Tender For Kadavur Block - Agamt-Ii-2023-24-Construction Of Cc Road, School Toilet And Drainage 7 Nos Of Work In Keeapaguthi Panchayat
Tender Overview
Project Description
Tender For Kadavur Block - Agamt-Ii-2023-24-Construction Of Cc Road, School Toilet And Drainage 7 Nos Of Work In Keeapaguthi Panchayat
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 03-Jul-2023 | Date Ext_Kadavur Block - AGAMT-II-2023-24-Construction of CC Road, School Toilet and Drainage 7 Nos of work in Keeapaguthi Panchayat | Date | 07-Jul-2023 |
| 2 | 07-Jul-2023 | Date Extension - Kadavur Block - AGAMT-II-2023-24-Construction of CC Road, School Toilet and Drainage 7 Nos of work in Keeapaguthi Panchayat | Date | 11-Jul-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Name of the Work : Providing Cement Concrete Road atMylamaptti AD Colony Thulasi House to Kaliyappan House in Keeapaguthi Panchayat |
| 2 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc. |
| 4 | Supplying and erecting centeringincluding necessary supports for palne surface in foundation and basement and inall floors for RCC column footingvolumn plinth beam, beams roof slabs stair cases steps, bed blocks crtiical |
| 5 | Cement concrete 1:3:6 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete |
| 6 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc. |
| 7 | Name of the Work : Providing Cement Concrete Road atChinthamanipatti AD Colony Mahamunii House to Periyasamy House in Keeapaguthi Panchayat |
| 8 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification |
| 9 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc. |
| 10 | Supplying and erecting centeringincluding necessary supports for palne surface in foundation and basement and inall floors for RCC column footingvolumn plinth beam, beams roof slabs stair cases steps, bed blocks crtiical |
| 11 | Cement concrete 1:3:6 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete |
| 12 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc. |
| 13 | Name of the Work : Providing Cement Concrete Road atMylampatti OVK House to AS Mandi in Keeapaguthi Panchayat |
| 14 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification |
| 15 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc. |
| 16 | Supplying and erecting centeringincluding necessary supports for palne surface in foundation and basement and inall floors for RCC column footingvolumn plinth beam, beams roof slabs stair cases steps, bed blocks crtiical |
| 17 | Cement concrete 1:3:6 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete |
| 18 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc. |
| 19 | Name of the Work : Providing Cement Concrete Road at Chinthmanipatti Samathuva Mayanam in Keeapaguthi Panchayat |
| 20 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification |
| 21 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc. |
| 22 | Supplying and erecting centeringincluding necessary supports for palne surface in foundation and basement and inall floors for RCC column footingvolumn plinth beam, beams roof slabs stair cases steps, bed blocks crtiical |
| 23 | Cement concrete 1:3:6 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete |
| 24 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc. |
| 25 | Name of the Work : Construction of School Toilet (Girls) at Mylampatti PUM School in Keelapaguthi Panchayat |
| 26 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification |
| 27 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc. |
| 28 | Refilling the foundation and basement with excavated earth including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed. |
| 29 | Brickwork in CM 1:5 using country bricks ground moulded 23x11x7 cm for the following including aving etc., complete |
| 30 | Supplying and erecting for centering for sides soffits including Supports and Strutting upto 3.00m height for plane surfaces and all labour charges etc., (Column) |
| 31 | Supplying and erecting for centering for sides soffits including Supports and Strutting upto 3.00m height for plane surfaces and all labour charges etc., (Roof) |
| 32 | Supplying and fabrication of steel including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 33 | Reinforced Cement concrete 1:1.5:3, mix using 20 mm HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 34 | Plastering with C.M 1:5, mix 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 35 | Plastering with C.M 1:3, mix 10mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 36 | Plastering with C.M 1:4, mix 20mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 37 | White vwashing two coats using shell lime including cost and conveyance of all materilas to site and all labour charges etc |
| 38 | Distembering two coats with best approved distember including cost and conveyance of all materilas to site and all labour charges etc |
| 39 | Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete |
| 40 | Painting two coats of new iron works such as steel doors, window, Ventilators, Window bars, Balustrdes etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard specifications |
| 41 | Supplying and fixing in position best Indian make White glazed earthen ware Oriya type Indian Water Closet including cost and conveyance etc. |
| 42 | Supplying and fixing in position best Europeon Water Closet with all fittings and 10 lit capacity flushing tank including cost and conveyance etc. |
| 43 | Supplying and fixing white glazed earthen ware wash hand basin of size 550x400mm including cost and conveyance of all materials to site and all labour charges etc. |
| 44 | Supplying and fixing GI Sheet Roofing and Truss including cost and conveyance of all materials to site and all labour charges etc. |
| 45 | Supplying and fixing in position of G.I. Pipe Hand Rails 40mm including cost and conveyance of all materials to site and all labour charges etc. |
| 46 | Supplying and fixing in position PVC Ventilating shaft 110mm dia 3m length including cost and conveyance of all materials to site and all labour charges etc. |
| 47 | Paving the Floor with Antiskid tiles in CM 1:3 20mm thick including cost and conveyance etc complete., |
| 48 | Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly 20mm thick in all floors including curing etc., complete |
| 49 | Dadooing walls Plain Galzed tiles of size 150x150x6mm including cost and conveyance etc complete., |
| 50 | Supply of steel Doors (1.00x1.80) |
| 51 | Supply of steel Doors (0.75x1.80) |
| 52 | Supply of RCC jolly (0.90x1.60) |
| 53 | Name of the Work : Construction of Drainage at Sabibulla House to Eaasu House in Keelapaguthi Panchayat |
| 54 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification |
| 55 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc. |
| 56 | Cement concrete 1:3:6 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete |
| 57 | Supplying and erecting centeringincluding necessary supports for palne surface in foundation and basement and inall floors for RCC column footingvolumn plinth beam, beams roof slabs stair cases steps, bed blocks crtiical |
| 58 | Plastering with C.M 1:4, mix 20mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 59 | Name of the Work : Construction of Drainage at Mylampatti Pitchai House in Keelapaguthi Panchayat |
| 60 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification |
| 61 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour Charges etc. |
| 62 | Cement concrete 1:3:6 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete |
| 63 | Supplying and erecting centeringincluding necessary supports for palne surface in foundation and basement and inall floors for RCC column footingvolumn plinth beam, beams roof slabs stair cases steps, bed blocks crtiical |
| 64 | Plastering with C.M 1:4, mix 20mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 65 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks.GST Amount is the Total GST Amount for overall quoted amount above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender