| 1 | Cleaning of gate groove by removal of sand, mud, boulders, etc. of H/R, distributary and Escape gates as per specification & direction of E/I . |
| 2 | Extraction of gate from gate groove by dismantling old and worn out gate of H/R and distributary gate with embedded parts and bottom seal as per direction of E/I. |
| 3 | Dismantling of P.C.C./R.C.C. of H/R ,distributory and escape gateembeddedparts, bottom seal and hoist beam etc. as per direction of E/I . (SOR part –B, pageno-102, sl no-5.1.18) |
| 4 | Providing and laying of P.C.C./R.C.CM -20 with nominal mix (1:1.5:3) for H/R ,distributory and escape gate ,embedded parts, bottom seal, hoist bridge etc as per specification and direction of E/I. (SOR RCD,pageno-477, item no-12.08(C)case-ii) |
| 5 | Fabrication and Erection of new H/R gate of left canal in head works , embedded parts, hoisting arrangement, hoist bridge, rubber seal and all accessories etcwith all cost of materials all complete job as per specification and direction of E/I. |
| 6 | Fabrication and Erection of new H/R gate of right canal in head works , embedded parts, hoisting arrangement, hoist bridge, rubber seal and all accessories etcwith all cost of materials all complete job as per specification and direction of E/I. |
| 7 | Fabrication and Erection of new H/R gate of left canal chain no.58(Dhab distributor), embedded parts, hoisting arrangement, hoist bridge, rubber seal and all accessories etcwith all cost of materials all complete job as per specification and direction of E/I. |
| 8 | Fabrication and Erection of escape gate of right canal chain no.211 embedded parts, hoisting arrangement hoist bridge rubber seal and all accessories etcwith all cost of materials all complete job as per specification and direction of E/I. |
| 9 | Installation of all gate by use of 10 tonn capacity craneall complete job as per specification and direction of E/I. |
| 10 | Construction of coffer dam by sand filling in empty cement plastic bags for stopping water into up steam of left side and right side of the barrage and disposal of coffer dam after completion of work as per specification and direction of E/I. |
| 11 | Goods and Services Tax @18% |
| 12 | Labour cess@1% |