Rural Development Government Departments Closing in 0 days TDR #38319435

Tender For Construction Of Bridge Over Boro Nala Between Sapmarwa And Rangamati Gram Panchayat Kharki Under Bishnugarh

Issued by Government Departments · bishungarh, Jharkhand
Tender Value
3.12 Crore
Estimated cost
Bid Submission
03 Jul 2023
0 days left
EMD
6.26 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
bishungarh → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Bridge Over Boro Nala Between Sapmarwa And Rangamati Gram Panchayat Kharki Under Bishnugarh

BOQ

Name of Work: Construction of Bridge over Boro Nala between Sapmarwa and Rangamati Gram Panchayat Kharki under Bishnugarh
Sl. No. Item Description
1Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Depth upto 3m
2Depth between 3m to 6m
3Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means
4Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification
5PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.)
6Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification, (PCC Grade M10)Annular Filling
7Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using batching plant,transit mixer & Concrete pump)
8Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (PCC Grade M25 using batching plant, transit mixer & concrete pump)Height Upto5m
9Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawingface. Complete as per drawing and technical specification.
10Furnishing and placing Reinforcement/ Prestressed cement concrete in Super-Structure a per drawing and Technical specification, RCC Grade M 30 RCC T-Beam & Slab (Height between 5m to 10m)
11PCC M-15 Grade Levelling Course below Approach Slab complete as per drawing and Technical specificationPCC Grade M15 using batching plant & Concrete pump
12Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification
13Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.
14Supplying, fitting and fixing in position true to line and level Elastomeric bearing confirming to IRC:83 (Part-II) section IX and clause 2005 of MORTH Specifications complete including all accessories as per drawing and technical specification.
15Providing drainage spout complete as per drawing and technical specification
16Construction of railing of M30 grade in-situ with 20mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specificatoins.
17Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specification.
18Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
19Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
20Supplying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
21Providing and laying of filter media with granular materials/stones crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment , wing wall and return wall to the full heightcompacted to a firm condition complete as per drwaing and technical specification.
22Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications. (Stone / Boulder )
23Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.
24Construction of Embankment with Material Deposited from Roadway Cutting. Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2.Rate per cum after adding royalty @Rs 27.48/cum
25Construction of embankment with approved materials obtained from Borrow Pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading, to required slope and compacting to meet requirement of table 300-2.
26CompactingOriginal ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.
27for Grading - I Material
28Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
29Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.
30Tack Coat on Bituminous surfaces Providiing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
31Open-Graded Premix Surfacing Providing, laying and rolling of open-graded pemix surfacing of 20mm thickness composed of 13.2mm to 5.6mm aggregates using viscosity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capcity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller finished to required level and grades.
32Seal Coat Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 200 tonnes/hours using crushed stone chipping 6.7mm size and penetration bitumen of suitable grade. Case-II : Type B
33Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting)
34Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
35Sand filling in foundation trenches as per Drawing andTechnical specification
36Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (PCC Grade M10 ) PCC Grade M10 using batching plant & Concrete pump
37Stone masonry work in cement mortar 1:3 for foundation complete as per drawing and technical specifications.Random Rubble masonry (coursed/uncoursed)
38Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications. Random Rubble Masonry (Coursed/uncoursed)
39Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment, wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specification.
40Pointing with cement mortar (1:3) on brickwork in substructure as per Technical specifications
41Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (PCC garde M 20 )For Coping PCC Grade M20 using batching plant, transit mixer & concrete pump
42Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
43Plain/ReinfocedCement concrete in open foundation complete as per drwaing and technical specifications. PCC Grade M15 using batching plant & Concrete pump
44Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, RCC Grade M25 using batching plant,transit mixer & Concrete pump
45Plain/Reinforced cement concretein sub-strucutre complete as per drawing and Technical specifications RCC Grade M25 using batching plant, transit mixer & concrete pump
46Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
47Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
48Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
49Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment, wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specification.
50Sand
51Cement
52Boulder
53Aggregate
54Steel
55Bitumen
56Bitumen Emulsion
57Goods & Services Tax (G.S.T.) - 18%
58Labour Cess - 1%

AI Tender Summary

OUR REF NO 38319435
AUTHORITY Government Departments
TENDER VALUE 3.12 Crore
LAST DATE 03-07-2023
Authority
Authority Name Rural Development Department
Work Description Construction Of Bridge Over Boro Nala Between Sapmarwa And Rangamati Gram Panchayat Kharki Under Bishnugarh
Basic Detail
Tender No RE-RDD/SD/HZB/38/05/2022-23
Bidding Type Tender
Location
City bishungarh
State Jharkhand
Key Dates
Publish Date 23 Jun 2023
Submission Date 03 Jul 2023
Open Date 07 Jul 2023
Finance
Tender Value 3.12 Crore
Tender Fee 10000
EMD 6.26 Lakhs
Exemption Not Available
Document List
f35836c4-5e66-4e2d-b40a-791780a3e45a.html
BOQ_97737.xls
Tendernotice_1.pdf
Tender_Document.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 23, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 03, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jul 07, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

f35836c4-5e66-4e2d-b40a-791780a3e45a.html

xls

BOQ_97737.xls

pdf

Tendernotice_1.pdf

pdf

Tender_Document.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders