Tender For Aravakurichi Block - Agamt-Ii-2023-24-Construction Of Cc Road, Comound Wall, Osr Land And Threshing Floor 8 Nos Work In Alamarathupatty Panchayat
Tender Overview
Project Description
Tender For Aravakurichi Block - Agamt-Ii-2023-24-Construction Of Cc Road, Comound Wall, Osr Land And Threshing Floor 8 Nos Work In Alamarathupatty Panchayat
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 06-Jul-2023 | Date Extension - Aravakurichi Block - AGAMT-II-2023-24-Construction of CC Road, Comound wall, OSR Land and Threshing floor 8 Nos work in Alamarathupatty Panchayat | Date | 13-Jul-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Name of the Work : Provding CC road from Anguthai House to BT road and Branching upto Krishnammal House (110m) in Alamarathupatty Panchayat |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 4 | Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 5 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 6 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 7 | Name of the Work : Provding CC road from CC road to Maruthamuthu house (35m) at Jangalpatty in Alamarathupatty Panchayat |
| 8 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 9 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 10 | Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 11 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 12 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 13 | Towards the cost for Supply of Rcc pipe including all charges etc complete |
| 14 | Name of the Work : Provding CC road from CC road to Balakrishnan house (83m) at Jangalpatty in Alamarathupatty Panchayat |
| 15 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 16 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 17 | Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 18 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 19 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 20 | Towards the cost for Supply of Rcc pipe including all charges etc complete |
| 21 | Name of the Work : Provding CC road from Tamilarasi House to Sekar house (120m) at Jangalpatty in Alamarathupatty Panchayat |
| 22 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 23 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 24 | Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 25 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 26 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 27 | Towards the cost for Supply of Rcc pipe including all charges etc complete |
| 28 | Name of the Work : Provding CC road from NH 7 to Nellikombai road & Branching road manivel house to Kannammal house (260m) at Andipattikottai in Alamarathupatty Panchayat |
| 29 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 30 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 31 | Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 32 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 33 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
| 34 | Name of the Work : Construction of Cremation shed and compound wall in Samathuva sudugadu @ Vandarichinampatti H/O Z. Alamarathupatty Panchayat |
| 35 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 36 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 37 | Brickwork in CM 1:5 using country bricks ground moulded 23x11x7 cm for the following including aving etc., complete |
| 38 | Supplying and erecting for centering for sides soffits including Supports and Strutting upto 3.00m height for plane surfaces and all labour charges etc., |
| 39 | Supplying and fabrication of steel including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 40 | Reinforced Cement concrete 1:1.5:3, mix using 20 mm HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 41 | Finishing with exposed surface in cement mortar 1:3, mix 10mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 42 | Plastering with C.M 1:5, mix 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 43 | Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete |
| 44 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 45 | Sub Estimate |
| 46 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 47 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 48 | Brickwork in CM 1:5 using country bricks ground moulded 23x11x7 cm for the following including aving etc., complete |
| 49 | Supplying and erecting for centering for sides soffits including Supports and Strutting upto 3.00m height for plane surfaces and all labour charges etc., |
| 50 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 51 | Plastering with C.M 1:5, mix 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 52 | Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete |
| 53 | Sub Estimate |
| 54 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 55 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 56 | Supplying and erecting for centering for sides soffits including Supports and Strutting upto 3.00m height for plane surfaces and all labour charges etc., |
| 57 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 58 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 59 | Name of the Work : Improvement to the Panchayat OSR Land Fencing for Miyavakki methed @ Gandhi nagar H/O Z.alamarathuaptti |
| 60 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 61 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 62 | Supplying and erecting for centering for sides soffits including Supports and Strutting upto 3.00m height for plane surfaces and all labour charges etc., |
| 63 | Cement concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 64 | Providing and laying interlocking paver block of 60mm thick including all other labour charges etc |
| 65 | Sub Estimate |
| 66 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 67 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 68 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 69 | Supply and Fixing of 1 1/2\" x 1 1/2\" for providing fencing alround park including all other labour charges etc |
| 70 | Providing fencing with chain link diamond mesh 3 1/2\"x3 1/2\" size made of 12Gauge GI wire, including the cost of G.I binding wire and top of the mesh linked with 10 swg GI wire etc., complete |
| 71 | Painting two coats using Enamel paint over new iron works inclusive of all labour charges etc |
| 72 | Name of the Work : Construction of Threshing Floor at Andipatti in Alamarathupatty Panchayat (15m x 15m) |
| 73 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stuff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 74 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 75 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 76 | Refilling the foundation and basement with excavated earth including watering wherever necessary and laid in layers of not more than 15cm thick, compacting etc., complete complying with standard specifications and as directed. |
| 77 | Supplying ertecting and shuttering including necessary supports for plan surface in foundation and basement and in all floors for slabs and beams complying with standard specifications (Outer wall & Wearing Coat) |
| 78 | Supplying ertecting and shuttering including necessary supports for plan surface in foundation and basement and in all floors for slabs and beams complying with standard specifications (Footing sides) |
| 79 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc.. |
| 80 | Plastering with C.M 1:5, mix 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 81 | Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete |
| 82 | GST Amount for providing Service to Government Contract Works for the above ConstructionWorks.GST Amount is the Total GST Amount for overall quoted amount above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.