Ministry Of Road Transport And Highways has published Tender For Consultancy Services For Preparation Of Feasibility Studies, General Arrangement Drawing ( G.A.D.) And Detailed Geotechnical Investigation By Taking Trial Bores For Chandrapur City Bypass And Construction Of Road Over Bridge ( R.O.B. ) Ove. Submission Date for this Tender is 04-08-2023. Road Work Tenders in chandrapur Maharashtra. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Key Personnel |
2 | Team Leader cum Senior Highway Engineer |
3 | Senior Bridge Engineer |
4 | Highway cum Pavement Engineer |
5 | Material-cum-Geotechnical Engineer- Geologist |
6 | Senior Survey Engineer |
7 | Traffic and Safety Expert |
8 | Environmental Specialist |
9 | Quantity Surveyor/ Documentation Expert |
10 | Land Acquisition Expert |
11 | Utility Expert |
12 | B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate) |
13 | To be filled by Consultant |
14 | To be filled by Consultant |
15 | To be filled by Consultant |
16 | To be filled by Consultant |
17 | To be filled by Consultant |
18 | To be filled by Consultant |
19 | To be filled by Consultant |
20 | Support Staff |
21 | Office Manager |
22 | Typist |
23 | Office Boy |
24 | Night Watchman |
25 | The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants |
26 | Duty Travel to Site (Fixed Costs) |
27 | Office Rent (Fixed Costs) The rent cost includes maintenance, Cleaning, repairs, etc. |
28 | VI. Office Supplies, Utilities and Communication ( Fixed Costs ) |
29 | Office Supplies Drafting |
30 | Supplies computer |
31 | Running Costs |
32 | Domestic and International Communication |
33 | Office Furniture and Equipment ( Rental ) |
34 | Office Furniture and Equipment |
35 | VIII.Reports and Document Printing |
36 | Monthly Report (3 per month) |
37 | Inception Report & QAP |
38 | Environment and Social Impact Screening Report |
39 | Draft Feasibility Report |
40 | Final Feasibility Report |
41 | Strip Plan with L.A. Reports |
42 | Draft LA and Clearances I Report |
43 | Final LA and Clearances I Report |
44 | Draft Environmental Assessment report & RAP |
45 | Final Environmental Assessment report & RAP |
46 | Draft Detailed Design Report & Drawings etc. |
47 | Draft EMP |
48 | Draft Bidding Documents |
49 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc |
50 | Final EMP |
51 | Final Bidding Documents |
52 | Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each) |
53 | LA & Clearances II Report |
54 | IX Survey and Investigation |
55 | Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer. |
56 | Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology |
57 | B. Investigation (Fixed cost) |
58 | Road and Bridge Inventory |
59 | FWD Test and Pavement Evaluation |
60 | Roughness Survey |
61 | Axle Load Survey |
62 | Material Survey and Investigation |
63 | Sub-grade Investigation |
64 | Traffic Survey |
65 | Socio-economic & Census Survey/ Studies |
66 | Land Acquisition Studies |
67 | Any other investigations/surveys |
68 | C. NET WORK SURVEY AND GPR |
69 | Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority |
70 | GPR Survey for detection of under ground utilities |
71 | Cost of supply and fixing boundary pillars |
72 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) |
73 | Land acquisition Team including support staff and logistics/transportation |
74 | Ex-Land revenue inspector/officer or equivalent |
75 | EX-kanoogo/Girdwar or equivalent |
76 | Ex-Patwari or equivalent |
77 | typist |
78 | peon |
79 | Logistic for Land Acquisition Team |
80 | computer including necessary peripherals |
81 | printers |
82 | Vehicles(Bolero or equivalent )with monthly running limit of 4000 km |
83 | Estimate of Costfor Expatriate Consultants (INR) Remuneration of Exptriate staff including per diem allowances |
84 | Staff 1 |
85 | Staff 2 |
86 | Staff 3 |
87 | Staff 4 |
88 | Staff 5 |
89 | Staff 6 |
90 | International Airfares (Fixed Cost) Mobilization andDemobilization |
91 | Position 1 |
92 | Position 2 |
93 | Position 3 |
94 | Position 4 |
95 | Inland Travel in Home Country (Fixed Costs) |
96 | Airlines |
97 | Other Miscellaneous expenses (like DA, internal travel expenses other incidentals) |
98 | Income Tax (Expariate)( as per prevaling Norms) |
99 | Other Taxes / Duties (if any) Specify clearly |
100 | Goods & Service Tax( as per prevaling Norms) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail