}

Tender For Repair/Maint Of Centrifugal / Submersible Pump Sets, Motors Starters And Cleaning Of Ug Sumps, Storage Sumps, Filters Of Water Supply Installations And Water Testing At Upper Leimakhong, Lower Leimakhong, Central Sector And Koirengi, Kangpokpi-Manipur

Military Engineer Services-MES has published Tender For Repair/Maint Of Centrifugal / Submersible Pump Sets, Motors Starters And Cleaning Of Ug Sumps, Storage Sumps, Filters Of Water Supply Installations And Water Testing At Upper Leimakhong, Lower Leimakhong, Central Sector And Koirengi. Submission Date for this Tender is 28-07-2023. Submersible Pump Tenders in Kangpokpi Manipur. Bidders can get complete Tender details and download the document.




Tender Notice

38409664
Corrigendum : Tender For Repair/Maint Of Centrifugal / Submersible Pump Sets, Motors Starters And Cleaning Of Ug Sumps, Storage Sumps, Filters Of Water Supply Installations And Water Testing At Upper Leimakhong, Lower Leimakhong, Central Sector And Koirengi
Open Tender
Indian
Manipur
Kangpokpi
28-07-2023

Tender Details

Repair / Maint Of Centrifugal / Submersible Pump Sets, Motors Starters And Cleaning Of Ug Sumps, Storage Sumps, Filters Of Water Supply Installations And Water Testing At Upper Leimakhong, Lower Leimakhong, Central Sector And Koirengi

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 21-Jul-2023 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 28-07-2023

Key Value

Document Fees
INR 500 /-
EMD
INR 50000.0 /-
Tender Value
INR 25 Lakhs /-

BOQ Items

Name of Work: REPAIR/MAINT OF CENTRIFUGAL / SUBMERSIBLE PUMP SETS, MOTORS STARTERS AND CLEANING OF UG SUMPS, STORAGE SUMPS, FILTERS OF WATER SUPPLY INSTALLATIONS AND WATER TESTING AT UPPER LEIMAKHONG, LOWER LEIMAKHONG, CENTRAL SECTOR AND KOIRENGI
Sl. No. Item Description
1Schedule "A"
2M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump includingfloor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the followingNote :- (i) The unit rate quoted shall bedeemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed toinclude all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work insideeach UG sump to prevent interruption of water supply to the users. (v)The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge (a) Semi under ground sump of capacity 75000 Gallon at 02 Nos of High Lift Pump House,01 Nos ofklp pump house
3M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump includingfloor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the followingNote :- (i) The unit rate quoted shall bedeemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed toinclude all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work insideeach UG sump to prevent interruption of water supply to the users. (v)The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge (b) Semi under ground sump of capacity 50000 Gallon at 04 nos of High Lift Pump House, 03 Nos of NearCapt qtr , 01 Nos of Low lift pump house, 01 nos of klp pump house , 01 nos of New 183 MH
4M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump includingfloor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the followingNote :- (i) The unit rate quoted shall bedeemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed toinclude all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work insideeach UG sump to prevent interruption of water supply to the users. (v)The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge (c)Semi under ground sump of capacity 25000 Gallon at High Lift pump house-01, KLP pump house-01
5M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump includingfloor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the followingNote :- (i) The unit rate quoted shall bedeemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed toinclude all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work insideeach UG sump to prevent interruption of water supply to the users. (v)The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge (d)Semi under ground sump of capacity 6400 Gallon at High Lift Pump house.
6M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump includingfloor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the followingNote :- (i) The unit rate quoted shall bedeemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed toinclude all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work insideeach UG sump to prevent interruption of water supply to the users. (v)The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge (e)Over head tank capacity of 50000 GLN at INF BN.
7M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump includingfloor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the followingNote :- (i) The unit rate quoted shall bedeemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed toinclude all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work insideeach UG sump to prevent interruption of water supply to the users. (v)The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge (f) Over head tank capacity of 25000 GLN at 183MH.
8M&L for cleaning of inner surfaces of RCC under ground sump / semi under ground sump including floor of water intake sump includingfloor of water intake sump and applying two coats of white wash after taking out and removing silt, sludge, moss, algae, dirt etc. complete all as specified and directed upto the entire satisfaction of Engineer-in-charge for the followingNote :- (i) The unit rate quoted shall bedeemed to include draining of water with mechanical equipment and working in water and mud etc. (ii) The unit rate quoted shall be deemed toinclude all safety precautions which shall be taken while working on RCC underground sump/semi under ground sump. (iii) Lighting arrangements if required to be provided by the contractor temporarily at his own arrangements and the amount quoted for that shall be deemed to be inclusive in the unit rate and electricity / diesel shall not be provided by the Department. (iv) Contractor will not be allowed more than one day to complete the work insideeach UG sump to prevent interruption of water supply to the users. (v)The date of cleaning and due date of cleaning must be painted with synthetic enamel paint on the out side of the front tank wall as specified and directed by Engr-in-Charge (g) Semi under ground sump open type of capacity 10000 Gallon at Low Lift Pump house.
9Dismantling and strip opening of pumps completely including disconnecting the suction, delivery, vaccum pipe lines and coupling for repairs to pump and refitting/ re-assembling & connecting the same and testing of pumps complete all as specified and directed for the following capacities:- (a) Pump capacity 100 HP Note : (i) The rate considered is inclusive of T&P required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv)The cost of spares for pump considered separately under appropriate items here-in-after. (v) The rate considered are inclusive of transporting the pumps to Wksp and back to installation site.
