Total No Of Works 3 Nos Manandhal Panchayatin Melmalayanur Block. 1 Construction Of Girls Toilet @ Pum School In Manandhal Panchayat 2 Earth Work Excavation For Foundation In All Soils And Sub Soils To Full Depth Etc., Ordinary Soil Complete 3 Supplying And Filling In Foundation And Basement With Filling M-Sand Including Water Consolidating Etc., 4 Cement Concrete 1 : 4 : 8 Mix Using 40Mm Hbg Metal For Foundation Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick., Compacting Etc., Complete Complying With Standard Specifications And As Directed 5 Brick Work In Cm 1:5 Mix Using Country Bricks Ground Moulded Of Size 22 X 11 X 7Cm For The Following Including Curing Etc., Complete Complying With Standard Specifications. Rate For 10M3 6 Brick Work In Cm 1:5 Mix Using Country Bricks Ground Moulded Of Size 22 X 11 X 7Cm For The Following Including Curing Etc., Complete Complying With Standard Specifications. Rate For 10M3 7 Cement Concrete 1:1.5:3 Using 20Mm Iss Hbg Metal For All Rcc Item Of Works Excluding Cost Of Rein Forcement And Fabricating Charges, Centering And Shuttering But Including Curing And Providing Fixtures Like Fan Clamps In The Rcc Floor Or Roof Slabs 8 Supplying And Erecting Steel Centering For Plane Surfaces In Foundation And Basement For Staircase Steps Column Footings Plinth Beam Grade Beam Etc., 9 Supplying And Erecting Steel Centering For Plane Surfaces In Foundation And Basement For Staircase Steps Column Footings Plinth Beam Grade Beam Etc., 10 Supplying And Fabricating And Placing In Position Ms Steel Or Ribbed Tor Steel For All Reinforced Cement Concrete Works As Per The Design Given Including Cost Of Steel And Binding Wire In All Floors Etc, Complete Complying With Stanard Specification. ( Ms 11 Plastering With Cm 1:4, 20Mm Thick.Over The Cement Concrete For Floor Finish Including Curing Etc., Complete Complying With Standard Specifications And As Directed By The Departmental Officers. Rate For 10M2. 12 Plastering With Cm 1:3, 10Mm Thick.Over The Cement Concrete For Floor Finish Including Curing Etc., Complete Complying With Standard Specifications And As Directed By The Departmental Officers. Rate For 10M2. 13 Plastering With Cm 1:5, 12Mm Thick.In All Floors Including Curing Etc., Complete Complying With Standard Specifications And As Directed By The Departmental Officers. Rate For 10M2. 14 Paving The Floor With Scratch Proof Design Ceramic Tiles Of Any Colour And Any Size Laid In Cm 1:3, 20Mm Thick. And Pointing With White Cement 0.4 Kg Per Sqm Mixed With Colouring Pigment To Siut The Colour Of The Tiles Including Finishing The Joints Neatly Completed. 15 Dadooing Walls With Colour Glazed Tiles Of Any Colour And Any Size Laid In Cm 1:2, 10Mm Thick. And Pointing With White Cement 0.4 Kg Per Sqm Mixed With Colouring Pigment To Siut The Colour Of The Tiles Including Finishing The Joints Neatly Complying With The Standard Sepcification And As Directed By The Departmental Officers Size 150X150x6mm 16 Supply And Delivery Of Following Size Of Pvc Pipes And Specials As Per Is 4985 With Isi Mark And Manufacturar Brand 17 20Mm Pvc Tap 18 20Mm Pvc Bend 19 20Mm Pvc Pipes 10Ksc 20 500Lit Hdpe Tank 21 Distembering Two Coats With Best Approved Oil Bound Distember Including Cost Of Painting With Primer Coatover New Plastered Surface And Conveyance Of All Materils To Site And All Labour Charges Etc Complete 22 Painting Two Coats With Approved Exterior Emulsion Over The Plastered Surface Over One Coat Of Cement Paint Including Cost Of All Materials And Labour Charges Etc Complete 23 Painting New Iron Works Such As Steel Doors, Windows, Ventilators, Window Bars, Balustrades Etc., With Two Coats Of Best Approved First Quality And Colour Of Synthetic Enamel Paint Over The Existing Red Oxide Priming Coat In All Floors Including Cost Of Priming Coat Etc., Complete Complying With Standard Specification. ( The Make, Quality And Colour Of Paint Should Be Got Approved By The Executive Engineer Before Use On Works. ) 24 Supply Of Steel Doors Of Following Size Including All Cost At Site Etc., Complete 25 Supply And Fixing Of Doors Of Size 1.10X2.10 M 26 Supply And Fixing Of Doors Of Size0.75X1.80 M 27 Supplyof Rcc Jolly 28 Provision For Water Closet 29 Provision For Ewc 30 Provision Forname Boardcharges 31 Provision For Photographic Charges 32 Providingvertical Soak Pit With Drinage ( 114M ) @Seeyaoondi Palla Street Near In Manandhal Panchayat 33 Earth Work Excavation And Depositing On Bank With Initial Leadof 10M, Initial Lift Of 2M, In Depth Of Hard Soil 0-0.30M, In Sdr Soil 0.30M -1.00M, Including All Etc., Complete. 34 Providing And Laying Of225 Mm Stone Aggregate Inclusive Of All Labour And Material Charges Etc., 35 Providing And Laying Of40 Mm Stone Aggregate Inclusive Of All Labour And Material Charges Etc., 36 Providing And Laying Of 20Mm Stone Aggregate Inclusive Of All Labour And Material Charges Etc., 37 Cost And Supply Of Casing Pipe 38 Cement Concrete 1:4:8 Mix Using 40Mm Metal Include Cost And Conveyence Of All Charges 39 Precast Concrete Block Masonry ( Including Quoin Blocks, Jamb Blocks, Closers, Etc ) With Solid Cement Concrete Blocks Of Approved Size Size Made Of Cement Concrete1:3:6 Mix ( 1 Cement, 3 Coarse Sand, 6 Graded Stone Aggregate 20Mm And Down Gauge ) In Foundation And Plinth In Cement Lime Mortar 1:2:9 ( 1 Cement, 2 Lime Putty 9 Coarse Sand ) / 1:1:6 ( 1 Cement, 1 Lime Putty, 6 Coarse Sand ) / Cement 1:6 ( 1 Cement: 6 Coarse Sand ) Details Of Cost For 1.89Cum Of Precast Concrete Blocks Masonry. ) 100 Sqft X 2 / 3 = 66 2 / 3 Cft= 1.89Cum ) ( No. 7.75 ) 40 Plastering 1:5 Mix Using 12Mm Thick Include All Charges 41 Collection And Supply Of Centering Including Cost And Conveyance To The Site And All Labour Charges For Filling As Per Standard Specification. 42 Cement Concrete 1:3:6 Mix Using 40Mm Metal Include Cost And Conveyence Of All Charges 43 Supply And Delivery Of 900Mm Dia Rcc Pre Cast Rings Including Of All Labour And Material Charges Etc., 44 Supply And Delivery Of 900Mm Dia Rcc Cover Slab Including Of All Labour And Material Charges Etc., 45 Towards Labour Charges For Filling Metel Into The Pipe And Fixing Pvc Pipe 46 Provision Forname Boardcharges 47 Construction Of Threasing Floor ( 23M X 23M ) @ Mottur In Manandhal Panchayat 48 Earth Work Excavation For Foundation In All Classes Of Soils And Sub Soil To Full Depthexcept In Hard Rock Requiring Blasting But Inclusive Of Shoring Struttingif Required Forthe Sides Of Foundation. 49 Supplying And Filling In Foundation And Basement With Well Gravel In Layers Not More 15 Cm Thick Including Ramming, Watering And Compacting Etc.Complete Complying To Standard Specification 50 Cement Concrete 1:4:8 Mix Using 40 Mm Hbg Metal For Foundaion Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick. Compacting Etc., Complete Complying With Standard Specifications And As Directed. 51 Cement Concrete 1:3:6 Mix Using 40 Mm Hbg Metal For Foundaion Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick. Compacting Etc., Complete Complying With Standard Specifications And As Directed. 52 Supplying And Erecting Centring For Sides And Suffits Including Supports And Structing Upto 3.29M Height For Plane Surface In All Cross Bracting Using Ms Sheets Of Size 90 X 60Cm And 10Kg Stiffened With Angle Of Size 25 X 25 X 3Mm For Boarding Laid Over Silver Oak Joists Os Size 10 X 6.5Mm At About 90Cm C / C And Supported By Casuring Props Of 10Cm 13Cm Dia At C / C Etc., Complete 53 Cement Concrete 1:2:4 Mix Using 20 Mm Hbg Metal For Foundaion Including Watering Wherever Necessary And Laid In Layers Of Not More Than 15Cm Thick. Compacting Etc., Complete Complying With Standard Specifications And As Directed. 54 Provision For Name Board 55 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }