Kisan Sahkari Chini Mills Limited-KHERI has published Tender For Competitive Ebidding For Job Work Of Miscellaneous Fabrication Season 2023-24. Submission Date for this Tender is 05-07-2023. Clothing Accessories Tenders in saharanpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Boiler House |
2 | Dismantling of C.I. feeding chute of 20 Ton Boiler & fitting of CI mouth-piece/ chute complete work |
3 | Dismantling fabrication & fitting of complete new casing of ID Fan with cone of Boiler. For 30/20 ton boiler |
4 | Dismantling fabrication & fitting of complete new casing of ID Fan with cone of Boiler. For 40 ton boiler |
5 | Fabrication & erection of runner supporting box below at old MBC/New MBC/Cross carrier/ bagasse elevator. |
6 | Replacement of worn out Bottom & side plate of Bagasse carrier/ Bagasse/Elevator/ cross carrier/ RBC/IRC by MS/SS plates |
7 | Replacement of worn-out ducting dampers of I.D./ FD Fan, and other ducting with levers and bushes |
8 | Outside cleaning & painting of 30/20 TPH boiler chimney in double coat with high tempeture resistant paint |
9 | Replacement of worn-out ducting of flue gas |
10 | Fabrication & fitting of bagasse/ash chute for new & old boilers |
11 | Reparing of wet scrubber shell demister of the 20, 30 & 40 Tons Boiler |
12 | Fabrication & fitting of bagasse sliding gate for bagasse Carriers |
13 | Fabrication & Erection of the bagacillo impeller with trial. |
14 | Dismantling of MS plates of boiler side wall, economizer and boiler roof for replacement of boiler tubes. Dismantled old plates to be fitted with minor repair/patching after replacement of boiler tubes. |
15 | Replacement of runners of new MBC /old MBC /bagasse Elevator /Cross Carrier & RBC |
16 | Welding on teeth of new MBC /old MBC / bagasse Elevator /Cross Carrier & RBC chain sprocket to be done& teeth to be made as per profile |
17 | Repair of boiler ID Fan casing & successful trial. |
18 | To replace worn out blower casing of boiler D.M.Plant |
19 | To replace worn out bagasse blower casing at bagasse elevator |
20 | Complete hardfacing of ID Fan Impeller |
21 | Dis., Fab. & Erection of New Boiler I.D. Expantion Joint |
22 | Dis. Cleaning , Repair & fitting of 20,30 & 40 Ton Boilers internal fitting, |
23 | Replacement of worn out Beam Size- 4”/5” of Boiler No.1 & 2 Farnace and chamber. |
24 | Fabrication of Bagasse Feeding Jantra of Tractor |
25 | Fabrication & fitting of bagasse chute at belt conveyor |
26 | Reparing of Grade Bars of the 40 Tons Boilers |
27 | To replace worn out bagasse blower casing at bagasse elevator |
28 | Replacement of worn out teeth of bagasse feeder rotating drum of boiler no-3,4 & 5 with satisfactory trial |
29 | Dismantling, fabrication & erection of ID. Fan blade with Back Plate, Ribs and suction cone. (A) 20 Ton Boiler (B) 30 Ton Boiler |
30 | Dismantling, fabrication & erection of ID. Fan blade with Back Plate, Ribs and suction cone. (C) 40 Ton Boiler |
31 | Fabrication & fitting of chain guide of new MBC /old MBC /bagasse Elevator /Cross Carrier & RBC |
32 | Fitting of new 8mm thick MS plate ring on base plate of boiler ID fan impeller for strengthening |
33 | Dismantling,fabrication and fitting ofworn out portionof old feed tank ofBoiler No.1,2& 3 |
34 | Replacement of worn out MS Beam and Channel arrangement Size- 4”/5” of Boiler No.1 & 2arch. |
35 | To replace worn out blower casing of boiler D.M.Plant |
36 | Dismantling,fabrication and fitting of safty valve worn out discharge assembly with proper support |
37 | Schedule Work |
38 | Dismantling of M.S. Pipe Line including bend/flange etc Up to 12” dia |
39 | Fabrication & Erection of M.S. Pipe Line Up to 12” dia |
40 | Fabrication & Erection of Bend up to 12” dia (MS) |
41 | Fabrication & Erection of Nipple up to 12” dia (MS) |
42 | Fabrication & Erection of Cross up to 12” dia (MS) |
43 | Fabrication & Erection of Tee up to 12” dia (MS) |
44 | Fabrication & Erection of Flange up to 12” dia (MS) |
45 | Fabrication & Erection of Blind up to 12” dia (MS) |
46 | Fabrication & Erection of Reducer up to 12” dia (MS) |
47 | Fabrication & Erection of Elbow up to 12” dia (MS) |
48 | Fabrication & Erection of Bend up to 12” dia (SS) |
49 | Fabrication & Erection of Nipple up to 12” dia (SS) |
50 | Fabrication & Erection of Cross up to 12” dia (SS) |
51 | Fabrication & Erection of Tee up to 12” dia (SS) |
52 | Fabrication & Erection of Flange up to 12” dia (SS) |
53 | Fabrication & Erection of Blind up to 12” dia (SS) |
54 | Fabrication & Erection of Reducer up to 12” dia (SS) |
55 | Fabrication & Erection of Elbow up to 12” dia (SS) |
56 | Dismantling of valve up to 12” dia |
57 | Fitting of valve up to 12” dia |
58 | Dismantling of valve above 12” dia |
59 | Fitting of valve above12” dia |
60 | Dismantling Fabrication & fitting of man hole |
61 | Fabrication & Erection of Bend above 12” dia |
62 | Fabrication & Erection of Nipple above 12” dia |
63 | Fabrication & Erection of Tee above 12” dia |
64 | Fabrication & Erection of Flange above 12” dia |
65 | Fabrication & Erection of Blind above 12” dia |
66 | Fabrication & Erection of Reducer above 12” dia |
67 | Fabrication & Erection of Elbow above 12” dia |
68 | Dismantling of M.S. Pipeabove 12 “ dia |
69 | Fabrication of M.S. Pipe above 12” dia |
70 | Erection of M.S. Pipe above 12” dia including bend flange & nipple etc. |
71 | Dismantling of old worn-out Platform |
72 | Fabrication & erection of platform by using old plate |
73 | Fabrication & erection of Cat Ladder |
74 | Fabrication & erection stair case |
75 | Fabrication & erection of railing from old Material |
76 | Fabrication & erection of railing from old Material |
77 | Fabrication & erection of unvested type ring over evaporator vapour pipe/Pan vapour Pipe |
78 | Dismantling ofS.S. Pipe Linewith bend & flange |
79 | Fitting of S.S. Pipe Line with bend & flange. |
80 | Dismantling of MS heavy structure / Tank |
81 | Dismantling of MS Light structure |
82 | Fabrication & Erection Light structure |
83 | Fabrication & Erection heavy structure |
84 | Fabrication of Pump bed with Pump, Reduction gear & motor alignment up to 30 H.P. |
85 | Fabrication of pump bed with pump, reduction gear box & motor above 30 HP |
86 | Dismantling, fitting and expanding of SS/Brass tubes with satisfactory hydraulic testing for quad/ J. Heater/ Vapour Cells |
87 | Dismantling, fitting and expanding of SS/Brass tubes with satisfactory hydraulic testing for Pan Tube |
88 | SS Plate lining in different size of equipments. |
89 | Dismantling, cleaning & fitting of MS Pipe Line with bend, flange , nipple etc. |
90 | Fitting of MS pipe line with bend, flange ,nipple etc |
91 | Fabrication & Erection ofcomplete Square / Rectangular Tank/Round with conical Bottom |
92 | Fabrication & fitting ofMS Coil (coils are to be duly bend and not offset pipe welding .Offset welds shall not be treated as coils but as pipes ) |
93 | Fabrication & fitting ofSS Coil |
94 | Welding work for various equipments in B/H |
95 | Dismantling , Fabrication & fitting ofnew Coneand umbrella anywhere in the factory. Cone up to 01 Mtr. Dia |
96 | Dismantling, Fabrication & fitting of new Coneand umbrella any where in the factory.Cone above 01 Mtr. Dia upto 2.5mtr dia. |
97 | Dismantling , Fabrication & fitting of new Coneand umbrella any where in the factory, Cone above 2.5 Mtr. Dia |
98 | Fabrication and Patchwotk of equipmentsusing old/ NewMS plateby 6/8 mm thick plate overround vessels/any vessels |
99 | Mill House |
100 | Cutting of Cheveran Grooveson Mill Rollers |
101 | Cutting of pine apple grooves on Mill Rollers. |
102 | Replacement of Runners of cane carrier ,S.RC & IRC MBC and RBCand cane un loader power supply angle |
103 | Welding of worn-out holes of Block type chain Link, Rack holding square and duere drilling of holes |
104 | Replacement of worn-out bootof SRC& IRC |
105 | Fabrication of new juice rings |
106 | Dismantling, Grinding & erection of the square bar of cane unloader |
107 | Welding on Wearout Mill and GRPF crown pinion Teeth as per profile. |
108 | Fabrication and replacement of new Mill Juice/ waterimbibitionsbox/distributer. |
109 | Fabrication. & erection. of Mill rollerfeed & discharge bearing cover from 10 mm/ 8mm plate. |
110 | Fabrication & Erection of runner supporting box below runner at IRC, SRC & cane carrier, MBC and RBCand Bagasse elevator. |
111 | Replacement of worn out deflector plate and top plate of cane chopper/ cane leveler /Fibrizer by M.S. plate/ ss lining plates along with strengthening. |
112 | Fabrication & erection of cane carrier chain side angle. |
113 | Fabrication & erection of return cane carrier chain supporting runner/chain guide. |
114 | Fabrication & Erection of worn out MS Plate of truck Tripler, SRC, IRC & cane carrier side plate. |
115 | Sprocket teeth repairing and strengthening with extra support of IRC/SRC/Elevator/MBC/RBC |
116 | Repair & hard facing of Auxiliary cane carrier Kicker /Pusher |
117 | Welding & Hard facing on wear out under feed roller teeth,side & Shell of roller. |
118 | Replacement of worn-out Juice screen Plate of screw bagasseconveyorat mill |
119 | Repair and hard facing on cane leveller/ chopper hubs |
120 | Lever bracket of underfeed roller scraper to be changed & to be fitted on as per direction. |
121 | Partition plate of half anvil to be changed completely with 25 mm plate & hard facing. |
122 | Welding and forging in holes of cane carrier chain links. |
123 | Fabrication of 10” size Non return valve from M.S. Plate with fitting & leak proof trial. |
124 | Fabrication & erection of Rotary filter MS conical juice tank. |
125 | Extension of SS Juice distributer pipe of rotary filter |
126 | Repair of cane carrier slates such as worn-out side wear plates holes& other to be done |
127 | Fabrication & hard facing of under feed roller scrapper as per instructions to be done. |
128 | Welding on wear out teeth of cane carrier, S.R.C. & I.R.C. sprockets to bedone & teeth to be made as per profile |
129 | MS Ring to be fitted on worn-out both side of bagasse pusher at fibrizer& hard facing to be done on Square bars fitted |
130 | Welding & grinding of GRPF Scrapper to be done to make them as per profile & hard facing to be done |
131 | Repair & hard facing of cane UnloadedGrab Finger |
132 | Underfeed Roller pinion hard facing/welding |
133 | Repairing of MS Guard/ cover mill rollers crown pinion |
134 | Dismantling & fabrication of bagacillo screen with Modification as per instruction. |
135 | Dismantling of sprokets of SRC/IRC/Elevator drive/trail nd shaft and fitting the same with successful trail |
136 | Rotary screen wornout support box replacement & accordingly strenthening its platform with successful trail |
137 | SS plates patching on the truff of IRC/ SRC and Mills" Head Stock |
138 | Pan House |
139 | Repairing of down-take of Pan for 40/50 Ton Pan |
140 | Repairing of down-take of Pan for 60/80 Ton Pan |
141 | Replacement of worn out/ broken angle arms of crystallizer |
142 | Dismantling of Gutter of Molasses Magma & massecuite. |
143 | Fabrication & fitting of Gutter of Molasses, Magma & massecuite. |
144 | Repairing of hinge type cover of Gutter |
145 | Replacement of worn-out condensate box of pans, quad & juice heaters |
146 | Dismantling Fabrication & fitting of new umbrella in pans with supports & J pipes 40/50 Ton pan |
147 | Dismantling Fabrication & fitting of new umbrella in pans with supports & J pipes 60/80 Ton pan |
148 | Repairing of umbrella of Pans with supports & J pipes 40/50 Ton pan |
149 | Repairing of umbrella of Pans with supports & J pipes 60/80 Ton pan |
150 | Replacement of worn out distributor by new for 40/50 Ton Pan |
151 | Replacement of worn out distributor by new for 60/80 Ton Pan |
152 | Repair of wornout/ broken of air cooled, vacuum & seed crystallizer |
153 | Dismantling of 40 Ton pan complete body shell with save all and umbrella feed header, distributer, etc & fabrication of shell with 12/10mm MS plate with satisfactory trial |
154 | Replacement of complete worn-out top conical portion of Pan by new withsupports of associated machinery parts proper strengthening-40/50 Ton Pan |
155 | Replacement of complete worn-out top conical portion of Pan by new withsupports of associated machinery parts proper strengthening-60/80 Ton Pan |
156 | Strengthening of 40/60 Ton Pan body &Taper Portion with channel etc. |
157 | Replacement of worn out bushes of air cooled crystallizer of both side & completion with proper alignment & successful trial (Bushes will be provided by the factory)- Both side (rate ratio drive : non drive end shall be 65:35) |
158 | Dismantling Fabrication & Erection of Box type feed header for each Pan with related all connections. |
159 | Dismantling Fabrication & Erection of worn out portion of pan body with 12mm plate with water & vacuum trial |
160 | Replacement of wearout/wornout Ms side & bottom plate of water over head tank/ syrup storage tanks at pan station |
161 | Repairing of wearout/wornout down take of pans 40/50 Ton |
162 | Repairing of wearout/wornout down take of pans 60/80 Ton |
163 | Repairing of wearout/wornout save-all of pans 40/50 Ton |
164 | Dismantling , fabrication and erection of pan save all with proper trial 40/50 Ton |
165 | Dismantling , fabrication and erection of 40 Ton pan no 5 calendria with proper trial |
166 | Dismantling , fabrication and erectionof 80 Ton Pan no 10 taper portion and save all |
167 | Dismantlingand erectionof 80 Ton Pan no 1 shell and save all |
168 | Dismantling , fabrication and erection of pan save all with proper trial 60/80 Ton |
169 | Repairing of wearout/wornout save-all of pans 60/80 Ton |
170 | Evaporator & Clarification House |
171 | Dismantling, repair & refitting, cleaning work of catcher of new Semikestner (Uttam Set) |
172 | Dismantling, fabrication & erection work of Evaporator body/ Semikestner/vapour cell newsave all |
173 | Major repair of save all of the evaporator body/Semikestner /vapour cell |
174 | Dismantling, fabrication & erection ofnew Juice heater Header withribs& fitting of cover with satisfactory trial |
175 | Dismantling, fabrication & erection work of the sulphur furnace melter/melt receiver along with steam coil and their hydraulic testing. |
176 | Dismantling, Fabrication & erection of sulphur furnace cooler with its pipe cooling coil complete connection of water and associated pipe lines with satisfactory trial |
177 | Repairing of sulphur furnace cooler with its pipe cooling coil and complete connection of water cooling pipe and gas line. |
178 | Dismantling, fabrication & erection of Juice receiving bottle fitted at vacuum filter station |
179 | Dismantling, fabrication & erection of condenser at vacuum filter. |
180 | Dismantling, fabrication & erection of Mud juice receiving tank complete with connection & associated pipe lines. |
181 | Dismantling, fabrication & erection of mud tray of vacuum 8’ x16’ vacuum filter |
182 | Dismantling, fabrication & erection of mud tray of vacuum 10’ x20’ vacuum filter |
183 | Dismantling, fabrication & erection of vacuum filter agitator. |
184 | Dismantling, fabrication & erection of the juice box of juice heater with satisfactory trial. |
185 | Dismantling Fabrication & fitting of bagacillo pipe. |
186 | Dismantling , fabrication & erection of clear juice Liquidation box with trial |
187 | Dismantling, fabrication & erection of clarifier mud boot. |
188 | Dismantling, fabrication & erection ofJuice catcher for Raw/vacuum/sugar melter /sulphitedJuice pumpswith suction/ delivery connection |
189 | Repairing of Juice Heater Condensate Bottle /Evaporator/Syrup receiving Bottle with leak proof testing partition plate with all connection. |
190 | RepairingofSO2 furnace sublimation pipe with its leaking Tower etc. with testing |
191 | Dismantling, fabrication & erection of vacuum filter mud mixer body & fitting of screw conveyor with proper alignment & satisfactory trial. |
192 | Fabrication & erection of screw conveyor from 6mm thick plate with satisfactory trial. |
193 | Dismantling, fabrication & fitting of new down take of quad / Old or New semikestner, etc. |
194 | Dismantling, fabrication and erection of new recovery tower of juice sulphiter/ Syrup Sulphiter. |
195 | Replacement of muddy juice tank fitted at vacuum filter with new plates & with all connections. |
196 | Repairing of Umbrella of Quad & Pan |
197 | Dismantling, fabrication & erection of worn out Umbrella of Quad & Pan |
198 | Dismantling, fabrication & erection ofsaveall ofQuad old bodies |
199 | Dismantling, fabrication & erection ofsaveall ofQuad Uttam set. |
200 | Replacement of worn-outtop conical portion ofQuad & Vapour Shell with save all proper strengthening with associated machinery |
201 | Dismantling, Repair, & erection of worn out Juice heater partition plate with ribs. |
202 | Dismantling of worn out arms and shell (outside & inside) of juice sulphiter drum, fabrication & erection with satisfactory trial. |
203 | Dismantlingof worn out central drum & bed of juice sulphiter, fabrication & erection with satisfactory trial. |
204 | To replace worn out clear juice box / mud discharge box with valve of new door followed by satisfactory trial |
205 | Dismantling ofwear outjuice heater cover, fitting of new 12 mm thick MS plate by welding & bolting including repair of lever & erection of cover followed by satisfactory water trial. |
206 | To replace worn out mud scrapper plate with support & vacuum filter fitting to be done. |
207 | To replace worn out juice baffle plate of door compartment |
208 | Fabrication & erection of new sulphur furnace after dismantling of old furnace with successful water/Air trial. |
209 | Major repair of lime slaker with proper alignment & trial |
210 | Dismantling & erectionofQuad 440 sq. mtr. calendria include all connection with successful trail |
211 | Dismantling, fabrication & erection of After burner vessel. For So2 furnace. |
212 | To replace worn out sulphur furnace header of size 8” /10” |
213 | Dismantling, fabrication & erection of ammonia pipe inside new Evaporator body |
214 | Replacement of worn-out Stirrer arms of clarifier completed with all support and squeezers etc. |
215 | Dismantling and repairing of 2300 sq mtrs SK catcher of uttam quad set With Satisfactory trial |
216 | Dismantling & erection work of Uttan Quad set 2300 sq. mtr calendria include all connection with successful trial |
217 | Replacement of partition plate of old door Compartment with 5/6 mm MS plate |
218 | Replacement of cooling coil pipe of C- vertical crystalizer 930 mtr with new M.S. pipesize 3" with proper hydraulic testing and trial |
219 | Dismantling, fabrication & erection of 440 sq mtr quad body shell with save all, top taper cone, manhole and its all connection with satisfactory trial |
220 | Dismantling & erectionofUttam Quad 1700 sq. mtr. calendria shell all connection with successful trail |
221 | Erection work of transfer pump bottle size 3mtrX1.5mtr connection. |
222 | Centrifugal House |
223 | To replace worn-out molasses Jacket of B & C Continuous Centrifugal Machine with proper Trial. |
224 | To Replace worn-out “A” Centrifugal Machine Molasses Chute/housing chute followed by satisfactory trial. |
225 | To replace worn out half portion of horizontal sugar melter in Centrifugal house with steam & juice connection followed by satisfactory trial. |
226 | Dismantling of worn out B & C centrifugal m/c, Magma mixture shaft, fabrication of complete new shaft with 12mm plate, fitting of arms etc. with successful trial. |
227 | Replacement of damaged portion of hopper |
228 | Broken Shaft of Cryst. To be made correct or replaced by new one andproper alignment to be done. |
229 | Replacement ofwornoutbushes & Arms of Sugar Melter with satisfactoty trial |
230 | Replacement of cooling pipe of C & B Mono Cryst. |
231 | Replacement of wornout suction pipe of MF- 50X50/ 40X40 injection & spraypump |
232 | C- Pug mill, Magma mixer, broken shaft to be taken out andto be repaired/ to be changed new along with bush, support & arm to be fitted a satisfactory trial. |
233 | Repairingof B & C massecuitemono Cryst. Leakage coil with Hydraulic testing & and successdul trial. |
234 | B & C Magma Mixer, Pugmill worn-out broken Shell to be replaced, work to br completedwith satisfactory trial. |
235 | Dis. Of worn-outB & C magma mixer shaft, fab.& erection of the shaft with 12 mm M.S. Plate, fittingand successful trial. |
236 | Replacement ofworn- out molasses ring of 1350 KT C/F Machine. |
237 | Dis.,fab. & Erection of New. Fan ofE.T.P. aerator |
238 | Dismantling, fabrication & erection of worn out WK1350 C/F machine cover. |
239 | Replacement ofdamaged hopper air try with new plate |
240 | Replacement ofworn out magma/pug mill worn out padestal arms. |
241 | Replacement ofweak/wearout MS jali of hopper &fitting with frame |
242 | Dismantling Fabrication and erection of air diffuser for ETP from old boiler tubes |
243 | Replacement of worn-out bed of sugar exiter with proper strengthening |
244 | Replacement of damaged /worn-out arms of mono crystillizer |