| 1 | Geophysical Investigation charges |
| 2 | Drilling of 180mm dia. Deep bore well in hard rock area including labour charges & transportation Charges |
| 3 | Drilling of 150mm dia. Deep bore well in hard rock area including labour charges & transportation Charges |
| 4 | Supply & Delivery of 180mm dia P.V.C 6 kg/cm2 casing pipe including cost and conveyance of all materials all Labour charges for inserting casing pipes assembly (With slot or without slot) in the drilled hole including the joint etc., complete and supplying and packing the annular space with pebbles of size and quality as approved by theEngineer |
| 5 | Supply and delivery of submercible pump setbore wellsuttable 50lpm X60 m headincluding all materials and all labour charges etc |
| 6 | Supply and delivery of 1.50 HP suttable Panael Boardwith accesseries including all materials and all labour charges etc |
| 7 | Supply and delivery of 2.50 sqm 3 core coppar cable including all materials and all labour charges etc |
| 8 | Supply and delivery of 32 mm UPSC pipeincluding all materials and all labour charges etc |
| 9 | Supply and delivery of MS Kiosk of size 0.75m x 0.45m x 0.75m made up of MS angle of size 50mm x 50mmx 4mm alround covered with 16 gauge MS sheet and kiosk door made up of MS plates of size 25 mm x 3 mm including cutting, welding, grinding, locking arrangements and labour charges etc., |
| 10 | Supply and delivery and fixing of HDPE tank as per IS 12701 / 1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges etc., |
| 11 | Errection of Submercble motar specials in the trenchand layingto proper graed and alignment and as Technical officers |
| 12 | Supply and delivery of40mm pvc pipe including all materials and all labour charges etc |
| 13 | Supply and delivery of32mm GIpipe including all materials and all labour charges etc |
| 14 | RefillingexcatedEarth laying ofpipesfor |
| 15 | Earthwork Excavation in all classes of soil consisting of Hard stiff clay including all labor charges for foundation as per SS20B etc complete. |
| 16 | PCC 1:4:8 mix using 40m HBG ISS metal including cost and conveyance of all materialsall labour charges |
| 17 | Brick work with cement mortar 1:5 mix usingcountry bricks of size 83/4\"x41/4\"x23/4\" forfoundation and basement and superstructureinculding cost and conveyance of all materialescuring etc ,complete |
| 18 | Refilling the basement with excavated earthother than sandcomplying the Standard specification |
| 19 | Plastering with cm 1:5 mix, 12mm thick including cost, conveyance of all materials labour charges and allother incidental charges therefore etc |
| 20 | Dadooing walls withGlazed tiles of sizes 305mm X200mm X 6mm size of approved make and quality and colour l Set in cement mortar 1:2 (one cement ,two sand) over 10 mm base layer plastering and pointing with white cement neatly as directed. |
| 21 | Wiring with 2X1.5 sqmm (22/0.3/) PVC insulated Sc Unsheathed Cu conductor of 1100 V grade in suitable PVC rigid pipe on wall or ceiling with PVC accessories and with TW switch box and 5 A F.T. switch with painting of suitable colour for open PVC light point/ fan point SD 20 |
| 22 | Supply run of 2 of 1.50 sqmm 56/0.3PVC insulated Sc Unsheathed Cu conductor of 1100 V grade on 7/20 GI bearer wire for service connection main |
| 23 | Supply run of 2 of 1.50 sqmm (56/0.3)PVC insulated Sc Unsheathed Cu conductor of 1100 V grade in 25 mmdia GI pipe suitably bent at both ends with necessary angle iron upright and end supports for main |
| 24 | Supply and fixing of CFL bracket with Twin box type Street light fitting complete with electronic ballast with all accessories |
| 25 | Supply and fixing of TNEB meter Board suitable for 32A Three Phase service connection with 3 Nos. 32A Fuse unit (500V) 32A neutral link and earth link (1\" x 1/8\" Copper flat) on TW plank of size 600mm x 450mm x 19mm with supporting TW reepers of 1\" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit |
| 26 | Supply and fixing of 16 Amps DP Switch of 500V with metal clad with fuse and neutral (Side Handle) on suitable TW Board with PWD Earthing |