|
| 1 | Part A : Various Electrical Maintenance Jobs |
| 2 | Preventive Maint of Motor =15kW |
| 3 | Preventive Maint of Motor 15kW< to =30KW |
| 4 | Preventive Maint of Motor30kW< to =100KW |
| 5 | Preventive Maint of Motor100kW< to =300k |
| 6 | PM OF 11KV Motor rating=1000kW |
| 7 | PM OF11KV Motor rating 1000kW |
| 8 | BREAKDOWN Maint Motor rating =15kW |
| 9 | BREAKDOWN Maint Motor rating15kW |
| 10 | BREAKDOWN Maint Motor 30kW |
| 11 | BREAKDOWN Maint Motor 100kW< to =300KW |
| 12 | INSTALLATION/REMOVAL Motor up to =15kW |
| 13 | INSTALLATION/REMOVAL Motor 15kW< to =30K |
| 14 | INSTALLATION/REMOVAL Motor 30kW |
| 15 | INSTALLATION/REMOVAL Motor100kW |
| 16 | INSTALLTION/REMOVAL of 11KV motor=1000KW |
| 17 | INSTALL/REMOV 11KV motor1000kW |
| 18 | Instal/Removal of MV Motor =500kW |
| 19 | Insta/Removal of MV Mtr 500kW |
| 20 | SHIFTING OF Motor/PNL/EQP. beyond 100 kg |
| 21 | SHIFTING OF Motor/PNL/EQP.Wt.500KG-3MT |
| 22 | SHIFTING OF Motor/PNL/EQP. More than 3MT |
| 23 | MAINTENANCE OF MV Motor =500kW |
| 24 | MAINT of 3.3KV Motor 500kW |
| 25 | Bearing Replacementof Motor=1.5kW |
| 26 | Bearing Rplcmnt of Motor 1.5< to = 7.5kW |
| 27 | Bearing Rplcmnt of Motor 7.5 < to = 30kW |
| 28 | Bearing Rplcmnt of Motor 30 < to = 45kW |
| 29 | Bearing Rplcmnt of Motor 45 < to = 75kW |
| 30 | Bearing Rplcmnt of Motor 75< to = 90kW |
| 31 | Bearing Rplcmnt of Motor 90 < to = 200kW |
| 32 | Bearing Rplcmnt of Motor 200 |
| 33 | Bearing Rplcmnt of Motor 500kW |
| 34 | Greasing of Motor 30kW < to = 45kW |
| 35 | Greasing of Motor45kW < to = 75kW |
| 36 | Greasing of Motor 75kW < to = 90kW |
| 37 | Greasing of Motor90kW < to = 200kW |
| 38 | GREASING of 3.3 KV MV Motors |
| 39 | GREASING of 11kV Motors |
| 40 | PM of Generator System |
| 41 | PM of Generator Excitation System |
| 42 | PM of Generatorsystem Control Panel |
| 43 | Gen Shaft earth maint & shaft V Msrmnt |
| 44 | Maintenance of Generator LAVT |
| 45 | PM Generator NGT system |
| 46 | Remove,terminate Pwr&Ctrl Cable LT Mtr |
| 47 | Maintenance of 11KV Switchboard panels |
| 48 | PM of 11KV Vacuum circuit breaker |
| 49 | Maintenance of 3.3KV SWITCHBOARD PANELS |
| 50 | PM of 3.3KV Vacuum circuit breaker |
| 51 | Maintenance of 415V LT Switchboard Panel |
| 52 | PM of 415V Air Circuit breakers (ACB) |
| 53 | Maintenance of MCC Pnls rating up to=32A |
| 54 | Maintenance of MCC Pnls 32A |
| 55 | Maintenance of MCC Pnls63A |
| 56 | Maintenance of MCC Pnls 125A |
| 57 | Maintenance of MCC Pnls 250A |
| 58 | Maintenance of MCC Pnls 400A |
| 59 | EREC & COMM OF FEEDER PILLER,250AMPS |
| 60 | EREC & COMM OF FEEDER PILLER,125AMPS |
| 61 | EREC & COMM OF FEEDER PILLER,63Amps |
| 62 | CAB.LAY-UNDER GROUND <= 21.5 MM OD |
| 63 | LT cable LAY under ground 22 to 50MM OD |
