| 1 | Safe carriage, loading and unloading of following material from ESC Daliganj, Lucknow to work site/J.E. dump store. |
| 2 | 11 K.V. S.T. Pole (SP-55) 11 Mtr. long. |
| 3 | 11 K.V. L.T. XLPE Cable 3.5X240 Sq.mm. |
| 4 | 11 K.V. H.T. XLPE Cable 3X120 Sq.mm. |
| 5 | 11 K.V. L.T. XLPE Cable 1X630 Sq.mm. |
| 6 | 11 K.V. L.T. XLPE Cable 1X400 Sq.mm. |
| 7 | 11 K.V. Out door Jointing kit 3X120 Sq.mm. |
| 8 | 11 K.V. Straight Through Jointing kit 3X120 Sq.mm. |
| 9 | ABC (3X120 + 1X95 + 1X16 Sq.mm.) |
| 10 | 11 K.V. GI Pin with Nut. |
| 11 | 11 K.V. Pin Insulator. |
| 12 | 11 K.V. DO Fuse Set. |
| 13 | Earth Rod 2500X20 mm. |
| 14 | Tee-off Channels |
| 15 | M.S. Channel 100X50X5 mm. |
| 16 | Erection of Single Pole structure on 11 mtr. STP with fixing of necessary clamps and other accessories required for stringing along with plinthing & grouting of STP with cement, sand and brick ballast in the ratio 1:4:8 (0.9 Cu.Mtr each)upto the height of 300 mm. from the ground level. |
| 17 | Construction of masonary plinth suitable for 250 & 630 K.V.A. Transformer of size 2X2X1.2 Mtrs with complete civil material & 02 Nos.,100X50 mm, M.S Channel 2.0 Mtr. long and M.S Bar 8/10 SWG complete in all respect as per RESPO norms. |
| 18 | Disconnection of existing 250 KVA Transformer from system shifted upto safe place to the nearest 33/11 K.V. Sub-Station of Division or required place. |
| 19 | Disconnection of existing 630 KVA Transformer from system shifted upto safe place to the nearest 33/11 K.V. Sub-Station of Division or required place. |
| 20 | Placing of 250 K.V.A. healthy Transformer from out side of yard to plinth with the help of crain and T & P. |
| 21 | Placing of 630 K.V.A. healthy Transformer from out side of yard to plinth with the help of crain and T & P. |
| 22 | Lay down the LT PVC cable of size 1X400 Sq.mm. for making the both side, connection of Transformer after fixing the necessary clamps Lugs and other material required for completion of work including carriage from store center. |
| 23 | Lay down the LT PVC cable of size 1X630 Sq.mm. for making the both side, connection of Transformer after fixing the necessary clamps Lugs and other material required for completion of work including carriage from store center. |
| 24 | Lay down the H.T. XLPE Cable 3X120 mm2 for making the both side, connection of Transformer after fixing the necessary clamps Lugs and other material required for completion of work including carriage from store center. |
| 25 | Laying of 11 K.V. XLPE Cable 3.5X240 mm2 in underground as per digging of earth pit of Size 0.60x0.90 with provision of Sand filling and Cover with side brick and Top with Stone pad. (11 K.V. XLPE Cable will be provided by deptt. only) |
| 26 | Earthing of 11/0.4 K.V Distribution Transformer body/neutral by way of boring and lowering of ISI marked two Nos. G.I pipe 1.5\" dia 20 m deep from the ground level with solid cone at the lower end of G.I pipe. One end of G.I strip of size 50X6 mm. will be connected with neutral and body of the Transformer & other end will be clamped & welded with G.I Pipe as per UPPCL norms (All the material will be arranged by contractor at their own cost.) |
| 27 | Fabrication and erection of wire mesh fencing 02 Mtr. height with a gate and with retaining wall including grouting of fabricated M.S. Angle 65X65X6 mm. support (05 Nos. in a Sub-Station). Painting of fencing/support with all material as per specification/drawing complete in all respect. |
| 28 | Construction of masonry type D.P. Box with 02 Nos. 500/300 Amp. tabular fuse unit and M.S. Angle Iron support of size 50X50X6 mm. All the civil and other material required shall be arranged and provided by contractor for completion of job as per RESPO norms along with necessary laying of cable and its cartage & necessary connections. |
| 29 | AB Conductor Stringing & sagging of 3 phase with necessary clamps, Eye hook, Suspension clamp, A-B type connector etc. on ABC New line as per RESPO specification and direction on E/I. ABC shall be supplied by department. |
| 30 | Note :-1- All the material provided by contractor shall be as per norms of UPPCL/RESPO.2- One carriage including loading/unloading from dump site to pit site is included in scope of work.3- During execution of work all risk will be of the contractor.4- Contractor will provide all T & P, vehicle and man power.5- All the old and used material should be taken on book.6- The quantity may be vary ±10%.7- GST will be paid extra as legally applicable. |