| 1 | Taking out doors, windows and clearstory windows shutters (steel or wood) including stacking within 50 meters lead:Of area 3 square meter and below. |
| 2 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. |
| 3 | Repairofdoor,windowshuttersincludingcostofmaterialandlabourforchangeofdamaged :Wire Gauge 14 mesh x 24 gauge |
| 4 | ProvidingandfixingNigeria/Ghana /Ivory Coast Teakwood grade-I mouldings and beadings in doors and windows size :-50x20 mm |
| 5 | Structural steel work riveted,bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: |
| 6 | Providing and fixing welded mesh/expanded metal mesh in frame work, flat iron beading 20x3mm including top cross laps inside and out sides welding, iron bolts, crews, clips etc. complete (excluding frame work) of size.Welded mesh 25 mmx 25 mm x 2.1 mm |
| 7 | Applying priming coat :With ready mix pink or gray primer of approved brand and manufacture on wood work hard and soft wood. |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture togive an even shade : Two or more coats on new work |
| 9 | Providing and fixing double scaffolding system on the exterior side, upto five story made with 4\" wooden member 1.5 m c/c horizontal and vertical direction joining with rassi, clamps, challies. The scaffolding system shall be stiffened with bracing, runner, connection of building if necessary with all essential safty features for the workmen etc complete as per direction of EI.The lavation area of the scaffolding shall be measured for payment. The payment will be made once irrespective of duration of scaffolding.Note : This item to be used for maintence work judicially |
| 10 | Fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:4 ( 1cement : 4 coarse sand) with joints finished flush. Red Sand stone size not less than 1350 Cm2, 75mm |
| 11 | Labour charges for repair to door / window without using any material such as applying randha (finishing) tightening of bolts & screw etc. |
| 12 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50metres lead. |
| 13 | Repairofdoor,windowshuttersincludingcostofmaterialandlabourforchangeofdamaged :Style / rail of teak wood 30mm thick/ Aluminium Section4\"wide |