| 1 | Earth work excavation for foundation in ordinary soil with initial lead and lift etc., complete as per standard specification (Open excavation) |
| 2 | Providing Granular surface base to the required surface using murram, Granular soil of size varying from 4mm to 75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer (Each layer not exceeding 100mm) including hire charges of Roller etc, complete as per the direction of Departmental officers. |
| 3 | Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) soecification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete |
| 4 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete |
| 5 | Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete |
| 6 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete |
| 7 | Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.17cum of 9.502.36 mm and 0.26 cum of 2.36 and below with 45.27 kgs of VG 30/VG 40 bitumen & adding shredded plastic waste 5.03Kg over the aggregate heated to 170 degree celcius for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen n and aggregate t o required temperature and mixing the min required temperature in central hot mix plant 20 – 30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specifiedgrades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory /Pneumaticroller and all other too lsand plant required, including fuel and all other incidental charges etc., complete |
| 8 | Conveyance of earth with an extra lead of 2KM including loading and unloading at places shown by the departmental officers. |