|
| 1 | Overhauling :- Dismantling and overhaulingof variousitems in the Air handling units of assorted capacities . The Job Includes disconnecting input/outputconnections,dismounting,dismantling of the AHU motor, cleaning of the surafces,making ways for bearing, keys,fans etc,assembling of AHUafter providing and fitting of required items, mounting,fixing ,aligning ,providing shims (if required), testing on no load as well as on full load. The job includes shifting, loading, unloading including head load to and from SKIMS to workshop and vice versa (inside as well as outside the premises) .In case of fabrication of items,standard gauge of metal sheets and insulation as per sample are to be provided .The job also includes taking tapping at various points so as to provide conection for external circuit for input /output water and sir .The job includesapplying two coats ofredoxide , providing ,cotton rolls,PVC sleeves etc as required.All sundry items including geasing, rustoline, nuts, bolts, keys, gaskets, cleaning clothes, safety items, tools, tackles etc are to be arranged by the firm |
| 2 | Descalling of coils (heating as well as cooling) by recomended acid /base descalant chemicals.The job includes neutralizing , rinsing and washing of the coils .The job includes dismantling,cutting,refitting ,hydrotesting testing ,thickness measuring etc |
| 3 | Air fileter cleaning of A.H.U units by using blower/cleaning agent/washing(if applicable)to remove dirt and dust etc.The job includes removing filetrs,shifting them to workshop and then refiiting by using clamps,,fasterners etc |
| 4 | Brazing of A.H.U Coil ( Heating / cooling ) to arrest water leakages including hydraulic testing.The job includes extrating coils,and refiiting after arresting leakages etc |
| 5 | Providing and replacement ofcoils ( Heating/cooling)of following patterns in AHU \"s of assorted capacities.The job includes dismantling,cutting,brazing,finishing and testing of same |
| 6 | 2 Row. |
| 7 | 4 Row. |
| 8 | 6 Row. |
| 9 | Dismouting,Dismantling and extrating blower fans along with accessories.The job includes repairing of blower fan ,welding,rebuilding,grinding ,finishing and alignment ofshaft on Lathe Machine.The job includes refiiting of blower along with allied items and testing same. |
| 10 | Dismantling and cleaning of various parts of the assorted capacities Air Handling Units by using chemical,blower etc .The job includes cleaning of fileters ,drying and fitting of same .The job includes re-assembling of A.H.U., connecting back to the system and testing on full load.. |
| 11 | Providing and fittingof fibber glass wool, slab type over AHUG.I. ducting ( of 50mm thick).The job includes wrapping covers ,providing fire resistant insulation,adhesive, anchoring etc |
| 12 | Fabrication of bearing seats including machining jobs ofblower shaft. |
| 13 | Providing and replacement of blower shaft bearing of followingsizes. |
| 14 | 15mm Shaft size and aboveupto 25mm |
| 15 | 32mm Shaft size and above upto 40mm |
| 16 | 40mm Shaft size and above upto 50mm |
| 17 | 50mm Shaft size and above upto 100mm |
| 18 | 100mm Shaft size and above upto 125 mm |
| 19 | Repairing and replacement of G.I. Ducting in Air Circulation systems inclusive flanges/screwes fastners etc. |
| 20 | 24 SWG. |
| 21 | 26 SWG. |
| 22 | Providing and replacement of condensate tray fabricated from 5mm thick M.S. sheet on a angle/channel of 3”/2” as per site requirement.The job shall include anti-rust painting and applying 2mm bitumen layer on the bottomof the tray to arrest leakages. |
| 23 | Providing and fitting of condensate water drain of 50mm diameter G.I. pipe with fitting as per siterequirements. |
| 24 | Providing and fitting of M.S. sheets 18 swgthick to cover the side gap of A.H.U.along with anti-rust painting. The job shall include providing and fitting ofnuts, bolts washers,screwes fastnersetc. |
| 25 | Repairs of G.I/Aluminum air dampersofassorted sizesand its allied work including nuts, bolts, requirement as per site conditions.The job includes isolating,dismantling, welding/brazing, alignment ,refiiting etc |
| 26 | Providing and fitting of digital controller of assorted range with capillary. |
| 27 | Providing and fitting of sensor cable for abovedigital controller. |
| 28 | Repairs to 7 ply mesh filters of assorted capacities AHU’S |
| 29 | Providing & fitting ofmesh filter of different sizes as per site requirement.The job includes fabrication,providing ,fitting etc |
| 30 | 50MM thick |
| 31 | Providing fitting and testing of V.Belts of following sizes. The job includes removing old one,aligning & tighting new one. |
| 32 | A-70 |
| 33 | A-77 |
| 34 | A-78 |
| 35 | A79 |
| 36 | A-80 |
| 37 | A-81 |
| 38 | A-82 |
| 39 | A-84 |
| 40 | A-86 |
| 41 | A-37 |
| 42 | B-68 |
| 43 | B-70 |
| 44 | B-72 |
| 45 | B-86 |
| 46 | B-88 |
| 47 | B-98 |
| 48 | B-104 |
| 49 | B-108 |
| 50 | B-110 |
| 51 | C-116 |
| 52 | C-138 |
| 53 | C-98 |
| 54 | “B” FAN COIL UNITS:-Overhauling :- Dismantling and overhaulingof variousitems in the Fan coilunits of assorted capacitiesThe Job Includes disconnecting input/outputconnections,dismounting,dismantling of the FCUmotor, cleaning of the surafces,making ways for bearing,keys,fans etc,assembling of FCUafter providing and fitting of required items, mounting,fixing ,aligning ,providing shims (if required), testing on no load as well as on full load. The job includes shifting, loading, unloading including head load to and from SKIMS to workshop and vice versa (inside as well as outside the premises) .In case of fabrication of items,standard gauge of metal sheets and insulation as per sample are to be provided .The job also includes taking tapping at various points so as to provide conection for external circuit for input /output water and sir .The job includesapplying two coats ofredoxide , providing ,cotton rolls,PVC sleeves etc as required.All sundry items including geasing, rustoline, nuts, bolts, keys, gaskets, cleaning clothes, safety items, tools, tackles etc are to be arranged by the firm. |
| 55 | Descalling of coils (heating as well as cooling) by recomended acid /base descalant chemicals.The job includes neutralizing , rinsing and washing of the coils .The job includes dismantling,cutting,refitting ,hydrotesting testing ,thickness measuring etc |
| 56 | Brazing of FCU Coil ( Heating / cooling ) to arrest water leakages including hydraulic testing.The job includes extrating coils,and refiiting after arresting leakages etc |
| 57 | Providing and replacement ofcoils ( Heating/cooling)of following patterns in FCU\"s of assorted capacities.The job includes dismantling,cutting,brazing,finishing and testing of same |
| 58 | Providing and replacement of assorted typefan coil motors as per siterequirement of the unit. |
| 59 | Dismantling and cleaning of various parts of the assorted capacities Air Handling Units by using chemical,blower etc .The job includes cleaning of fileters ,drying and fitting of same .The job includes re-assembling of A.H.U., connecting back to the system and testing on full load.. |
| 60 | Complete painting ofassorted capacities F.C.U\"sas per sample and site requirement |
| 61 | \"C\" Miscellaneous:- Providing and replacement ofHermetic filter drierDCL in chiller units The job includes dismounting old ones,fiiting of new oneand testing the sameon full load ( Make danfos) |
| 62 | Providing and replacement ofindicator along with lamps assorted typeand as per siterequirement |
| 63 | Providing and fitting ofaxial flow fans of assorted capacities along with fittings as per sample .Thejob includes dismounting old ones,fiiting of new oneand testing the sameon full load |
| 64 | 900 CFM |
| 65 | 1000 CFM |
| 66 | 1300 CFM |
| 67 | 1800 CFM |
| 68 | 2000 CFM |
| 69 | 2100 CFM |
| 70 | 2500 CFM |
| 71 | 3000 CFM |
| 72 | 4000 CFM |
| 73 | 6000 CFM |
| 74 | Providing/fitting & replacement of Ceiling/Wall mounted Fan Coil Unit of following specification: Single phase;230 Volts motor of suitable capacity ;Double end shaft with 2 no. blowers;FCU coil fabricated out of coppertubing;Aluminium fins: 11-12 fins per inch;Valves: 02 no. (01 no strainer type ball valve, 01 no ball type);The FCU should include pre filters. |
| 75 | 2TR, 800CFM |
| 76 | 1.5TR, 600CFM |