| 64 | LT cable LAY under ground 51 to 100MM OD |
| 65 | Cable Laying above Ground<=21.5MM OD |
| 66 | Cable Laying above Ground 22.5To50MM OD |
| 67 | Cable Laying above Ground 51 To 100MM OD |
| 68 | Cable Laying above Ground>100MM OD |
| 69 | Temporary cable laying OD upto 35 MM |
| 70 | Temporary cable laying OD > 35 MM- 55 MM |
| 71 | Temporary cable laying OD >55 MM - 75 MM |
| 72 | Temporary cable laying OD > 75 MM |
| 73 | Fabric &Erect CableTrayLaying>100to150mm |
| 74 | Fabric&Erect CableTrayLaying 150to250MM |
| 75 | Fabric&Erect CableTrayLaying>250 to450MM |
| 76 | Fabric&Erect CableTrayLaying Upto 100MM |
| 77 | Fabric&Erect CableTrayLaying >450to600mm |
| 78 | Fabric&Erect CableTrayLaying >600to750mm |
| 79 | Fabric&Erect LAD Tray Bend >600UPTO750MM |
| 80 | Fabric&Erect LAD Tray Bend >450UPTO600MM |
| 81 | Fabric&Erect LAD Tray Bend >150UPTO250MM |
| 82 | Fabric&Erect LAD Tray Bend>100UPTO150MM |
| 83 | Fabric&Erect LAD Tray Bend>75UPTO100MM |
| 84 | Fabric&Erect LAD Tray Bend UPTO 75MM |
| 85 | Excavation of earth for cable laying |
| 86 | BACK FILLING EXCAVATED EARTH |
| 87 | PVC/HDPE Pipe Laying F/cable<=75MM DIA |
| 88 | PVC/HDPE Pipe LayingF/cable>75To150MMDIA |
| 89 | PVC/HDPE Pipe Laying F/cable >150MM DIA |
| 90 | 50 mm dia GI Pipe Laying |
| 91 | 100 mm dia GI Pipe Laying |
| 92 | 150 mm dia GI Pipe Laying |
| 93 | Supply & Fixing of GI Route Marker |
| 94 | INSTAL LT/HT CABLE ROUTE MARKER |
| 95 | End termination 3x2.5 sqmm cables Cu lug |
| 96 | End Termination 5x2.5 sqmm cables Cu lug |
| 97 | End Termination 7 x2.5 sqmm Cu lugs |
| 98 | End Termination10 x 2.5 sqmm Cu lugs |
| 99 | End Termination 12 x 2.5 sqmm Cu lugs |
| 100 | End Termination 14 x 2.5 sqmm Cu lugs |
| 101 | End Termination 16 x 2.5 sqmm Cu lugs |
| 102 | End Termination 19 x 2.5 sqmm Cu lugs |
| 103 | End Termination 3-1/2 x 25 sqmm |
| 104 | End Termination 3-1/2 x 35 sqmm |
| 105 | End Termination 3-1/2 x 50 sqmm |
| 106 | End Termination 3-1/2 x 70 sqmm |
| 107 | End Termination 3-1/2 x 95 sqmm |
| 108 | End Termination 3-1/2 x 120 sqmm |
| 109 | End Termination 3-1/2 x 150 sqmm |
| 110 | End Termination 3-1/2 x 185 sqmm |
| 111 | End Termination 3-1/2 x 240 sqmm |
| 112 | End Termination 3-1/2 x 300 sqmm |
| 113 | End Termination 3-1/2 x 400 sqmm |
| 114 | End Termination AL 3 X 4 Sqmm |
| 115 | End Termination AL 3 X 6 Sqmm |
| 116 | End Termination AL 3 x 10 sqmm |
| 117 | End Termination AL 3 x 16 sqmm |
| 118 | End Termination AL 3 x 25 sqmm |
| 119 | End Termination AL 3 x 35 sqmm |
| 120 | End Termination AL 3 x 50 sqmm |
| 121 | End Termination AL 3 x 70 sqmm |
| 122 | End Termination AL 3 x 95 sqmm |
| 123 | End Termination AL 3 x 120 sqmm |
| 124 | End Termination AL 3 x 150 sqmm |
| 125 | End Termination AL 3 x 185 sqmm |
| 126 | End Termination AL 3 x 225 sqmm |
| 127 | End Termination AL 3 x 240 sqmm |
| 128 | End Termination AL 3 x 300 sqmm |
| 129 | End Termination AL 3 x 400 sqmm |
| 130 | End Termination AL 4 X 4 Sqmm |
| 131 | End Termination AL 4 X 6 Sqmm |
| 132 | End Termination AL 4 x 10 sqmm |
| 133 | End Termination AL 4 x 16 sqmm |
| 134 | End Termination AL 4 x 25 sqmm |
| 135 | End Termination AL 4 x 35 sqmm |
| 136 | End Termination AL 4 x 50 sqmm |
| 137 | End Termination Cu 3 x 2.5 sqmm cables |
| 138 | End Termination Cu 5 x 2.5 sqmm cables |
| 139 | End Termination Cu 7 x 2.5 sqmm cables |
| 140 | End Termination Cu 10 x 2.5 sqmm cables |
| 141 | End Termination Cu 12 x 2.5 sqmm cable |
| 142 | End Termination Cu14 x 2.5 sqmm cables |
| 143 | End Termination Cu 16 x 2.5 sqmm cables |
| 144 | End Termination Cu 19 x 2.5 sqmm cables |
| 145 | End Termination Cu 3-1/2 x 25 sqmm cable |
| 146 | End Termination Cu 3-1/2 x 35 sqmm cable |
| 147 | End Termination Cu 3-1/2 x 50 sqmm cable |
| 148 | End Termination Cu 3-1/2 x 70 sqmm cable |
| 149 | End Termination Cu 3-1/2 x 95 sqmm cable |
| 150 | End Termination Cu 3-1/2 x120 sqmm cable |
| 151 | End Termination Cu 3-1/2 x150 sqmm cable |
| 152 | End Termination Cu 3-1/2 x185 sqmm cable |
| 153 | End Termination Cu 3-1/2 x225 sqmm cable |
| 154 | End Termination Cu 3-1/2 x240 sqmm cable |
| 155 | End Termination Cu 3-1/2 x300 sqmm cable |
| 156 | End Termination Cu 3-1/2 x400 sqmm cable |
| 157 | LT Straight through joint3/3.5/4x6 sqmm |
| 158 | LT Straight through joint3/3.5/4x10 sqmm |
| 159 | LT Straight through joint3/3.5/4 x16sqmm |
| 160 | LT Straight through joint3/3.5/4x25 sqmm |
| 161 | LT Straight through joint3/3.5/4x35 sqmm |
| 162 | LT Straight through joint 3/3.5/4x50sqmm |
| 163 | LT Straight through joint3/3.5/4x70 sqmm |
| 164 | LT Straight through joint3/3.5/4x95 sqmm |
| 165 | LT Straight through joint3/3.5/4x120sqmm |
| 166 | LT Straight through joint3/3.5/4x150sqmm |
| 167 | LT Straight through joint3/3.5/4x185sqmm |
| 168 | LT Straight through joint3/3.5/4x225sqmm |
| 169 | LT Straight through joint3/3.5/4x240sqmm |
| 170 | LT Straight through joint3/3.5/4x300sqmm |
| 171 | LT Straight through joint3/3.5/4x400sqmm |
| 172 | LT Straight through joint3/3.5/4x6 sqmm |
| 173 | LT Straight through joint3/3.5/4 x10sqmm |
| 174 | LT Straight through joint3/3.5/4x16 sqmm |
| 175 | LT Straight through joint3/3.5/4x25 sqmm |
| 176 | LT Straight through joint3/3.5/4x35 sqmm |
| 177 | LT Straight through joint3/3.5/4x50 sqmm |
| 178 | LT Straight through joint3/3.5/4x70 sqmm |
| 179 | LT Straight through joint3/3.5 /4x95sqmm |
| 180 | LT Straight through joint3/3.5/4x120sqmm |
| 181 | LT Straight through joint3/3.5/4x150sqmm |
| 182 | LT Straight through joint3/3.5/4x185sqmm |
| 183 | LT Straight through joint3/3.5/4x225sqmm |
| 184 | LT Straight through joint3/3.5/4x240sqmm |
| 185 | LT Straight through joint3/3.5/4x300sqmm |
| 186 | LT Straight through joint3/3.5/4x400sqmm |
| 187 | 11KV HT Straight through joint3x185 sqmm |
| 188 | 11KV HT Straight through joint3x240 sqmm |
| 189 | 11KV HT Straight through joint3x300 sqmm |
| 190 | 11KV HT Straight through joint3x400 sqmm |
| 191 | 11KV HT Straight through joint1x500 sqmm |
| 192 | 3.3KV HT Straight through joint3x185sqmm |
| 193 | 3.3KV HT Straight through joint3x240sqmm |
| 194 | 3.3KV HT Straight through joint3x300sqmm |
| 195 | 11KV HT End Termination 3x150sqmm |
| 196 | 11KV HT End Termination 3x185sqmm |
| 197 | 11KV HT End Termination 3x240sqmm |
| 198 | 11KV HT End Termination 3x300 sqmm |
| 199 | 11KV HT End Termination 3x400 sqmm |
| 200 | 11KV HT End Termination 1x500 sqmm |
| 201 | 11KV HT End Termination 3x150 sqmm |
| 202 | 11KV HT End Termination 3x185 sqmm |
| 203 | 11KV HT End Termination 3x240 sqmm |
| 204 | 11KV HT End Termination 3x400 sqmm |
| 205 | 11KV HT End Termination 1 x 500 sqmm |
| 206 | 6.6/3.3KV HT End Termination 3 x150 sqmm |
| 207 | 6.6/3.3KV HT End Termination 3 x185 sqmm |
| 208 | 6.6/3.3KV HT End Termination 3 x240 sqmm |
| 209 | 6.6/3.3KV HT End Termination 3 x300 sqmm |
| 210 | 6.6/3.3KV HT End Termination 3 x400 sqmm |
| 211 | 11KV HT straight through 3 x150 sqmm |
| 212 | 11KV HT straight through 3 x185 sqmm |
| 213 | 11KV HT straight through 3 x240 sqmm |
| 214 | 11KV HT straight through 3 x 300 sqmm |
| 215 | 11KV HT straight through 3 x 400 sqmm |
| 216 | 11KV HT straight through 1 x 500 sqmm |
| 217 | 3.3KV HT straight through 3 x 150 sqmm |
| 218 | 3.3KV HT straight through 3 x 185 sqmm |
| 219 | 3.3KV HT straight through 3 x 240 sqmm |
| 220 | 3.3KV HT straight through 3 x 300 sqmm |
| 221 | 3.3KV HT End termination 3 x 150 sqmm |
| 222 | 3.3KV HT End termination 3 x 185 sqmm |
| 223 | 3.3KV HT End termination 3 x 240 sqmm |
| 224 | 3.3KV HT End termination 3 x 300 sqmm |
| 225 | 11KV HT End termination 3 x 150 sqmm |
| 226 | 11KV HT End termination 3 x 185 sqmm |
| 227 | 11KV HT End termination 3 x 240 sqmm |
| 228 | 11KV HT End termination 3 x 300 sqmm |
| 229 | 11KV HT End termination 3 x 400 sqmm |
| 230 | 11KV HT End termination 1 x 500 sqmm |
| 231 | Providing Cu lug of 1.5 sqmm |
| 232 | Providing Cu lug of2.5 sqmm |
| 233 | Providing Cu lug of4 sqmm |
| 234 | Providing Cu lug of6 sqmm |
| 235 | Providing Cu lug of10 sqmm |
| 236 | Providing Cu lug of16 sqmm |
| 237 | Providing Cu lug of 20 sqmm |
| 238 | Providing Cu lug of25 sqmm |
| 239 | Providing Cu lug of35 sqmm |
| 240 | Providing Cu lug of50 sqmm |
| 241 | Providing Cu lug of70 sqmm |
| 242 | Providing Cu lug of95 sqmm |
| 243 | Providing Al lug of6 sqmm |
| 244 | Providing Al lug of10 sqmm |
| 245 | Providing Al lug of16 sqmm |
| 246 | Providing Al lug of25 sqmm |
| 247 | Providing Al lug of35 sqmm |
| 248 | Providing Al lug of 50 sqmm |
| 249 | Providing Al lug of 70 sqmm |
| 250 | Providing Al lug of 95 sqmm |
| 251 | Providing Al lug of 120 sqmm |
| 252 | Providing Al lug of 150 sqmm |
| 253 | Providing Al lug of 185 sqmm |
| 254 | Providing Al lug of 240 sqmm |
| 255 | Providing Al lug of 300 sqmm |
| 256 | Providing Al lug of 400 sqmm |
| 257 | Providing Al lug of 500 sqmm |
| 258 | Providing cable glands 10.0 to 16.0 mm |
| 259 | Providing cable glands 16.5 to 18.0 mm |
| 260 | Providing cable glands 18.5 to 20.0 mm |
| 261 | Providing cable glands20.5 to 23.0 mm |
| 262 | Providing cable glands 23.5 to 26.0 mm |
| 263 | Providing cable glands26.5 to 30.0 mm |
| 264 | Providing cable glands30.5 to 33.0 mm |
| 265 | Providing cable glands33.5 to 37.0 mm |
| 266 | Providing cable glands37.5 to 41.0 mm |
| 267 | Providing cable glands41.5 to 46.0 mm |
| 268 | Providing cable glands46.5 to 52.0 mm |
| 269 | Providing cable glands52.5 to 60.0 mm |
| 270 | CT/PT replacement in 11KV HT Switchboard |
| 271 | CT/PT replacement in 3.3KV MVSwitchboard |
| 272 | CT/PT replacement in 415V LT Switchboard |
| 273 | Providing earthing with GI strip75X10 MM |
| 274 | Providing earthing with GI strip 75 X5MM |
| 275 | Providing earthing with GI strip 50 X6MM |
| 276 | Providing earthing with GI strip 40X 5MM |
| 277 | Providing earthing with GI strip 25 X5MM |
| 278 | Remove & terminate pwr & ctrl HT cable |
| 279 | Earthing 50 X 5 MM COPPER STRIP |
| 280 | 6 SWG Earthingwithbare GIwire |
| 281 | 8 SWG Earthingwithbare GIwire |
| 282 | 10 SWG Earthingwithbare GIwire |
| 283 | 6 MM EarthingwithGIwirerope |
| 284 | 10 MM EarthingwithGIwirerope |
| 285 | Earthing strt light poles withGI pipe |
| 286 | 64 kg charcoal and 5 kg salt |
| 287 | PROVIDING AND FIXING OF GI WIRE |
| 288 | SUPPLY & FIXING OF CU STRIP EARTH BUS |
| 289 | Earth Pit value checking |
| 290 | Maintenance of Earth Pit |
| 291 | INSTALLATION OF EARTH PITS AS PER IS3043 |
| 292 | SF6 gas fillingin Breaker. |
| 293 | Tightness Clmp,Jmpr,strctr,bolts syrd |
| 294 | Attending oil leakage for CT, CVT syrd |
| 295 | Replacement CT/PT/ LA/ BPI/ syrd |
| 296 | Replacement of Breaker pole |
| 297 | Cleaning of grass Syd. |
| 298 | PM of Relay Pnl/Mtrng Pnl/RTCCSyd |
| 299 | Shutdown maint. syrd equipment |
| 300 | Maintenance of OLTC of Transformer |
| 301 | Lighting arrester maint. 132KV syrd |
| 302 | Rmvl and reconction of Trf bushing jmpr |
| 303 | Rmvl and reconction of Trf LV Side Cable |
| 304 | FILTRATION OF TRANSFORMER OIL: |
| 305 | Attend oil leak/filling/Filter TRF oil |
| 306 | PM/Replace buch/prv/mog/osr/temp gugTRF |
| 307 | Breather maint/replacement of TRF |
| 308 | maint. of Transformer |
| 309 | PM of Lighting transformer |
| 310 | PM Ele Hoist/Crane upto 3Ton |
| 311 | PM Ele Hoist/Crane upto 3#10Ton |
| 312 | PM Ele Hoist/Crane upto 10#15Ton |
| 313 | PM Ele Hoist/Crane upto 30Ton and above |
| 314 | PM of Distribution Board 115/240V ACDB |
| 315 | PM of Distribution Board 220V DCDB |
| 316 | PM of Distribution Board 415V MLDB |
| 317 | PM of feeder pillar box |
| 318 | PM ofwelding receptacle |
| 319 | Extra manday unforeseen jobs Electrician |
| 320 | Extra manday unforeseen jobs Helper |
| 321 | Extra manday unforsn jobs Rigger |
| 322 | Extra manday unforsn job Fitr/Cutr/Grndr |
| 323 | Laying & Termination Telephone CAB-05P |
| 324 | Laying & Termination Telephone CAB-20P |
| 325 | Telephone installation/Removal |
| 326 | FO cable laying |
| 327 | FO cable termination/Splicing/Testing |
| 328 | LHS cable Laying for Fire Systems |
| 329 | Capacitor bank Maintenance |
| 330 | PM of Variable frequency drive |
| 331 | TEMP CONN.HYDROJETTING M/C.UPTO 200 KW |
| 332 | MONSOON PROT LCS/ GEARBOX/O/L>20-63A |
| 333 | Moonsoon Protn-Exd type power socket |
| 334 | Monsoon Protn-Exd type Light DB |
| 335 | Monsoon protection light JB |
| 336 | Monsoon protection Indust.Light DB |
| 337 | Monsoon protection indust.power socket |
| 338 | CHECK & RECTI.OF LIGHT CIRCUIT NON-HAZ |
| 339 | Check & Recti. of light circuit HAz-Area |
| 340 | Replace of LED/GLS/Floodlight/lamp/Fixtu |
| 341 | Replace LED/DC/GLSlamps Upto100W Fitting |
| 342 | Replace of 20/36/40/80W LED/fluor Tubes |
| 343 | Install LED/HPMV/HPSV/MS/LPS light fixt. |
| 344 | Repl of louver/Diffuser for LED/Fluo Fix |
| 345 | Install of High/M bay LED/Flu T-fixture |
| 346 | Repl of Cond/Starter/High/Medi bay fixtu |
| 347 | Removal of high/medium bay fixture |
| 348 | Replacement of Choke/Ballast/Tube fixtur |
| 349 | Replacement of CeilingFan Pin/RubberBush |
| 350 | Replace ofMis item-ceiling rose/holder |
| 351 | Repl of starter holder/lamp holder |
| 352 | Repl of protective cover for fittings |
| 353 | Replacement of Toggle switch |
| 354 | Repl of wiring of light/Point upto 6SQMM |
| 355 | Install of ELCB/MCB with connection |
| 356 | Removal of ELCB/MCB with connection |
| 357 | Install of timer/Selector switch |
| 358 | Install of Decorative lamp |
| 359 | Wiring using CSNG&CPNG/RIGID PVC CNDT |
| 360 | Install of flexible conduit (PVC) |
| 361 | Wiring using metallic Conduit |
| 362 | Removal of casing capping/Rigid conduit |
| 363 | Removal of Timer/Selector switch |
| 364 | Removal of ceiling fancomplte & wire |
| 365 | Removal of High Bay Fixture |
| 366 | Removal of Lighting Fixtures |
| 367 | Installation of Tube Light Fixture |
| 368 | REMOVAL OF EXHAUST FAN |
| 369 | Removal of Air circulator |
| 370 | Replace/Installation of MCB box |
| 371 | Removal of ceiling/wall mounted Fan |
| 372 | CONCEALED WIRING WITH 2.5 MM2 PVC WIRE |
| 373 | Installation of ceiling/wall mount fan |
| 374 | Installation of air circulator |
| 375 | Install of Exhaust fan with wall opening |
| 376 | Relpace/Install of 5/6A Swit/Sock/Plug |
| 377 | Replace/Install of16/32/63ASwit/sock/Plu |
| 378 | Replacement/Installation of timers |
| 379 | Making wall opening for exhaust fan |
| 380 | Installation of 1Ph energy Meter |
| 381 | Install&Wiring of1-Ph voltage stabilizer |
| 382 | Installation of 3-Ph energy Meter |
| 383 | Installation of Anchor fastners |
| 384 | Install of 3PH-E switch/welding socket |
| 385 | Replace of TPN isolator Non-MCB,125Amps |
| 386 | Replace of TPN isolator Non-MCB,63Amps |
| 387 | Replacement of TPN isolator MCB type |
| 388 | Installation of Power distribution board |
| 389 | Install of rod/spike type lightning cond |
| 390 | Install of Ind.Typ Push button STN-NFLP |
| 391 | Install of Ind.Typ Push button STN-FLP |
| 392 | Temporary conn of dewatering pump |
| 393 | Replac of TPN isolator Non-MCB,250 Amps |
| 394 | Replac of TPN isolator Non-MCB,400 Amps |
| 395 | Replac of TPN isolator Non-MCB,630 Amps |
| 396 | REM of Indust.Typ Push button STN-FLP |
| 397 | REM of Indust.Typ Push button STN-NFLP |
| 398 | Remove temp.connect of dewatering pump |
| 399 | dewatering of cable trench/Pit |
| 400 | INS.INT JN BOX>400X400&<600X600MM NFP/FP |
| 401 | INST.INTJNBox>200x200& <400x400MM NFP/FP |
| 402 | INST interm JN Box<=200x200MM NFP/FP |
| 403 | PM of FLP TPN welding socket upto 63Amps |
| 404 | PM of NFLP TPN welding socket upto 63Amp |
| 405 | INSTL-FUSE BASE WITH TOP 16 AMPS |
| 406 | INSTL-FUSE BASE WITH TOP 32 AMPS |
| 407 | INSTL-FUSE BASE WITH TOP 63 AMPS |
| 408 | INSTALLATION OF MCP |
| 409 | INST 3/6KEY LOUDOPH POINTS |
| 410 | INST.SMOKE/HEAT DETECTOR |
| 411 | TESTING OF MCP FOR HEALTHINESS |
| 412 | INST OF LOCAL CONTROL STATION |
| 413 | INST-CHECKER PLATE FOR COVER TRENC |
| 414 | ARTISTIC LETTER / PAINTING BOARDS |
| 415 | letter writing:single letter of 1in size |
| 416 | letter writing:single letter of 2in size |
| 417 | letter writing:single letter of 3in size |
| 418 | Cutting in running meters |
| 419 | Welding in running meters |
| 420 | Part B : Supply of contract Manpower |
| 421 | Service charge for unskill manpower |
| 422 | Service charge for skill manpower |
| 423 | Service charge for semi skill manpower |
| 424 | Service charge for highly skill manpower |