| 1 | Centralized Materialsof following materials as per RESSPO/PuVVNL norms at the work site provided by Store Centar Robertsganj |
| 2 | STP Pole 11 MTR |
| 3 | PCC Pole |
| 4 | X-Arm M.S. Angle 65*65*6mm V Type |
| 5 | 11 KV Pin Insulator |
| 6 | Top Channel M.S.100*50*2240 |
| 7 | Cross Bracing M.S Angle |
| 8 | 11 KV XLPE Cable 3*185 mm |
| 9 | 11 KV Disc Insulator B & S Type |
| 10 | 11 KV Disc Fittings |
| 11 | 11 KV TPMO SWITCH |
| 12 | Cable Jointing Kit Straight Through 11 KV (EV) 185mm |
| 13 | Cable Jointing Kit Indoor/Outdoor |
| 14 | S/S Base |
| 15 | Stay Complete |
| 16 | Earthing Complete |
| 17 | 11 KV PILFER PROOF METERING CUBICLE |
| 18 | 11 KV POLE MOUNTED CT PT UNIT |
| 19 | S/S BASE |
| 20 | Decenterlized Material Provided by Contractor |
| 21 | Barbed Wire |
| 22 | Nut & Bolt |
| 23 | Clamp For STP Pole |
| 24 | Danger Board |
| 25 | F-Bracket |
| 26 | ALLIMINIUM PAINT |
| 27 | E Bracket |
| 28 | Work of following material as per Respo/Puvvnl norms at the work site. |
| 29 | Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work. |
| 30 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 31 | Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 32 | Earthing of Poles |
| 33 | Stringing & sagging of 3x185 sqmm cable on 41 No. STP Pole over head with hanging accessories of Disc Insulator of hook with double circuit of cable.& for Metering |
| 34 | Erection of Sectional Double Pole Structure of STpole including digging of pit, fitting of accessories, back filling of earth, grouting of each pole & stay sets & other required works. |
| 35 | Erection of Sectional Four Pole Structure of STpole including digging of pit, fitting of accessories, back filling of earth, grouting of each pole & stay sets & other required works. |
| 36 | Installation of 11 KV Pilfer proof metering cubicle inside meter room, by fixing rag bolts after checking alignment with trench & conneting incomming & outgoing cable in the CT chamber |
| 37 | Mounting of CT/PT Unit on double pole with using 02 no. S/S Base (M.S. Angle). |
| 38 | Mounting of cross arm with pin insulator and reparing of double pole structor on erected pole on long span and damaged pole. |
| 39 | Installation of 11 KV TPMO With Clamp |
| 40 | Making cable Jointing Kit Straight Through 11 KV (EV) 185mm |
| 41 | Cable Jointing Kit Indoor/Outdoor |
| 42 | Chopping of Tree |