Supply And Fixing Hdpe 2 Nos. Pre-Fabricated Toilet Supply Prefabricated Toilet Shall Be Suitable For Mounting On Readymade Platform / Plain Ground. The Components Shall Be Fabricated And Assembled At Factory. The Structure Shall Be Manufactured As Per The Detailed Specifications Given Herein. Overall Size ( Minimum ) : 1100Mm ( W ) X1100mm ( B ) X2300 ( H ) Floor / Base : The Double Wall Constructed Readymade Base Shall Be Made Out With Hdpe Materials .Water Tap For Indian Style Toilets Should Be Inbuilt In The Case To Insure Leak Free Operations .The Base Shall Be Single Piece Molded 2 2 Supply And Fixing Hdpe 2 Nos. Pre-Fabricated Toilet Earthwork Excavation / Cutting In Ordinary Soil For Foundation, Septic Tank , Earth Pit &Filling / Clearing Accumulated Waste Sand Including Shoring & Shuttering Wherever Required And Depositing The Spoil Earth With Initial Lead And Lift , Watering Consolidating Etc. Complete As Per Standard Specification 3 3 Supply And Fixing Hdpe 2 Nos. Pre-Fabricated Toilet Reinforced Cement Concrete M15 ( 1:2:4 ) For Slab By Using 20Mm &Downgraded Stone Aggregate Including All Cost & Conveyance Of Materials, Loading & Un Loading Charges, Hire &Labour Charges For Shuttering / Form Work, Labour Charges For Mixing, Laying, Ramming, Watering & Curingetc.At All Heights And Levels But Excluding Cost Of Cement & M.S Bar Etc. Complete As Per Standard Specification 4 4 Supply And Fixing Hdpe 2 Nos. Pre-Fabricated Toilet Ms Reinforcement ( Fe 500 ) Bent, Tied And Placed In Position For All Rcc Works At All Heights & Levels Including All Cost And Conveyance Of Ms Bars &Binding Wire, Loading Unloading Charges, All Labour Charges For Straightening, Cutting, Bending, Binding With Approved Annealed Binding Wires Or Welding Wherever Required Etc. Complete As Per Std. Specification 5 5 Supply And Fixing Hdpe 2 Nos. Pre-Fabricated Toilet Cement Block Masonry Using Autoclaved Aerated Cement Blocks For Foundation & Super Structure Above Plinth Level Up To 3.00M Level In Cement Mortar 1:6 The Rate Includes Cost And Conveyance Of All Materials, All Labour Charges, Hire Charges For Tools And Plants, Loading-Unloading Charges, Curing Etc. Complete As Per Standard Specification But Excluding Cost Of Cement. 6 6 Supply And Fixing Hdpe 2 Nos. Pre-Fabricated Toilet Plastering With Cm 1:4, 15Mm Thick One Coat At All Heights And Levels Floated Hard And Trowelled Smooth Including All Cost And Conveyance Of Materials And Labour Charges, Providing Necessary Scaffolding, Watering And Curing Etc. Complete As Per Standard Specification But Excluding Cost Of Cement. 7 7 Supply And Fixing Hdpe 2 Nos. Pre-Fabricated Toilet Supplying, Laying And Fixing 110Mm Dia. Pvc Pasted Type Pipe ( 4 Kg / Cm2 ) For Down Water Pipe / Sanitation Lines Etc. Including Cutting Masonry Or Concrete Floor, Sun Shade Etc. Where Ever Found Necessary For Taking Connections Fixing The Pipes To The Walls With Stainless Steel Clamps And St.Screws Including All Cost And Conveyance Of Materials All Specials Such As Bends, Elbows, Sockets, 8 8 Supply And Fixing Hdpe 2 Nos. Pre-Fabricated Toilet Supplying, Laying And Fixing 50 Mm Dia. Pvc Pasted Type Pipes ( 6 Kg / Cm2 ) For Water Pipe Lines, Including Cutting / Concealing Masonry Walls Or Concrete Floor, Sun Shade Etc Where Ever Found Necessary For Taking Connections Fixing The Pipes To The Walls With Stainless Steel Clamps And St.Screws Including All Cost And Conveyance Of Materials All Specials Such As Bends, Elbows, Sockets 9 9 Supply And Fixing Hdpe 2 Nos. Pre-Fabricated Toilet Supplying And Fixing 25Mm Dia Pvc Pipes ( 10 Kg / Cm2 ) For Water Pipe Lines, Including Cutting / Concealing Masonry Walls Or Concrete Floor, Sun Shade Etc. Where Ever Found Necessary For Taking Connections Fixing The Pipes To The Walls With Stainless Steel Clamps And St.Screws Including All Cost And Conveyance Of Materials All Specials Such As Bends, Elbows, Sockets, Loading Unloading 10 10 Supply And Fixing Hdpe 2 Nos. Pre-Fabricated Toilet Supplying And Sinking For Rcc 1400 Ltr. Capacity Septic Tank ( Size 0.90 M Dia.& 2.50M Length ) Including All Cost And Conveyance Of Materials, Loading And Unloading, All Labour Charges For Necessary Earth Work Excavation, Hire Charges For Tools And Plants Etc. Complete As Per Standard Specification 11 11 Supply And Fixing Hdpe 2 Nos. Pre-Fabricated Toilet Supply & Stacking Isi Mark Best Quality Portland Cement ( Opc / Ppc ) Approved Make In Paper Bag Including All Cost And Conveyance Of Materials, Loading & Unloading Charges, Stacking At Suitable Place For Consuming As And When Require, Etc. Complete As Per Standard Specification ( 12 12 Supply And Fixing Hdpe 2 Nos. Pre-Fabricated Toilet Providing And Fixing Rectangular High Density Polyethylene Water Storage Loft Tank With Cover, Conforming To Isi 12701, Colour Of Opaque White Or Asapproved By Engineer-In- Charge. The Rate Includes Making Necessary Holes For Inlet, Out& Over Flow Pipesincluding All Cost And Conveyance Of Materials Loading Unloading Charges