| 1 | MP FUND WATER BODY |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil,wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may bedirectedexceptinhardrockrequiring blastinginclusive of shoring shuttering, ,and baling out water and cleaning and levelling the site etc.,complete 10 m3 |
| 3 | Supplying and filling in foundation andbasement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification. |
| 4 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour chargesetc., complete as per standard specification |
| 5 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and halfsand &three course aggregate) mix using 20mm gauge hand broken/ and broken granite stone for all RCCitemsof works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and alsoincluding fixingfan clamps and fixtures in rccworkswherever necessary as directed by departmentalofficer etc., complete. |
| 6 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 |
| 7 | Brick work in CM 1:5 (one cement & five sand) using III class ground moulded bricks of size 8 3/4\"X4 1/4\" X 2 3/4\" including finishing, curing, etc., complete complying with standard specification - 100CFT |
| 8 | Plastering with cement mortar (1:5),12 mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) |
| 9 | Supply and fabrication charges for steel including cost and conveyance of materials and labour charges etc., complete as per Standard Specification |
| 10 | Supplying, fabricating, erecting structural steel work for roofing welded or bolted type using MS channels, angles, plates and round bars etc. conforming to IS specification including primer coating and enamal painting as per Design given by the departmental officers etc, complete as per standard specification |
| 11 | White washing two coats with freshly burnt shell lime white in colour in all floors including cost of lime and other materials brushes scaffolding charges etc.complete complying with standard specification and as directed. -100sq.m S.I.333 |
| 12 | Painting 2 coats with approved cement paint over cement plastered wall surface, ceiling and other new surface and including cleaning, preparing the surface and curing etc., complete. |
| 13 | Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour with priming coatincluding the cost all materials etc.,complete, in all floors. |