|
| 1 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by thedepartmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. |
| 2 | Supplying andFILLING GRAVEL Supplying and filling in \"foundation andbasement with filling crushed stone sand in layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification. |
| 3 | Plain Cement concrete of mix 1:4:8 (One cement four M-sand and eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification.TNDSS NO.28 V,VI S25 |
| 4 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). |
| 5 | Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers |
| 6 | SupplyingandFabrication of Steel and placing in position TMT rod Grills for RCC works as per design given including cost of steel and GI binding wire in Floors etc,. Complete complying with standard specification in force and as directed by department officials.-TNDSS NO. SS 86 & 86A V,VI, VII (S6) 7,3 |
| 7 | Brick Work in CM 1:5 (One part of cement & five parts of M - sand) mix using Third Class Country Brick Kiln Burnt bricks 8 ¾ \" x 4 ¼ \" x 2 ¾\" including cost and conveyance of materialsto work site and including all labour charges for mixing, laying, curing the concrete etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:31 |
| 8 | Plastering with CM 1:5(One part of cement & five parts of sand) mix for 12mm thick including cost and conveyance of all materialsto work site and including all labour charges for mixing, laying, curing,finishing etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:56&57 |
| 9 | Special Ceiling Plastering with CM 1:3 (One part of cement & three parts of sand)mix for 10mm thick including cost and conveyance of materials to work site and including all labour charges for mixing, laying, curing,finishing etc., complete as per standard specifications and as directed by departmental Engineers – TNBP No:30,56&57 |
| 10 | White washing two coat freshly burnt shell time white in colour in all floors.Fevicol type gum or glue and adequate quantity of approved blue powder should be added in the preparation of white wash.The rte shall be inclusive of lime and other materials, brushes, scaffolding charges, etc., complete complying with standard specifications. |
| 11 | Painting two coats with ready mixed Plastic Emulsion Paint S.I.358 Plastic emulison paint of\"approved quality and colour over a priming coat, including thoroughscraping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required including cost and conveyance of all materials etc.and all lobour charges etc.complete as per Standard specification and as directed by the departmental officers. TNBP No:66-A |
| 12 | Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three crushed stone Sand)base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification.(The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 13 | Weathring coarse concrete using 20 mm size broken brick jelly with in pure slaked lime over RCC roof in the proportion of 32 : 12 1/2 by volume laid in layer beating the concrete witht the wooden batters etc as per standard specicifations |
| 14 | Finishing Top of Roof with one Couse of pressed tiles set in cm 1:3 Mix using tiles of size 20 x 20 x 2 |
| 15 | For GST 18% |