| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete |
| 2 | Providing, Laying, Spreading and Compacting grading aggregates to WET MIX MACADAM Specification in 150mm thick in two layers each layer in 75mm thick including premixing the materials with water at OMC in mechanical mix plant. Cariage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density etc complete |
| 3 | Providing and laying Prime coat over WBM/ WMM surfaceusing 6 kg of Emulsion Bitumen (Slow Setting) per 10sqm for preparatory to another bituminous construction over it. including cost of metarial, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 4 | Providing and laying Tack coat over WBM/ WMM surface(Treated with primer) using 2.50 kg of Emulsion Bitumen (Rapid Setting) per 10sqm for preparatory to another bituminous construction over it. including cost of metarial, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 5 | Providing and laying 50 mm compactedthick dense bituminous macadamusing 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70bitumenfor premixing per 10 sqm including cost and conveyance of all materials toC M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction byVibratory roller tothe required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30tC M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,includingall other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. |
| 6 | Providing and laying Bituminous Concrete to 30mm thickusing 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with45.27 kgs of 60/70bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) andfor premixing per 10 sqmincluding cost and conveyance of all materials toC M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm/ 30mm with mechanical paver to the specified grades and cross sections and compaction byVibratory roller tothe required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30tC M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,includingall other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. |
| 7 | Removal of excavated excess earth away from the site to 2K.M including loading and transporatiobn charges etc., complete as per standard specification |
| 8 | Plain Cement Concrete 1:4:8 (one part of cement, five part of Crushed Stone Sand (M- Sand) and Ten part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification |
| 9 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver oak (C.w) joists of size 10cm X 6.5cm (spaced at about 90cm c/c) and supported by casurina props of 10cm to 13cm dia (spaced at 75 cm c/c) complying with standard specification and as directed (For Drain works) |
| 10 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification |
| 11 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification |
| 12 | GST 18% |