Sitc Of Approved Make Occupancy Sensor To The False Supply, Installation, Testing And Commissioning ( Sitc ) Of Approved Make Occupancy Sensor To The False Ceiling In The Cabin With Required Hardware. Rate Shall Include For Sitc Of Approved Make 3 Nos. 2.5 Sq Mm Copper Conductor Pvc Frlsh Insulated Wire 2 2 Primary Point Sitc Of Approved Make 3 Nos. 2.5 Sq Mm Copper Conductor Pvc Frlsh Insulated Wire 3 3 Secondary Point Supply, Installation, Testing And Commissioning ( Sitc ) Of Approved Make 3 Nos. 2.5 Sq Mm Copper Conductor Pvc Frlsh Insulated Wire 4 4 Lighting And Raw Power Mcbdb Supply, Installation, Testing And Commissioning Of Approved Make 3 Phase, 12- Way Per Phase Isolation Double Door Metallic Mcbdb With Per Phase Isolation Kit Using Required Hardwares In Concealed Manner By Making Opening In Wall And Refilling The Area Surrounding To It By Mortar 5 5 Sitc Of Approved Make 4C By 16 Sqmm Copper Conductor Supply, Installation, Testing And Commissioning Of Approved Make 4C X 16 Sq Mm Copper Conductor Xlpe Frls Insulated 1100-Volt Armoured Cable And 2 Runs Of 8 Swg Gi Earth Wire With Required Support From Ceiling 6 6 Termination Of Above Cable Using Required Size Brass Cable Gland Termination Of Above Cable Using Required Size Brass Cable Gland With Nickel Plated And Required Size & Type Copper Lugs Preferably Insulated. Rate Shall Include For Termination Of Both Gi Wire At Two Separate Points. 7 7 Supply And Installation Of Gi Perforated Cable Tray Supply And Installation Of Gi Perforated Cable Tray Of Minimum 18 Swg Thick, 100 Mm Width And 25 Mm Height; True Ceiling Support With Minimum 10 Mm Size Gi Rod, Nut, Washers, Anchor Fasteners And 18 Swg Gi ?C? Channel For Support To Cable Tray At Required Interval 8 8 Supply And Installation Of Gi Perforated Cable Tray Of Minimum 18 Swg Thick Supply And Installation Of Gi Perforated Cable Tray Of Minimum 18 Swg Thick, 150 Mm Width And 25 Mm Height; True Ceiling Support With Minimum 10 Mm Size Gi Rod, Nut, Washers, Anchor Fasteners And 18 Swg Gi C Channel For Support To Cable Tray At Required Interval As Per Site Condition. Rate Shall Include For Any Other Material Required For Completion Of This Work. 9 9 Supply And Installation Of Approved Make 2C X 1.5 Sq Mm Copper Conductor Supply And Installation Of Approved Make 2C X 1.5 Sq Mm Copper Conductor Pvc Insulated Fire Alarm Armoured Cable With Required Support From Ceiling. 10 10 Sitc Of Approved Make 6 Module Flush Mounted Aluminium Factory Finish Popup Box Supply, Installation, Testing And Commissioning Of Approved Make 6 Module Flush Mounted Aluminium Factory Finish Popup Box With Back Protecting Cover On Workstation / Side Table In The Cabin And Suitable Size Plastic White Plates With Frame, Minimum 6 Amp Sp One-Way Switch Qty 03 Nos, 16 Amp Led Indicator Sp One-Way Switch Qty 01 No., 6 Amp 3 Pin Socket Qty 01 No 11 11 Power Plug Point Supply, Installation, Testing And Commissioning Of Power Plug Point Using Approved Make And Model Suitable Size Plastic White Plates With Frame, 16 Amp Led Indicator Switch & 6 / 16 Amp Socket, Interconnecting Wires And Approved Make 3 Nos. 2.5 Sq Mm Copper Conductor Pvc Frlsh Insulated Wire 12 12 Group Of Two Light Plug Point Supply, Installation, Testing And Commissioning Of Group Of Two Light Plug Point Using Approved Make And Model Suitable Size Plastic White Plates With Frame, Minimum 6 Amp Switch Qty 02 Nos & 6 Amp Socket Qty 02 Nos, Interconnecting Wires And Approved Make 3 Nos. 2.5 Sq Mm Copper Conductor Pvc Frlsh Insulated Wire 13 13 Ups Supply Mcbdb Supply, Installation, Testing