One Time Maintenance Work In Ukhimath-Mansoona-Jugashu-Raulank-Uniyana Motor Road Constructed Pmgsy Scheme District Rudraprayag.
Tender Value
4.76 Crore
Estimated cost
Bid Submission
08 Aug 2023
0 days left
EMD
9.53 Lakhs
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
ukhimath → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
One Time Maintenance Work In Ukhimath-Mansoona-Jugashu-Raulank-Uniyana Motor Road Constructed Pmgsy Scheme District Rudraprayag.
BOQ
| Sl. No. | Item Description |
| 1 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction |
| 2 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1 minterval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions, edge/selvedge wire diameter 3.9 mm and lacing wire diameter 2.2 mm. (The work includes filling boulders in the gabions). with Geotextile Filter |
| 3 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete+C6including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction |
| 4 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction |
| 5 | Hand packed stones filling in back of retaining walls by locally available approved stone including supply of all materials, labour, T&P etc. required for proper completion of the work. |
| 6 | WBM Grading 1Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per Technical Specification Clause 405. By Manual Means |
| 7 | WBM Grading 2Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. By Manual Means |
| 8 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Manual Means |
| 9 | Prime Coat Medium porosity Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical SpecificationClause 502 |
| 10 | Tack Coat 5-2-1 Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 11 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to5.6 mm aggregates eitherusing penetration grade bitumenor emulsionto required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.Bitumen (VG-10) |
| 12 | Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 Bitumen (VG-10) |
| 13 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) |
| 14 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 |
| 15 | Slip clearance (by manual means) of loose earth and other small loose materials including disposal complete as directed by the Engineer-in-charge |
| 16 | Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 191 |
| 17 | Surface Drains in Soil Construction of unlined surface drains of average cross-sectional area 0.18 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307 Mechanical Means |
| 18 | Cleaning of fully choked scupper and catchpit complete as directed by the Engineerin-charge. |
| 19 | For scupperwork Excavation in foundation for retaining & brest walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge |
| 20 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203..Nominal mix 1:3.6 (Nominal mix) hand mix |
| 21 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M25 using concrete mixer |
| 22 | Random Rubble Masonary laid dry in breast wall,retaining wall, parapets,scupper etc. Including supply of all materials,labour,t & p& royality etc,required for proper complition of work. |
| 23 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204.Random rubble masonry..In cement mortar (1:5) |
| 24 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. |
| 25 | Plain/reinforced cement concrete in superstructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204..R.C.C. grade M 25 |
| 26 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
| 27 | Hand packed stone filling in the back ofretaining walls by locally available approved stone including supply of all material ,labour T&P etc. |
| 28 | For Parapet work Excavation in foundation for retaining & brest walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge |
| 29 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete+C6including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction |
| 30 | Pucca DrainExcavation in foundation for retaining & brest walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge |
| 31 | Random Rubble Stone Masonry laid in 1:5 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction |
| 32 | Plastering with cement mortar (1:4), 15 mm thick on brick work in super structure as per technical specification clauses 613.4 &1204 |
| 33 | CausewayExcavation in foundation for retaining & brest walls in all types of soils and rocks including lead, lift and disposal of surplus material as per direction of engineer - in - charge |
| 34 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction |
| 35 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203P.C.C grade M 10 Nominal mix 1:3:6 |
| 36 | Plain/reinforced cement concrete in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204..P.C.C. grade M 30 using concrete mixer |
| 37 | Interlocking Tile work WBM Grading 2Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. By Manual Means |
| 38 | WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Manual Means |
| 39 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M25 Using concrete Mixer |
| 40 | Providing and Laying of Interlocking Concrete Block (M-35) Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. |
AI Tender Summary
Tender Timeline
Jul 05, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedAug 08, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedAug 08, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender