate and for mind the mix cost of red earth sand, fertilizers and labour charges etc., complete directed by the Departmental Officers |
| 56 | Making the lawn korean grass truffing including forking the ground top dressing with sludge manure of fertilizers mixing with the same width forked soil, watering, weeding and maintenance for a period of 30 days or more from the actual date of completion of planting work till the grass forms a thick lawn free from weeds and fit for mowing including supplying good earth if need etc complete. |
| 57 | Supplying and plantingforms /shrubs directed by the Engineer in charge including digging holes in ordinary soils and refilling the same with manure, floating with water and dressing removal of rubbish , surplus earth if any with all lead and lift also maintenance of plant for a period of 30 days from the date of planting work. |
| 58 | Supplying and planting border / hedge plants directed by the Engineer in charge including digging holes in ordinary soils and refilling the same with manure, floating with water and dressing removal of rubbish , surplus earth if any with all lead and lift also maintenance of plant for a period of 30 days from the date of planting work. |
| 59 | Supplying and plantingfloweringdirected by the Engineer in charge including digging holes in ordinary soils and refilling the same with manure, floating with water and dressing removal of rubbish , surplus earth if any with all lead and lift also maintenance of plant for a period of 30 days from the date of planting work. |
| 60 | Supplying and planting Fycus as directed by the Engineer in charge including digging holes in ordinary soils and refilling the same with manure, floating with water and dressing removal of rubbish , surplus earth Jif any with all lead and lift also maintenance of plant for a period of 30 days from the date of planting work. |
| 61 | Supply And fixing of two seater swing using 3m long 65m dia M.S pipe of 3mm thick. The slide supports are 3m long 50mm dia M.S plate and grip the entire unit rigidly. Two swing clamp with \"U\" and \"S\" hooks are provided to the swing seat made out of 25mm x 25mm S.S square tube of 14 SWG with stainless steel plates of grade 304 and size of 500mm x250 mm of 16 SWGand hooks are fitted with 8mm thick tested chain 2 Nos of length 9.80m. The entire assemply is treated with zinc chromateone coat and enamel paint two coats of three different colours finshing with attractively including all materials and labour shargers etc., complete.its including foundation of the playing equipment |
| 62 | Supply and fixing of U-model twin sea saw four seater using 65mmdia M.S pipe of 3mm thick to a length of of 4.90m and supported assembly bars using 50mm dia M.S pipe of 3mm to a length of 2.10m each for 2 Nos. The four seater of circular type of 250mm dia S.S sheet of 16 SWG. The entire assembly is treated one coat and enamel painttwo coats of three different colours finishing with attractively including all materials and labour chargers etc., complete. its including foundation of the playing equipment |
| 63 | Supply and fixing of slide with ladder part model using 2 nos of 35mm dia MS pipe of 14 SWG for standing and sliding, Platform sheet of size of 0.45m x 0.90 made of S.S sheet of 16 SWG . sliding sheet of size 2.40m x 0.45m made of S.S sheet of 14 SWG , and side rails for child to hold while Climbing is made of 75mm x25mm thick 14 SWG to a length of 4.50m for both sides. The entire assembly is treated with zinc chromate one coat and enamel paint two coats of three different colours finishing with attractively including all materials and labour chargers etc., complete. its including foundation of the playing equipment |
| 64 | Supplying and fixing Ornamental Stone Seating benchs of size 2.50mm x 0.45mm with height of 0.50mm with necessary raw materials etc., The rate is inclusive of cost of materials, labour charges and transporting etc., complete. |
| 65 | Supply and erection of 24w LED Street lighting System 4Metre Pole height with ug cable and accessories inculding installlation Charges Etc. Complete.. |
| 66 | Dismantling the existing Damaged tar road surface clearing Away From Site Etc. complete.. |
| 67 | Supply and fixng of TNEB meter board suitable for 3 phase 200A service connection made up of suitable angle iron frame work of size 3 feet x 2 feet using angle iron of size 1-1/2\" x 1-1/2\" x 1/4\" rigidly fixed on wall covered with hylem sheet of size 3 feet x 2 feet of 12mm thickness with necessary bolts and nuts supports and supply and fixing of 3 Nos. 200A fuse units (500V), 1 No. neutral link, copper earth flat of size 1\" x 1/4\" with inter connection of EB meter to fuse units by 19/16 PVC insulated copper wire with earth connection complete SD 131 |
| 68 | Provision of EB Service Connection etc., complete. |
| 69 | Add GST 18% |