And Commissioning Of Approved Make 14- Way Spn Double Door Metallic Mcbdb Using Required Hardwares In Concealed Manner By Making Opening In Wall And Refilling The Area Surrounding To It By Mortar, With The Followings. Rate Shall Include For Removing Of Existing Mcbdb 14 14 Air-Conditioning Power Supply Mcbdb Supply, Installation, Testing And Commissioning Of Approved Make Three Phase, 6- Way Per Phase Isolation Double Door Metallic Mcbdb With Per Phase Isolation Kit Using Required Hardwares In Concealed Manner By Making Opening In Wall And Refilling The Area Surrounding To It By Mortar, With The Followings. Rate Shall Include For Removing Of Existing Mcbdb. Incomer: Fpmcb 63 Amp Qty 01 No. Outgoing: Dprccb Two Pole Two Module 40 Amp 100 Ma Qty 03 Nos. Spmcb ?C? Curve 20 Amp Qty 06 Nos. 15 15 Sitc Of Approved Make 4C X 4 Sq Mm Copper Conductor Xlpe Frls Insulated 1100-Volt Armoured Cable Supply, Installation, Testing And Commissioning Of Approved Make 4C X 4 Sq Mm Copper Conductor Xlpe Frls Insulated 1100-Volt Armoured Cable And 2 Runs Of 8 Swg Gi Earth Wire On Wall Using Heavy Duty Gi Saddles ( Minimum Three Nos. In A Length Of 1 Mtr ) Or Required Support From True Ceiling With Required Hardwares, 16 16 Sitc Of Approved Make 3C X 2.5 Sq Mm Copper Conductor Xlpe Frls Supply, Installation, Testing And Commissioning Of Approved Make 3C X 2.5 Sq Mm Copper Conductor Xlpe Frls Insulated 1100-Volt Armoured Cable And 12 Swg Gi Earth Wire On Wall Using Heavy Duty Gi Saddles 17 17 Termination Of Above Cable Using Required Size Brass Cable Termination Of Above Cable Using Required Size Brass Cable Gland With Nickel Plated And Required Size & Type Copper Lugs Preferably Insulated. 18 18 Plug Point For Ac Supply, Installation, Testing And Commissioning Of Approved Make Single Phase 20 Amp Metal Clad Dpmcb, Plug, Socket Box, In Flush / Surface Manner As Per Site Condition And 20 Amp Dpmcb, 20 Amp Metal Clad Top. 19 19 Ups Power Dpmcb In Ms Enclosure Supply, Installation, Testing And Commissioning Of Approved Make 16 Amp Dpmcb And Required Size Metal Enclosure In Flush / Surface Manner As Per Site Condition. 20 20 Telephone Point Sitcof Approved Make 2 Pair 0.5 Mm Dia Copper Conductor Pvc Insulated And Sheathed Urarmoured Telephone Cable From Mdf To Each Cabin And Work Station Partly In Existing Floor Trunking And Partly In Partitions Of Cabin / Work Station. Rate Shall Include For Sitc Of Approved Make Two Module Plastic White Plates With Frame And Two Nos Rj11 Shuttered Telephone Socket And Termination Of Cable At Both Ends 21 21 Network Point Supply, Installation, Testing And Commissioning Of Approved Make Utp Cat 6 Cable From Network Switch To Io Point Of Each Cabin And Work Station Partly In Existing Floor Trunking And Partly In Partitions Of Cabin / Work Station. Rate Shall Include For Termination Of Cable At Both Ends With Required Rj45 Terminals 22 22 Call Bell Point Supply, Installation, Testing And Commissioning Of Approved Make And Model Plastic White Plate And Bell Push And Indicator Type Resettable Call Bell In Flush Manner And 3 Nos 2.5 Sq Mm Wire In Pvc Conduit Partly In Partition Of Cabin And Above False Ceiling. 23 23 Telephone Mdf Supply, Installation, Testing And Commissioning Of 100 Pair Powder Coated Mdf With 10 Nos 10 Pair Krone Module, Stainless Steel Krone Module Stand In Flushed Manner With Required Mortar Etc 24 24 Carefully Removing Of All Mcbdbs Carefully Removing Of All Mcbdbs, Cables, Wires, Telephone Mdfs, If Any On The Floor As Directed By Bank?S Engineer And As Per Site Conditions.