| 1 | PART - A (Supply Part) |
| 2 | GI Flat/GI Pipe (25 x 5 mm) |
| 3 | MS Bolt nut with washer (5/8\"x4\") and as per site requirement |
| 4 | GI Stay set complete (3/4 InchX1.8 Meter) |
| 5 | Shackle insulator below 1000Vgrade |
| 6 | Stay Insulator 11kv Porcelain |
| 7 | GI earth wire 7/16 SWG |
| 8 | GI stay wire 7/12 SWG |
| 9 | PART B |
| 10 | Excavation of pole pit upto 1.5 mtr depth |
| 11 | Excavation of Stay pit upto 1.2 mtr depth |
| 12 | Pole grouting with mine boulder and cement |
| 13 | Earth pit as per IS 3047 including supply of materials with connection |
| 14 | PART C |
| 15 | Erection of L.T. Tubular pole 9 to 16 mtr long |
| 16 | Erection of stay set with stay insulator including tensioning |
| 17 | Fabrication of MS angle/flat in shape of bracket/clamps etc. |
| 18 | Erection of fabricated bracket on single pole with nut bolt & clamp & washer as per requirement |
| 19 | Erection of shackle insulator with hardware |
| 20 | Laying & stringing of lady bird all aluminum conductor |
| 21 | Erection of light fitting on pole |
| 22 | Dismantling of Tubular Pole 9 to 16 mtr long |
| 23 | Collection/dismantling of all aluminum conductor |
| 24 | Light fitting dismantling on poles |
| 25 | Laying and stringing of earth wire |
| 26 | Providing of paint & Painting of LT Pole 11mtr long with Aluminium paint double coat as per instructiion of Engineer I/C (Material will be supplied by contractor at his own cost) |
| 27 | Providing of paint & numbering ofpoleduring shifting,Erection/Dismantling etc or whenever required |
| 28 | Trimming of tree branches surrounding OHL (LS 10 kM= 50000 Sq mtr) |
| 29 | General Electrical maintenance of LT OH line / fault rectification in back shift mine by engaging 02 nos. skilled manpower and 02 nos. unskilled manpower daily |
| 30 | Total impact of GST for the purpose of CTC |