10Dismantling and strip opening of pumps completely including disconnecting the suction, delivery, vaccum pipe lines and coupling for repairs to pump and refitting/ re-assembling & connecting the same and testing of pumps complete all as specified and directed for the following capacities:- (a) Pump capacity 50 HP Note : (i) The rate considered is inclusive of T&P required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv)The cost of spares for pump considered separately under appropriate items here-in-after. (v) The rate considered are inclusive of transporting the pumps to Wksp and back to installation site.
11Dismantling and strip opening of pumps completely including disconnecting the suction, delivery, vaccum pipe lines and coupling for repairs to pump and refitting/ re-assembling & connecting the same and testing of pumps complete all as specified and directed for the following capacities:- (a) Pump capacity 30 HP Note : (i) The rate considered is inclusive of T&P required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv)The cost of spares for pump considered separately under appropriate items here-in-after. (v) The rate considered are inclusive of transporting the pumps to Wksp and back to installation site.
12Dismantling and strip opening of pumps completely including disconnecting the suction, delivery, vaccum pipe lines and coupling for repairs to pump and refitting/ re-assembling & connecting the same and testing of pumps complete all as specified and directed for the following capacities:- (a) Pump capacity 20 HP Note : (i) The rate considered is inclusive of T&P required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv)The cost of spares for pump considered separately under appropriate items here-in-after. (v) The rate considered are inclusive of transporting the pumps to Wksp and back to installation site.
13Dismantling and strip opening of pumps completely including disconnecting the suction, delivery, vaccum pipe lines and coupling for repairs to pump and refitting/ re-assembling & connecting the same and testing of pumps complete all as specified and directed for the following capacities:- (a) Pump capacity 15 HP Note : (i) The rate considered is inclusive of T&P required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv)The cost of spares for pump considered separately under appropriate items here-in-after. (v) The rate considered are inclusive of transporting the pumps to Wksp and back to installation site.
14Dismantling and strip opening of pumps completely including disconnecting the suction, delivery, vaccum pipe lines and coupling for repairs to pump and refitting/ re-assembling & connecting the same and testing of pumps complete all as specified and directed for the following capacities:- (a) Pump capacity 7.5 HP Note : (i) The rate considered is inclusive of T&P required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv)The cost of spares for pump considered separately under appropriate items here-in-after. (v) The rate considered are inclusive of transporting the pumps to Wksp and back to installation site.
15Supply only the following spares for pump sets of capacity 100 / 50 HP (Note: Make of spares shall be of the original make of the pump) Make :- Kirloskar/ CG(14.01)Pump Shaft
16(14.02) Bronze impeller 1st stage
17(14.03) Bronze impeller 2nd stage
18(14.04) Wear ring Bronze
19(14.05) Inter stage ring Bronze
20(14.06) Water deflector rubber
21(14.07 ) Bearing cartridge cast iron drive end
22(14.08 ) Bearing cartridge cast iron non drive end
23(14.09) Shaft sleeve bronze drive end
24(14.10) Shaft sleeve bronze non drive end
25(14.11) Spacer sleeve drive end
26(14.12) Spacer sleeve non drive end
27(14.13) Key for impeller and sleeve
28(14.14) Bearing lock nut
29(14.15) Stuffing box bush
30(14.16) O" ring for shaft sleeve
31(14.17) Cast iron gland (Set of 2 halves)
32(14.18) Eye bolt for gland with nut and washer
33(14.19) Gland guide bush large
34(14.20) Gland guide bush small
35(14.21) Center link bush
36(14.22)Check nut
37(14.23) Shaft Pulley
38(14.24)Rubber coupling
39Supply only the following spares for pump sets of capacity 20HP / 15 HP (Note: Make of spares shall be of the original make of the pump)Make :- Kirloskar/ CG (38.01) Pump Shaft
40(38.02) Impeller
41(38.03) Casing wear ring
42(38.04) Casing cover
43(38.05) Lantern ring
44(38.06) Gland collar
45(38.07) Liquid deflector
46(38.08) Bearing housing
47(38.09) Support foot
48(38.10) Bearing cover
49(38.11) Shaft sleeve
50(38.12) Key for impeller
51(38.13) Key for coupling
52(38.14) Impeller nut
53(38.15) Washer for impeller
54(38.16) Gland packing
55(38.17) Grease Nipple
56(38.18) Gasket for casing cover
57(38.19) Gasket for shaft sleeve and shaft
58(38.20) O" ring for sleeves & impeller
59(38.21) Tie rod
60(18.22)Rubber coupling
61Supply only the following spares for pump sets of capacity 7.5 HP (Note: Make of spares shall be of the original make of the pump)Make :- Kirloskar/ CG (60.01) Pump Shaft
62(60.01) Impeller
63(60.02) Rotor
64(60.03) Spacer
65(60.04) Gland Collar
66(60.05) Lantern ring
67(60.06) Water deflector
68(60.07) Shaft Sleeve
69(60.08) Key for impeller
70(60.09) Gland packing
71(60.10) Priming plug
72(60.11) Washer for impeller nut
73(60.12) Gasket for casing cover
74(60.13) Split cotter Pin
75(60.14) Rubber coupling
76Supply only Drive end Ball bearing / Roller bearing for the following pumpsets:Pump Capacity 100HP (Make: SKF/FAG/Rolon/NRB)
77Supply only Drive end Ball bearing / Roller bearing for the following pumpsets:Pump Capacity 50HP (Make: SKF/FAG/Rolon/NRB)
78Supply only Drive end Ball bearing / Roller bearing for the following pumpsets:Pump Capacity 30HP (Make: SKF/FAG/Rolon/NRB)
79Supply only Drive end Ball bearing / Roller bearing for the following pumpsets:Pump Capacity 20HP (Make: SKF/FAG/Rolon/NRB)
80Supply only Drive end Ball bearing / Roller bearing for the following pumpsets:Pump Capacity 15HP (Make: SKF/FAG/Rolon/NRB)
81Supply only Drive end Ball bearing / Roller bearing for the following pumpsets:Pump Capacity 7.5HP (Make: SKF/FAG/Rolon/NRB)
82Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 100HP Note : (i)The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back.(v)The cost of spares for pump considered separately under appropriate items here-in-after.
83Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 50HP Note : (i)The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back.(v)The cost of spares for pump considered separately under appropriate items here-in-after.
84Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 30HP Note : (i)The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back.(v)The cost of spares for pump considered separately under appropriate items here-in-after.
85Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 20HP Note : (i)The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back.(v)The cost of spares for pump considered separately under appropriate items here-in-after.
86Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 15HP Note : (i)The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back.(v)The cost of spares for pump considered separately under appropriate items here-in-after.
87Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 7.5HP Note : (i)The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back.(v)The cost of spares for pump considered separately under appropriate items here-in-after.
88Dismantling and strip opening of motor completely including disconnecting the cable connections and coupling of the motor removing the starter and rotor units, bearings complete, servicing the motor assembly including cleaning the carbon, greasing the bearings etc.and refitting the same after repairs including connecting up of the electric connections & testing complete all as specified by Engr-in-charge for the following capacities:- Motor capacity 5HP Note : (i)The rate considered is inclusive of tools and plants required for carrying out the repairs. (ii)The rate considered is inclusive of cost towards miscellaneous items such as cotton waste, grease and other consumables. (iii)The rate considered is inclusive of checking of alignment of pump with dial gauge after refitting. (iv) The rate considered are inclusive of transporting the motors to Wksp and back.(v)The cost of spares for pump considered separately under appropriate items here-in-after.
89Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelledcopper winding wire complete including varnishing and heating all as specified anddirected of the following sizes:(a) Electric motor, 3 phase 100 HP capacity
90Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelledcopper winding wire complete including varnishing and heating all as specified anddirected of the following sizes:(a) Electric motor, 3 phase 50 HP capacity
91Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelledcopper winding wire complete including varnishing and heating all as specified anddirected of the following sizes:(a) Electric motor, 3 phase 30 HP capacity
92Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelledcopper winding wire complete including varnishing and heating all as specified anddirected of the following sizes:(a) Electric motor,20 HP capacity
93Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelledcopper winding wire complete including varnishing and heating all as specified anddirected of the following sizes:(a) Electric motor,15 HP capacity
94Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelledcopper winding wire complete including varnishing and heating all as specified anddirected of the following sizes:(a) Submersible Electric motor,7.5 HP capacity
95Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelledcopper winding wire complete including varnishing and heating all as specified anddirected of the following sizes:(a) Electric motor,5 HP capacity
96Material & Labour for rewinding of electric motor starter or rotor after removing the burnt out winding wire completely, cleaning the slots of starter or rotor thoroughly and rewinding with same gauge, number of turns, weight of super enamelledcopper winding wire complete including varnishing and heating all as specified anddirected of the following sizes:(a) Electric motor,3 HP capacity
97Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor.Electric motor, 3 phase 100 HP capacity (Make: SKF/FAG/Rolon/NRB)
98Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor.Electric motor, 3 phase 50 HP capacity (Make: SKF/FAG/Rolon/NRB)
99Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor.Electric motor, 3 phase 30 HP capacity (Make: SKF/FAG/Rolon/NRB)
100Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor.Electric motor,20 HP capacity (Make: SKF/FAG/Rolon/NRB)
101Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor.Electric motor,15 HP capacity (Make: SKF/FAG/Rolon/NRB)
102Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor.Electric Submersible motor,7.5 HP capacity (Make: SKF/FAG/Rolon/NRB)
103Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor.Electric motor,5 HP capacity (Make: SKF/FAG/Rolon/NRB)
104Supply only ball bearing/ roller bearing (Non drive end bearing) for the following electric motor.Electric motor,3 HP capacity (Make: SKF/FAG/Rolon/NRB)
105M & Lfor painting of pump set of capacity 15HP to 100HP, including connected starter inside pump house with two coats of anti corrosive synthetic enamel paint over a coat of red oxide primeras per existing colour after preparation of old painted surfaces complete all as specified and directed.
106Testing of water for potability test by chemical and bacteriological from any Govt. laboratory such as PH value, Total dissolved solids, hardness as CaCO?, Calcium, Magnesium, Chlorides, Sulphates, Nitrate, Alkalinity, Iron, Turbidity NTU, Mineral oil, Colur hazen units, Taste, Odour, Residual free Chlorine, Total Coliform per 100ml (Microbiologocal test) & E Coli per 100ml (Microbiological test) complete and report to be submitted to the department in triplicate in hard bound copy complete all as specified and as directed
107S&F in repairs cast iron flanged type foot valve 200mm dia bore as per IS 4038 with Cast Iron strainer in two parts, mushroom valve gun metal seat and perforated CI/MS strainercomplete all as specified and directed. (Make: Kirloskar (KBL)/L&T/Leader)
108S&F in repairs cast iron flanged type foot valve 150mm dia bore as per IS 4038 with Cast Iron strainer in two parts, mushroom valve gun metal seat and perforated CI/MS strainercomplete all as specified and directed. (Make: Kirloskar (KBL)/L&T/Leader)
109S&F in repairs cast iron flanged type foot valve 100mm dia bore as per IS 4038 with Cast Iron strainer in two parts, mushroom valve gun metal seat and perforated CI/MS strainercomplete all as specified and directed. (Make: Kirloskar (KBL)/L&T/Leader)
110S&F in repair fully automatic star delta motor starter in sheet enclosure or fix type ML-03 suItable for 90 HP electric motor 3 phase, 440 volts and 50 HZ complete all as specified and directed. Make : BCH / Havells / L&T / Siemens / Crompton Greaves
111S&F in repair fully automatic star delta motor starter in sheet enclosure or fix type ML-03 suItable for 50 HP electric motor 3 phase, 440 volts and 50 HZ complete all as specified and directed. Make : BCH / Havells / L&T / Siemens / Crompton Greaves
112S&F in repair fully automatic star delta motor starter in sheet enclosure or fix type ML-03 suItable for 30 HP electric motor 3 phase, 440 volts and 50 HZ complete all as specified and directed. Make : BCH / Havells / L&T / Siemens / Crompton Greaves
113S&F in repair fully automatic star delta motor starter in sheet enclosure or fix type ML-03 suItable for 20 HP electric motor 3 phase, 440 volts and 50 HZ complete all as specified and directed. Make : BCH / Havells / L&T / Siemens / Crompton Greaves
114S&F in repair fully automatic star delta motor starter in sheet enclosure or fix type ML-03 suItable for 15 HP electric motor 3 phase, 440 volts and 50 HZ complete all as specified and directed. Make : BCH / Havells / L&T / Siemens / Crompton Greaves
115S&F in repair MCCB AC 415 volts, 250 Amp rating, breaking capacity of 35 KA,4 Pole, Conforming to IEC:60947-II / IS:13947-II)complete all as specified and directed.(Make Havells cat No - IHLFNF0250 or equivalent ofL&T / Legrand / Schneider)
116S&F in repair MCCB AC 415 volts, 630 Amp rating, breaking capacity of 36 KA,4 Pole, Conforming to IEC:60947-II / IS:13947-II)complete all as specified and directed. (Make Havells cat No - IHLLSEBF0630 or equivalent ofL&T / Legrand / Schneider)
117S&F in repair Change over Switch( Conforms to IEC 60947-3 , IS/IEC 60947-3) Range 400A ,415Volts, 4 Pole, Encloser version does not require separate cable gland box, Terminal Shrounds, Source Separator and Phase barriers included, Straggered Terminals Make Cable Termination Easy, Suitable for horizontal as well as vertical mountingFollowing Sizes Make : BCH / Havells / L&T / Siemens / Crompton Greaves
118S&F in repair Change over Switch( Conforms to IEC 60947-3 , IS/IEC 60947-3) Range 250A ,415Volts, 4 Pole, Encloser version does not require separate cable gland box, Terminal Shrounds, Source Separator and Phase barriers included, Straggered Terminals Make Cable Termination Easy, Suitable for horizontal as well as vertical mountingFollowing Sizes Make : BCH / Havells / L&T / Siemens / Crompton Greaves
119S&F in repair 3 pole Power Contractorss -Type MNX , Conforms to IS /IEC 60947-4-1& IEC 60947-4-1, Click fit type consuction up to 40a, MNX 140 Complete all as specified and directed.
120S&F in repair for 3 pole Power Contractorss -Type MNX , Conforms to IS /IEC 60947-4-1& IEC 60947-4-1, Click fit type consuction up to 40a, MNX 110 Complete all as specified and directed.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail