Construction Of Bridge Across Manakondan Drain In Agasthiyampalli Thennadar Road Pkg No.398 In Vedaranyam Blaok

Issued by Local Bodies · vedaranyam, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
27 Jun 2023
0 days left
EMD
11.48 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
vedaranyam → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Bridge Across Manakondan Drain In Agasthiyampalli Thennadar Road Pkg No.398 In Vedaranyam Blaok

BOQ

Name of Scheme: PMGSY III 2022-23 Batch I
Sl. No. Item Description
1MRL04-Construction of Bridge across Manakondan Drain inAgasthiyampalli Thennadar road Ch. 0/0 . in Vedaranyam Block
2Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL.
3Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications forPILE CAP UNDER ABUTMENTS & PIERS.
4Providing and driving in position permanet M.S liner including cost and conveyance to the site and fabrication charges and tools and plants and driving M.S 6 mm thick liner to be left peramnently with the pile shaft as per the requirement and as per the specifications and placing from the bottom with all leads and lifts using 6mm M.S sheet etc., complete for PILES BELOW ABUTMENTS & PIERS.
5Reinforced cement concrete cast-in-situ bored piles of 1000 mm diameter M-30 Grade using 20mm 10mm & below ISS size HBG metal with minimum cement content of 400kg per cu.m maximum water cement ratio of 0.4 and slump of 150 - 200mm by tremie concreting including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel including placing of reinforcement in position, concreting, including all labour charges for driving or boring, mobilisation of piling equipment and other accesssories required for driving the pile, cost of Bentonite solution and the temporary liners, chiselling andincluding forming of working platform over the river bed for accommodating piling eqipments, forming approaches to the working platform,mixing concrete, filling it inposition,compacting,cutting of pile head to cut off level for the casting the pile caps, including diversion of water course if necessary and all other incidental charges tec., complete as per standard specifications etc., complete for PILES BELOW ABUTMENTS & PIERS.
6Vibrated Cement Concrete of Grade M 15 Nominal Mix 1:2.5:5 using 40mm, 20mm and 10 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges formixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for below PILE CAP OF ABUTMENTS & PIERS
7Vibrated reinforcedCement Concrete of Grade M 30 using 20 & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges formixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for PILE CAP under ABUTMENT, WNGS and PIERS
8Vibrated reinforced cement concrete M 30 Grade using 20 & 10 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS BELOW SILL LEVEL -
9Vibrated reinforced cement concrete M 30 Grade using 20 & 10 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS ABOVE SILL LEVEL -
10Vibrated reinforcedCement Concrete of Grade M 30 using 20 & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges formixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications forRCC Circular Column Pier Below SILL LEVEL
11Vibrated reinforcedCement Concrete of Grade M 30 using 20 & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges formixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications forRCC Circular Column Pier Above SILL LEVEL
12VibratedReinforced Cement ConcreteM 30 Grade using20 & 10 mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cementat siteincluding cost of formwork, soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS.
13Vibrated reinforcedCement Concrete of grade M 30 using 20 & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges formixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications forRCC Capping Beam above Column Pier
14Vibrated reinforcedCement Concrete of grade M 30 using 20 & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges formixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications forPEDESTALS OVER CAPPING BEAMS AND BED BLOCKS.
15Supplying and fixing of Elastometric bearing as shown in the drawing including cost and conveyance to work site, labour for fixing the bearing in position and all other incidental charges., complete as per sectiong 2000 of MORT & H specification (V Revision)
16Vibrated reinforcedCement Concrete of Grade M 30 using 20 & 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges formixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications forT-BEAM AND CROSS BEAM GIRDER.
17Vibrated reinforced cement concrete M 30 Grade using 20 & 10 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications forDECK SLAB, KERB .
18Vibrated Reinforced Cement Concrete M-30 Grade using 20 mm& 10 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC HAND RAIL AND POSTS OVER DECK SLAB.
19Supplying and installation of STRIP SEALEXPANSION joint system confirming to specifications for Road and Bridge Works in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly,including labour, equipment and incidental charges for fixing the joints complete in all respects, as per section 2600 of MORT & H specification (V Revision)
20Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE ABUTMENTS AND RETURNS.
21Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick andwell compacted in layerswith smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site includingall labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MORT\"s (Roads Wing) specifications for Roads and Bridges \" Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.
22Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling behind the abutment and wings
23Vibrated Cement Concrete of Grade M 15 Nominal Mix 1:2.5:5 using 40mm, 20mm and 10mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges formixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for BASECOURSE BELOW APPROACH SLAB.
24Vibrated reinforced cement concrete M 30 Grade using 20 mm &10 mmISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications forAPROACH SLAB.
25Vibrated Cement Concrete M20Grade using 40mm, 20mm & 10 mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights for parapet over Wing Wall.
26Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
27Vibrated cement Concrete M30 Grade using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab.
28Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
29ABSTRACT FOR RCC PROTECTIVE WORK-Provision for Retaining Wall (Sub Estimate) RCC
30Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications forFOUNDATION UNDER RETAING WALL.
31Filling inside the Foundation with clean coarse M.Sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Foundation.
32Vibrated Cement Concrete of Grade M 15 Nominal Mix (1:2:4) using, 40 mm, 20 mm & 10 mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges formixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOUNDATION BELOW.
33VibratedCement Concrete Grade M 20using 40 mm, 20 & 10 mm ISS size HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per standard specifications for RETAINING WALL FOUNDATION.
34VibratedCement Concrete of Grade M 20using 40 mm,20 mm & 10 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cementat siteincluding cost of formwork, soft water, labour charges for mixing, transporting, layingand curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF RETAINING WALL ABOVE SILL LEVEL -
35Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Retaining Wall including cost and conveyance of all materials to work site and labour charges for fixing, complete
36ABSTRACT FOR APPROACH ROAD
37Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)
38Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per (Mix -in - place method).
39Providing and laying Water Bound Macadam Grading - II (75mm to 22.40mm)IRC HBGmetalconsisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
40Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
41Applying TACK COATover WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
42Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
43Providing and Laying Gravel including cost & conveyance of gravel from approved sources to work site including labour for spreading, wateringand compacting by Power roller to achieve the required Proctor density at 100% compaction (Shoulder)
44Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type \"A\" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
45Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
46Provision for Name Board
47Provision for Sign Board
48Provision for Direction Board
49Provision for Pile Load Test Abt
50Provision for Bridge Safe Load Test (LS)
51Towards the charges for routlinemaintenance of the bridge work executedunder PMGSY including dressing of bermsby refilling the gully with the earth fromborrow pits, cleaning of wild seasonalgrowth on berms, destilting of side drainsand CD works, white washing guard stones,painting of KM, HM stones, parapets,cutting of branches of trees, refixingdisplaced guard stones, caution boards,speed limit boards etc., with the periodicityfor the above activities as prescribed in IRCSP-20:2002 and as directed by thedepartmental officers except for theconstructional defects which has to berectified by the contractor at his own cost
52For the First Year from the date ofcompletion of work
53For the Second Year from the date ofcompletion of work
54For the Third Year from the date ofcompletion of work
55For the Fourth Year from the date ofcompletion of work
56For the Fifth Year from the date ofcompletion of work
57GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

AI Tender Summary

OUR REF NO 38286033
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 27-06-2023
Authority
Authority Name Rural Development And Panchayats Department
Work Description Construction Of Bridge Across Manakondan Drain In Agasthiyampalli Thennadar Road Pkg No.398 In Vedaranyam Blaok
Basic Detail
Tender No PMGSY/Bridges/2469/2023/398
Bidding Type Tender
Location
City vedaranyam
State Tamil Nadu
Key Dates
Publish Date 21 Jun 2023
Submission Date 27 Jun 2023
Open Date 27 Jun 2023
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 11.48 Lakhs
Exemption Not Available
Document List
BOQ_200015.xls
fcb9a195-b605-40b1-9d1d-ef053732b7ad.html
PriceBid.pdf
TechBid.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jun 21, 2023
11:30 IST

Tender Published

Tender notice published.

Completed
Jun 27, 2023
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jun 27, 2023

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_200015.xls

html

fcb9a195-b605-40b1-9d1d-ef053732b7ad.html

pdf

PriceBid.pdf

pdf

TechBid.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders