| 1 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, levelling, sectioning breaking clods etc., in all incidental charges etc., complete as per standard specification . Upto 2 to 3m depth |
| 2 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, levelling, sectioning breaking clods etc., in all incidental charges etc., complete as per standard specification . For Drain |
| 3 | Rates for earthwork Excavation and refilling for Pipeline works having bed width of 1.25m and below on linear Measurement basis etc., in all incidental charges etc., complete as per standard specification . |
| 4 | Road cutting for laying of Pipe lineincluding cost and conveyance of all materials to site including curing etc.,complete as per standard specification |
| 5 | For BT Road |
| 6 | For CC Road |
| 7 | Cement concrete of mix 1:4:8 (One cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. |
| 8 | Brick work in Cement Motor 1:5 using country bricks of size 8 3/4x 41/4x 21/4 including cost and conveyance of all materials to site from approved sources including cost of cement which will be supplied by the contractor own cost of stipulated under special condition, including the conveyance of cement from the departmental saction stores to work site and bandlingcharges for the same at both ends including labour charges for mixing cement mortor including safolding charges extra labour for working in heightsand watering and curing with all leads for good soft potable water and including all other incidental charges etc.complete complying with standard specifications |
| 9 | Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. |
| 10 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). |
| 11 | For Vertical Surfaces |
| 12 | For Drain |
| 13 | RCC Slab Bottom |
| 14 | Plain Cement concrete 1:3:6 (One cement three M-sand six aggregates) mix using 20mm gauge hard granite broken stone jelly for bed blocks including cost and conveyance of materials to site and all labour charges etc complete with standard specification. |
| 15 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) |
| 16 | SupplyingandFabrication of Steel and placing in position MS / Ribbed tor steel Grills for RCC works as per design given including cost of steel and GI binding wire in Floors etc,. Complete complying with standard specification in force - per Quintol |
| 17 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - |
| 18 | Suplying miled steel grills for windows ventilators etc., including priming coat andincluding cost and conveyance of all materials to site including curing etc.,complete as per standard specification |
| 19 | Plastering with C.M 1:5,12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 20 | Painting two coats for Interior surface with approved Interior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. |
| 21 | Towards Supply and fixing of following GI and PVC Pipes and Spls et., complete as per std specifications |
| 22 | 1\" GI Pipe |
| 23 | 3\" dia Flange |
| 24 | 32mm dia GI Pipe |
| 25 | 32mm dia GI Bend |
| 26 | 32mm dia GI Coupling |
| 27 | 32mm dia UPVC Pipe |
| 28 | 32mm dia UPVC Elbow |
| 29 | 100 mm dia UPVC Pipe |
| 30 | 110 mmdia PVC Door Elbow |
| 31 | Supply and Delivery of 15.00 HP Openwell submersible pumpset 1000X80 as per is 14220 / 2002 Without panel board (Equals to Kirloskar) set with ISI marking along with 4.00 sq mm. cable (to 5m lengh) suitable for installation including Transportation charges etc., complete |
| 32 | Supply and delivery of 20.00 HP panel board with starter suitable for above pump set with all accessories as per IE rules with Is specifationect., complete |
| 33 | Labour charges for erection of 15.00 HP Monoblock motor including cost of all charges etc, completeect., complete |
| 34 | Supply and fixing of 32A Three phase 500V 4 Pole Change over Switch on suitable angle iron frame work with MS cable entry boxes with PWD earthing. SD 731 |
| 35 | Supply and run of 4 x 6 sq.mm. (84 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V on 7 / 20 GI bearer wire for service connection mains. SD 68 |
| 36 | PVC insulated and sheathed 3 core flat type 4 Sqmm Copper cable conforming to is 694/1990 and as Amended thereafter et., complete as per std specifications |
| 37 | Supply and fixng of TNEB meter board suitable for 3 phase 100A service connection made up of suitable angle iron frame work of size 2 feet x 1-1/2 feet using angle iron of size 1-1/2\" x 1-1/2\" x 1/4\" rigidly fixed on wall covered with hylem sheet of size 2 feet x 1-1/2 feet of 12mm thickness with necessary bolts and nuts supports and supply and fixing of 3 Nos. 100A fuse units (500V), 1 No. neutral link, copper earth flat of size 1\" x 1/4\" with inter connection of EB meter to fuse units by 16 Sq.mm PVC insulated copper wire with earth connection complete SD 130 |
| 38 | Laying of pipe line including cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification. |
| 39 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 40 | Provision for GST 18% CGST-9%,SGST-9% |