Tender For Thanjavur District - Package No.09 - Upgradation And 5 Years Maintenance Of 3 Road Works In Thiruvaiyaru Block Under Mgsmt - 2022-2023.
Tender Overview
Project Description
Thanjavur District - Package No.09 - Upgradation And 5 Years Maintenance Of 3 Road Works In Thiruvaiyaru Block Under Mgsmt - 2022-2023.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 28-Jun-2023 | Date Corrigendum - Thanjavur District - Package No.09 - Upgradation and 5 years Maintenance of 3 Road works in Thiruvaiyaru Block under MGSMT - 2022-2023. | Date | 05-Jul-2023 |
| 2 | 05-Jul-2023 | Date Corrigendum - Thanjavur District - Package No. 09 - Upgradation and 5 years Maintenance of 3 Road works in Thiruvaiyaru Block under MGSMT - 2022-2023. | Date | 07-Jul-2023 |
| 3 | 07-Jul-2023 | Date Corrigendum - Thanjavur District - PackageNo.09 - Upgradation and 5 years Maintenance of 3 Road works in Thiruvaiyaru Block under MGSMT - 2022-2023. | Date | 11-Jul-2023 |
BOQ
| Sl. No. | Item Description |
| 1 | Part.01. Upgradation and five year maintenance of Peramur keela theru sellum salaiin Peramur Panchayat Km 0/0-0/500 |
| 2 | Clearing and grubbing road landincluding uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete. |
| 3 | KM 0/0-0/500 |
| 4 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A. |
| 5 | KM 0/0-0/500 |
| 6 | ProvidingUS Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc |
| 7 | KM 0/0-0/500 |
| 8 | Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER |
| 9 | KM 0/0-0/500 |
| 10 | Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and convey |
| 11 | KM 0/0-0/500 |
| 12 | Applying PRIMECOAToverWMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete. |
| 13 | KM 0/0-0/500 |
| 14 | Applying TACK COAToverPrimed WMM surface at 2.5Kgof RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete. |
| 15 | KM 0/0-0/500 |
| 16 | Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, |
| 17 | KM 0/0-0/500 |
| 18 | Road marking with Hot applied Thermoplastic compound with Reflectorising Glass Between on MinusSurface. |
| 19 | Provision for HM stone etc complete |
| 20 | Provision for 60cm Eqilateral triangle Cautionary Signboard |
| 21 | Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete. |
| 22 | Provision for Road Marker / Road Stud with lens Reflector etc complete |
| 23 | Construction of3.00 m Culvert |
| 24 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 25 | Culvert at Ch. 0 m |
| 26 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
| 27 | Culvert at Ch. 0 m |
| 28 | Cementconcrete ofgrade CC 1:4:8 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 29 | Culvert at Ch. 0 m |
| 30 | Cementconcrete ofgrade CC 1:3:6 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc completefor 10 cum. |
| 31 | Culvert at Ch. 0 m |
| 32 | Supply and Erecting Steel Centering including cost and conveyance to worksite and all labour charges etc., completed.(BelowBasement) |
| 33 | Culvert at Ch. 0 m |
| 34 | Supply and Erecting Steel Centering including cost and conveyance to worksite and all labour charges etc., completed.(AboveBasement) |
| 35 | Culvert at Ch. 0 m |
| 36 | Cement concrete 1:2:4 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 37 | Culvert at Ch. 0 m |
| 38 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 39 | Culvert at Ch. 0 m |
| 40 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor. |
| 41 | Culvert at Ch. 0 m |
| 42 | Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of bermsby refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drainsand CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixingdisplaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP-20:2002 and as directed by the departmental officers except for the constructional defects which has to berectified by the contractor at his own cost. |
| 43 | For the First Year from the date of completion of work |
| 44 | For the Second Year from the date of completion of work |
| 45 | For the Third Year from the date of completion of work |
| 46 | For the Fourth Year from the date of completion of work |
| 47 | For the Fifth Year from the date of completion of work |
| 48 | Part.02. Upgradation and five year maintenance ofKattukottai Karur salai in KeelathirupanthuruthiPanchayat Km 0/0 - 0/700 |
| 49 | Clearing and grubbing road landincluding uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete. |
| 50 | KM 0/0-0/700 |
| 51 | Picking the existing black top/ WBM surface to 50 MM depthincluding labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification. |
| 52 | KM 0/0-0/700 |
| 53 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A. |
| 54 | KM 0/0-0/700 |
| 55 | ProvidingUS Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc |
| 56 | KM 0/0-0/700 |
| 57 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 58 | KM 0/0-0/700 |
| 59 | Applying PRIMECOAToverWMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete. |
| 60 | KM 0/0-0/700 |
| 61 | Applying TACK COAToverPrimed WMM surface at 2.5Kgof RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete. |
| 62 | KM 0/0-0/700 |
| 63 | Providing and laying bituminous macadam with hot mix plant using crushed aggregates ofgrading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolledto achieve the desired compaction as per Technical Specification Clause 504. |
| 64 | KM 0/0-0/700 |
| 65 | Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects |
| 66 | KM 0/0-0/700 |
| 67 | Road marking with Hot applied Thermoplastic compound with Reflectorising Glass Between on MinusSurface. |
| 68 | Provision for HM stone etc complete |
| 69 | Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete. |
| 70 | Provision for 60cm Eqilateral triangle Cautionary Signboard |
| 71 | Provision for Road Marker / Road Stud with lens Reflector etc complete |
| 72 | Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of bermsby refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drainsand CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixingdisplaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP-20:2002 and as directed by the departmental officers except for the constructional defects which has to berectified by the contractor at his own cost. |
| 73 | For the First Year from the date of completion of work |
| 74 | For the Second Year from the date of completion of work |
| 75 | For the Third Year from the date of completion of work |
| 76 | For the Fourth Year from the date of completion of work |
| 77 | For the Fifth Year from the date of completion of work |
| 78 | Part.03. Upgradation and five year maintenanceof Kalumangalam Ammankudi salai in Kalumangalam Panchayat Km 0/0-0/870 |
| 79 | Clearing and grubbing road landincluding uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete. |
| 80 | KM 0/0-0/870 |
| 81 | Picking the existing black top/ WBM surface to 50 MM depthincluding labour, hire charges d plants and all other incidental charges etc. complete as per MOST specification. |
| 82 | KM 0/0-0/870 |
| 83 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A. |
| 84 | KM 0/0-0/870 |
| 85 | ProvidingUS Gravel with a lead of KM including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc |
| 86 | KM 0/0-0/870 |
| 87 | Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER |
| 88 | KM 0/0-0/870 |
| 89 | Applying PRIMECOAToverWMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete. |
| 90 | KM 0/0-0/870 |
| 91 | Applying TACK COAToverPrimed WMM surface at 2.5Kgof RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete. |
| 92 | KM 0/0-0/870 |
| 93 | Providing and laying bituminous concrete with hot mix plant using crushed aggregates ofgrading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolledto achieve the desired compaction as per Technical Specification Clause 504. |
| 94 | KM 0/0-0/870 |
| 95 | Road marking with Hot applied Thermoplastic compound with Reflectorising Glass Between on MinusSurface. |
| 96 | Provision for HM stone etc complete |
| 97 | Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete. |
| 98 | Provision for 60cm Eqilateral triangle Cautionary Signboard |
| 99 | Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of bermsby refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drainsand CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixingdisplaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP-20:2002 and as directed by the departmental officers except for the constructional defects which has to berectified by the contractor at his own cost. |
| 100 | For the First Year from the date of completion of work |
| 101 | For the Second Year from the date of completion of work |
| 102 | For the Third Year from the date of completion of work |
| 103 | For the Fourth Year from the date of completion of work |
| 104 | For the Fifth Year from the date of completion of work |
| 105 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender