| 1 | Shifting,Assembly, Erection, Testing and Commissioning of6.6KV, VM-12 , BHEL make, Indoor type stand-alone Vacuum Circuit Breakers (VCBs). The VCBs shall be erected on the trenches by providing MS material. The job includes primary injection, secondary injection and testing of relays mounted on VCB panels. Approx. Size: 820(L) x 2355(W) x 2700(H) mmand Wt:1500kgs each. |
| 2 | Shifting, Assembly, Erection, Testing & Commissioning of 5MVA, 11/6.6KV, outdoor, oil immersed,power transformer. The transformer shall be placed on foundation with MS Channel. The transformer is to be shifted with in the factory from storage location to the site. The job includes oil filling, filtration, BDV test, all protection checks and routine test etc as per IS: 2026, connection of oil drain through BHEL free issued MS Pipe and Flange to the nearest soak pit. The approximate weight with oil is 11T and dimensions are 2650x3080x3050 mm & Oil Qty: 2205 litres. |
| 3 | Shifting and erection of commmon base frame for 5MW Motor and Gear Box. |
| 4 | Shifting, erection and alignment of Gear Box on the common base frame for Gear Box and Motor |
| 5 | Shifting, erection and alignment of 6.6KV, 5MW, 3 Phase Induction Motor. The job includes alignment of the motor with gear box up to accuracy of 0.1µm or as desired by the site engineer |
| 6 | Shifting, Assembly, Erection, Testing & Commissioning of 6.6KV, 2500A Isolators. |
| 7 | Shifting, Assembly and Erection of 5MW, 6.6KV VFD panel. The approximate weight is 13 Tons and dimensions are 6145(L) x 1300(D) x 3135(H)mm. The job involves shifting, unpacking, erection of the panels on RCC cable trenches and assembly of various parts of VFD panel. |
| 8 | Shifting, Assembly and Erection of Thyristor Heater Panel. The approximate weight is 5 Tons and dimensions are 2400(L) x 800(D) x 2000(H)mm. Lifting/erection of the panel is to be done only with mobile crane/hydraulic crane not by any other means for safety point of view. |
| 9 | Shifting, Assembly, Erection, Testing and commissioning of 415V MCC panel along with remote control panel.The remote control panel is to be erected in the control room. MCC Panel details: The approximate weight is 5T and dimensions are 5350(L) x 1000(D) x 2175(H)mm. Remote Control Panel details:The approximate weight is 0.1T and dimensions are 1400(L) x 600(D) x 1900(H)mm. |
| 10 | Shifting, Assembly, Erection, Testing and commissioning of 415V LT ACB. The approximate weight is 0.2T and dimensions are 1000(L) x 1300(D) x 2400(H)mm. Lifting/erection of the panel is to be done only with mobile crane not by any other means for safety point of view. |
| 11 | Hiring of hydraulic crane for shifting and laying of old cables. 1 operation = 1 shift |
| 12 | Calibration of the following equipment from any local NABL accredited lab and arranging for calibration certificates:1) (0-800A) Primary injection test kit of make: RE (weight: 100 kgs approx)2) (0-100A) Secondary injection test kit of make: Motwane (weight: 20 Kgs approx)3) 5KV Insulation Resistance tester of make: Megger (weight: 3 Kgs)4) Digital earth meggar of make: Megger (weight: 2 Kgs)5) Digital Earth Clamp Meter of make: Motwane (weight: 1 Kg)6) Digital clamp meter of make: Fluke (Weight: 0.2kg)The job includes arranging for transport to and from the NABL accredited lab from within the factory. The necessary gate passes for entry and exit of vehicles will be arranged by BHEL. |
| 13 | Shifting and laying of the following HT power cables (UE). The job includes, but not limited to, shifting of cable drums from store, opening of trench covers, laying of cable, Dressing & Tagging of the cable, Fixing of free issued trefoil clamps, closing of trench covers after completion of laying for Single Core cable at 1mt interval etc. |
| 14 | i) 1C X 630 sq.mm, 11kV(UE), XLPE Aluminum cable |
| 15 | ii) 1C X 240 sq.mm, 6.6KV (UE), XLPE Copper cable |
| 16 | Removal of existing cable connections from VCB. The job includes opening of VCB cover, disconnection of cable connections, removal of cable connections, downing the cables from the VCBi) 1C X 630 sq.mm, 11kV(UE), XLPE Aluminum cable |
| 17 | Shifting and laying of the following LT Aluminium power cables (UE). The job includes Dressing & Tagging, Fixing of free issued trefoil clamps for Single Core cable at 1mt interval etc. |
| 18 | 1) 1C X 400 sq.mm XLPE insulated armoured cable |
| 19 | 2) 3.5C X 240 sq.mm PVC insulated armoured cable |
| 20 | 3) 3.5C X 35 sq.mm PVC insulated armoured cable |
| 21 | Shifting and laying of the following LT Copper power cables (UE). The job includes Dressing & Tagging, Fixing of free issued trefoil clamps for Single Core cable at 1mt interval etc. |
| 22 | 1) 1C X 300 sq.mm elastomer insulated flexible cable |
| 23 | 2) 4C X 70 sq.mm elastomer insulated flexible cable |
| 24 | 3) 5C X 4 sq.mm PVC insulated armoured cable |
| 25 | Shifting and laying of the following LT Copper control/signal cables (UE). The job includes Dressing & Tagging, Fixing of free issued trefoil clamps for Single Core cable at 1mt interval etc. |
| 26 | 1) 12C X 1.5 sq.mm PVC insulated armoured cable |
| 27 | 2) 12P X 0.5 sq.mm twisted pair PVC insulated Aluminum shielded signal cable |
| 28 | Shifting and execution of end terminations for the following cables. The job includes, but not limited to, making holes of sufficient size in the gland plates, adjusting the cables in the trench, relaying and adjustment of cable for suitable length for facilitating entry into equipment and providing mechanical support for the cables, executing terminations, sealing of cable entry points with wall putty/suitable sealant, tagging of cables. Supply of wall putty for plugging holes in the cable entry and cable tags are in contractor\"s scope. The tools required for the work are in contractors\"s scope. |
| 29 | i) 1C X 630 sq.mm, 11kV(UE), XLPE Aluminum cable |
| 30 | ii) 1C X 240 sq.mm, 6.6KV (UE), XLPE Copper cable |
| 31 | Termination of the following LT Aluminium power cables. The job includes preparation of cable, preparation of gland plate for cable entry, Supply of double compression glands for the armoured cable, supply of cable lugs, execution of terminations and closure of covers and/or plugging of gaps in the cable entry gland plate. Aluminum lug, double compression glands are in the scope of contractor. For XLPE cable, the work also includes removal of semi conductor layer |
| 32 | 1) 1C X 400 sq.mm XLPE insulated armoured cable |
| 33 | 2) 3.5C X 240 sq.mm PVC insulated armoured cable |
| 34 | 3) 3.5C X 35 sq.mm PVC insulated armoured cable |
| 35 | Termination of the following LT Copper power cables. The job includes preparation of cable, preparation of gland plate for cable entry, Supply of double compression glands for the armoured copper cable and polyamide cable gland for elastomeric insulated cable, supply of cable lugs, execution of terminations and closure of covers and/or plugging of gaps in the cable entry gland plate. Copper lug, double compression glands are in the scope of contractor |
| 36 | 1) 1C X 300 sq.mm elastomer insulated flexible cable |
| 37 | 2) 4C X 70 sq.mm elastomer insulated flexible cable |
| 38 | 3) 5C X 4 sq.mm PVC insulated armoured cable |
| 39 | Termination of the following LT Copper control cables. The job includes preparation of cable, preparation of gland plate for cable entry, Supply of double compression glands for the armoured cable, supply of cable lugs, execution of terminations and closure of covers and/or plugging of gaps in the cable entry gland plate. Copper lug, double compression glands are in the scope of contractor |
| 40 | 1) 12C X 1.5 sq.mm PVC insulated armoured cable |
| 41 | 2) 12P X 0.5 sq.mm twisted pair PVC insulated Aluminum shielded signal cable |
| 42 | Shifting, Fabrication and Erection of BHEL free issued structural steel for equipment/cable tray support. |
| 43 | Shifting & Earthing of Equipment from nearest Earth riser with 50x6mm/ 25x3mm GI flat. The job includes supply of Aluminium/Silver paint and painting of welding joints. The earth flats will be free issued by BHEL. |
| 44 | Shifting & Erection of cable tray up to 600mm width of ladder / perforated type. The job includes fabrication of cable tray bends wherever required. The cable tray will be free issued by BHEL. |
| 45 | Supply and Erection of Special Earth Pits for Electronic earthing with 600x600x6mm Tinned copper plate, 50mm dia2600mm long GI pipe with holes of 1/4\" dia at 4\" apart at random & 2nos 25x6, 2600mm long tinned copper flat material as per drawing. The work includes excavation of earth pit, supply of material for alternate layers of charcoal(75kgs), salt(150kgs). |
| 46 | VCB and VFD room Lighting Works |
| 47 | Supply and installation of wiring with 1.5 sq. mm 660 / 1100V grade PVC insulated copper wire multi strand of make Finolex/Rediant/Finecab/Havells/L&T. In PVC pipe of suitable dia (As per IS:732 for wiring points ) with 14 G/1.5sq.mm green colour copper wire for earth continuity. Each light / fan point should be connected to three plate ceiling rose code 39072 of make: Anchor make connector suspended duly with couduit / PVC pipe etc.Each ciruit should not have more than 7 points 700 watts. |
| 48 | Supply and installation of wiring with 2.5 sq. mm PVC insulated copper wire multistrand of make Finolex/Rediant/Finecab/Havells/L&T.The wiring point for 20/16 A. power socket including 14 G./2.5sq.mm green colour copper wirefor earth continuity. Independent circuit for each socket from power MCB distribution board (As per IS:732 for wiring point) Testing and commissioning. The wiring should not be mixed with lighting pipe wiring and it should be run separately in the room/ shed at a height of 2 feet from ground leavel or as per the site engineers instruction. |
| 49 | Supply and fixing of 10 Amps 250 V SP switches for control of light fitting and fans with Roma Type code : 21011 of Anchor make .Fixed on a suitable modular type concealed box with suitable top cover. Testing & commissioning. |
| 50 | Supply and fixing of 3pin, 250 V, 5/10 Amps power socket cum switch with indication Roma type code 21113 and 21077 of Anchor make. Fixed on suitable modular type concealed box top cover.Testing & commissioning. |
| 51 | Supply and fixing of 3pin, 250 V, 10/25 Amps power socket cum switch with indication Roma type code 34374 and 22014 of Anchor make. Fixed on suitable modular type concealed box top cover. Testing & commissioning. |
| 52 | Supply and fixing of 25A, 250V box type, flush mounting double pole MCB and heavy duty plug & socket of Anchor ROMA make Ref. No. Item code: 98488. The job includes supply of plug top,suitable modular type concealed box for fixing the MCBs with suitable top cover for Air Conditioner. |
| 53 | Supply and Installation of 8-way double door MCB DB with TPN 415V,consisting of 10 to 20A -- 8nos MCBs on each phase i.e., a total of 24 Nos of MCBs , sheet enclosed, dust & vermin proof. Model no: 8GB32202RC08 of SIEMENS/Equivalent model of L&T/ABB/STANDARD/LEGRAND MAKE along with controlling 63A TPN MCB. It is to be fixed on a neatly fabricated steel frame and mounted on to walls or as required for lighting distribution.The job includes painting of steel frames, labelling / writing the connection chart inside the door with WHITE duco paint as required, double earthing, testing & commissioning. |
| 54 | Shifting, installing, Testing and commissioning of BHEL free issued Double LED Tube light fittings. Supply of 3C X 1.5 sq.mm of approx. length 1 mtr cable for connection from ceiling rose to the fitting and downrod is in the scope of the contractor. |
| 55 | Supply and Erection of Earth pits for Equipment body earthing with 65mm dia GI pipe Medium (class-B), strictly as per IS: 3043, 3000mm long with holes of 12mm dia at 150mm apart at random & 50x6x260mm MS Earthing plate welded to pipe as per drawing.The work includes supply of material for alternate layers of charcoal (75kgs), salt (150kgs). Contractor shall dig 300mm depth and 200mm width trench in the soil for laying the earth flat from earth pit electrode to earth mat/equipment. |
| 56 | Supply, Shifting, installing, Testing and commissioning of 1400mm Sweep Ceiling Fans. Supply of fan regulator along with relevant modular box and plate and approximately 1mtr of 3C X 1.5 sq.mm cable for connection from ceiling rose to the fanis in the scope of the contractor. Suitable downrods, fan clamps and fan box that is to be fixed in the ceiling are in the scope of contractorModel of the fan: XP-390, Havells make/Equivalent model of Bajaj/Crompton Greaves/Orient/Surya Roshni/KhaitanModel of regulator: Anchor Roma Classic, code: 22546 |
| 57 | Supply and fixing of PVC Piping for Electrical wiring, Telephone wiring and LAN wiring. The job includes supply of adequate number of Pipe Bends, Four-way/Three-way/Two-way Junction Boxes with End Cover etc.a) 25mm (1\") dia PVC pipes 1.5mm thick, Make: Sudhakar Pipes/Anchor/Precision |
| 58 | Supply of modular AC box with 20A SP MCB with plastic enclosure & unbreakable heavy duty plug top with ISI marking. Make: Anchor, code: 98488 |
| 59 | Shifting and fixing of modular AC box with 20A SP MCB with plastic enclosure & unbreakable heavy duty plug top with ISI marking. |
| 60 | Shifting, installing, Testing and commissioning of BHEL free issued 1.5T Air conditioners. The job includes supply of 4KVA Stabilizer of Voltas/V-Guard make, supply of stand for fixing outdoor unit, extra copper pipe and copper wire 3CX2.5 sq.mm of length 2mts each and 1.5m Drain Pipe |
| 61 | Filtration of oil, arresting leakages of oil, supply and replacement of silica gel breather, modification of cable connections in existing 2000KVA Transformer. The job includes, but not limited to, supply of filtration machine, arresting of oil leakages, supply andreplacement of 1KG silica gel crystals, opening of cable boxes on HT side for modification of connections, modification of connections, refixing of cable box, providing mechanical support using BHEL free issued structural steel.Quantity of oil: 1005 litres |
| 62 | Unpacking and disassembly of VCBs for shifting inside the substation. The job includes removal of packing, removing covers, disconnecting interconnecting busbars and removal of VCB trucks. |
| 63 | Supply of end termination kits for 1C X 240 sq.mm, 6.6KV (UE), Elastomeric insulated copper flexible cable. Make: Raychem/3M |
| 64 | Supply and fixing of Polyethylene Earth Pit Chamber covers |
| 65 | Shifting, Erection, Testing and commissioning of 30V DC, 100AH Battery along with Battery charger. The job includes assembly of battery cells, battery charger |