Water Supply And Sanitation Department-WSSD has published Dnit For Water Supply Scheme Chak Singha ( Sv ) Bifurcation Form Existing W / S Scheme Panam ( Tw4073 ) Etc ( 3 No. ) Block Garhshankar, Distt. Hoshiarpur ( Nabard Under Ridf-Xxix ) . Construction Of Ohsr 50000 Ltr. Capacity With 20 Mtr. Fsl P /. Submission Date for this Tender is 08-09-2023. Solar Panel Tenders in garhshankar Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 11-Jul-2023 | corri | Date | 26-07-2023 |
2 | 26-Jul-2023 | Corrigendum2878 | Date | 14-08-2023 |
3 | 14-Aug-2023 | Corrigendum3134 | Date | 29-08-2023 |
4 | 29-Aug-2023 | Corrigendum | Date | 08-09-2023 |
Sl. No. | Item Description |
1 | Construction of masonry sluice valve chamber excluding Sluice valve cover as per standard design & drawings of public health department. size 0.90x0.90m |
2 | Providing, laying, Jointing and fixing of PVC pipes (6 kg/cm² ISI marked ) as per ISI-4985 (ISI marked with prior approval of Engineer-in-charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications (including specials and excavation) |
3 | Excavation by Mechanical means ( for More than 3 mtr. street width) |
4 | PVC pipe 63mm o/d |
5 | PVC pipe 90mm o/d |
6 | PVC pipe 110mm o/d |
7 | PVC pipe 160mm o/d |
8 | Excavation by Manually means ( for More than 3 mtr. street width) |
9 | PVC pipe 63mm o/d |
10 | Dismantling brick or flagged stone flooring without concrete base and relaying of dry brick on edge paving with a dismantled bricks including sand grouting and including restoration of roads to orginal Position. PVC pipe 63mm o/d |
11 | Dismantling of cement concrete road and restoration in original condition |
12 | Providing and fixing C.I/D.I Flanged end stem of SS (AIS 1410) and Bronze (gunmetal) working parts Sluice Valves ISI marked 14846-2000 Including jointing,testing & costs of nuts and bolts & insertion of sheet, all carriage complete (with approval of engineer in charge). 80mm I/d |
13 | 100mm I/d |
14 | Construction of masonry sluice valve chamber excluding Sluice valve cover as per standard design & drawings of public health department. Size 0.6m x 0.6m |
15 | HOUSE CONNECTIONS FOR PROPOSED HOUSES : Providing proposed water connection to house hold to up to wall with providing laying jointing testing G.I. pipe line 15mm i/d = 2.5 mtr B-class.Prov. & Fixing MDPE pipe 15mm i/d with special 2.00 mtr. (below GL) including cost of specials such as tees, bends, sockets, elbow etc. cutting threading and testing in trenches in the ground and ISI marked 15mm i/d GM ferrule as per IS:2692 and 3" i/d clamp with C.I. bib cock 15mm i/d as per IS: 210 with stainless steel spindle of approved make. |
16 | CONNECTION ON REPLACED PIPE:- Providing proposed water connection to house hold to up to wall with providing laying jointing testing G.I. pipe line 15mm i/d = 2.5 mtr B-class as per CSR 28.36 (A), (Above GL) Prov. & Fixing MDPE pipe 15mm i/d with special 2.00 mtr. (below GL) including cost of specials such as tees, bends, sockets, elbow etc. cutting threading and testing in trenches in the ground and ISI marked 15mm i/d GM ferrule as per IS:2692 and 3" i/d clamp with C.I. bib cock 15mm i/d as per IS: 210 with stainless steel spindle of approved make. |
17 | WATER METER :- Providing, fixnig and jointing water meter (Multi Jet) in G.I. pipe line including threading pipe and making long screw etc. including cost of G.I. jam nutconnection etc. Providing fixing and jointing Brass Ball Valves screwed with SS/Brass bolt & spindle & Teflon seats. complete in all respect. |
18 | Bulk METER :- Providing, & installing of suitable size mechanical Bulk Meter inside the pump chamber including ribber jain, nut, bolt, cutting & threading, piece for fixing Bulk Meter including carriage complete in all respect as per IS 2373-1981 |
19 | CHLORINATION & DISINFECTION : Providing, installing, testing and commissioning one no. electrically actuated diaphragm operated, meteringsystem,chemicaldosingchlorinator, suitablefordelivering0.5 to 6 ltr. o f bleaching powder solution/ sodium hypo solution per hour under maximum delivery pressure up to 7kg cm2, and suction lift not less than 1.5m, as per DWSS standard specification. |
20 | PUMP CHAMBER WITH W.C :- Construction of Pump Chamber Iincluding toilet &size 3.05 X 3.70 mtrincluding cost of electric wiring & sanitary installations as per standard design complete in all respects. |
21 | Provision for Submersible Pumping Set:- Providing & installing,testing & commisioning of one noelectrically driven Submersible Pump set of 10.00 BHPcapable of delivering270 LPM against a head of 85 mtr complete in all respects |
22 | Providing and Fixing Electric panel board consisting of electrical appliances such as automatic Star Delta Push Button or oil imeersed starter,Main Switch, VM, AMpere Meter,ELCB, Shunt capacitor. Single phase,preventer,Indicating lamps,Kit-Kat etc. complete in all respects |
23 | Providing and Fixing G.I. Column Pipe of IS 1239-2004 medium class size 65 mm (in 3mtr lengths each with flanges,screwed and welded on both sides) rubber gaskets, nuts and boltscomplete in all respects. |
24 | Providing and FixingSubmersible Cablewith copper conductor PVC insulatedof 4.00 mm2 size as perIS 694-1990 reaffirmed 2000 complete in all respects |
25 | C.IFITTING INSIDE PUMP CHAMBER:- Providing and installing 100 mm dia delivery main (From Tube well to Duck Foot bend including cost of C.I/D.F Pipes, D/F Sluice valves, D/F NRV & Specials as C.I Bends, Tail Piece Tees etc.. inside the pump chamber as per standard design complete in all respects. |
26 | SOLAR PANEL:- Providing, Fixing, Installing, Commissioning, Solar Panel Energy System (Monocrystalline) for amount of electric power required for running electric motor and other appliances such as fan, tube, Bulb etc in water works site. including Bi-directional meter and inverter of suitable capaity as per guidelines issued by PEDA complete in all respects. |
27 | DEVELOPMENT OF WATER WORKS:- Providing & fixing G.I. Barbed wire 3 ply fencing around the head works site in three rows complete in all respects including cost of winding wire & aluminum painting complete in all respects as per standard Drawing.34+22+34+22= 112-3.00= 109x3= 327 |
28 | Providing and fixing PCC fencing Poles with 6" height 3"x3" Top & 4"x3" Base Provided with 3 No. hooks complete in all respects. |
29 | Providing & fixing D.Hook complete with MS Bolts size 300mm x 18mm as per standard Drawing D-7. |
30 | Construction of brick masonry corner pillar including cost of cement pointing including cost of material complete in all respects as per standard Drawing D-3. |
31 | Construction of masonry gate pillar including cost of MS Steel Gate size 1.22mtr x 1.37 mtr as per standard Drawing with including D-4 complete in all respects |
32 | Construction of Cement Concrete Foot Path with masonry toe wall & earth filling inside water works as per standard Drawing D-7. |
33 | Providing & fixing MS sign board as per standard size of DWSS. |
34 | Carriage of material : SAIND |
35 | BAJRI |
36 | BRICKS |
37 | TILES |
38 | Enviornmental Management : Surface dressing of ground including removing rank vegetation and inequalities not exceeding 15 cmdeep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in all kinds of soil. |
39 | Supplying and planting permanent trees in prepared pits and watering. |
40 | Planting ground covers (Ordinary) including digging of beds to 15 cm depth and mixing FYM, fertilizer and insecticides, planting of sapling at 25 cm distance from plant to plant and row to row. |
41 | Planting seedlings including digging of beds to 15 cm depth and mixing FYM, fertilizer and insecticides, planting of seedlings at 20 cm distance from plant to plant and row to row. |
42 | Provision for one way stand post with Khura complete in all respects |
43 | Item for which no rate or price has been entered it will not be paid for by the Employer when executed and shallbe deemed covered by the rates and prices in the Bill of Quantities. |
44 | Unit rates and prices shall be quoted by the bidder in Indian rupee. |
45 | Where there is a discrepancy between the rate in figures and words, the rates in words will govern. |
46 | Where there is a discrepancy between the unit rate and the line item total resulting from multiplying the unit rate by quantity, the unit rate quoted shall govern. |
47 | Any item of work not included in the above contract schedule of rates and got done at the site of work; the same will be paid according to CSR-2020 subject to the premium or discount tendered by the contractor. In the case of non-schedule items, the decision of the Engineer-in-charge will be final and binding upon the contractor. In case any item which is a part of lump-sum rate is not executed at site, the amount of the same shall be deducted @CSR rates + Ceiling premium prevailing on the date of tender. |
48 | The work will be carried out in accordance with PWD Book of specifications – 1963 edition with upto date amendments. |
49 | Approximate quantities are given in the contract schedule of rate and these can vary at the time of execution of the work. The payment will be made according to the actual work done by the contractor. |
50 | All amendments issued on the common schedule of rates 2020. up to the date of opening of tenders will be applicable on the contract schedule of rates. |
51 | Contractor should clearly quote his rats in figures & words. Conditional tender will be rejected. |
52 | All items and rates provided in the DNIT are subject to the footnotes given in CSR-2020 AND A&C Slips No.5 dated 28-02-2023. |
53 | The Engineer-in-charge will have full powers to change the layout of the work covered in this contract if considered necessary. |
54 | No claim will be entertained from the contractor in case, any mistake in description rates or unit occurs in any item taken in this schedule while preparing this DNIT or on account of typing or comparison or over writing. The same will be rectified at any time as per common schedule of rates 2020 along with up to date amendments. |
55 | The arrangement of bricks at site of work would be done by the contractor at his own level from his own source. |
56 | For any other non-schedule items, the contractor will submit through Engineer-in-charge, the analysis of rates in triplicate based on purchased vouchers. A margin of 10% shall be allowed for the material components and 21.5% on labour components and contractor shall produce photo state copies of the purchase vouchers in support of his claim. The decision of the Engineer-in-charge/competent authority in the matter shall be final and binding on the contractor. |
57 | All the extra items will be got approved from the competent authority and no premium will be allowed on non scheduleitems. |
58 | Payement for the carriage of material shall be paid as per the rates quoted by the tenderer. |
59 | Time period allowed for completion of work in 9 months. |
60 | If contractor fails to start work within 7 days from the date of receipt of valid performance security and signing of agreement as per contractual terms. DWSSreserve the right to impose penalty or withdraw the work & propose action for debarring in future tendering or both; decision of Chief Engineer, (North) shall be binding. |
61 | Item for which no rate or price has been entered it will not be paid for by the Employer when executed and shallbe deemed covered by the other rates and prices in the Bill of Quantities. |
62 | Unit rates and prices shall be quoted by the bidder in Indian rupee. |
63 | Where there is a discrepancy between the rate in figures and words, the rates in words will govern. |
64 | Where there is a discrepency between the unit rateand the line item total resulting from multiplying the unit rate by quantity, the unit rate quoted shall gover. |
65 | Payment of Envirmental Managemental Charges will be released after successful plantation period of 3 months. |
66 | The w`arranty period for Sub. Pumping set will be one year from the date of installation. During warranty period, Contractor /Firm will be fully responsible for all type maintenance i.e carriage from water works site, repair & relowering etc. complete in all respects. |
67 | Item for which no rate or price has been entered in will not be paid for by the Employer when executed and shall be deemed covered by the other rates and prices in the bill of quantities. |
68 | We agree to execute the works in accordance with the approved drawings and techincal specifications at a total contact price of INR………(in figures), INR……in words). |