| 1 | Dismantling Stone Masonry in cement mortar walls clearing away and carefully stackingmaterials useful for reuse for any thickness of walls including allcostetc. complete. Complying with std. specifications As perSSR - Sch Item No: B (14) |
| 2 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications. SS 20 B |
| 3 | Supplying and filling in foundation andbasement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. |
| 4 | Supplying and filling the basement with Good Earth filling in layers of not more than 15cmthick well rammed watered and compacted - etc., complete complying with standard specification. |
| 5 | Plain Cement concrete 1 :4:8 (one cement, four M-Sand and eightaggregates) using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges for mixing, laying, compactingand curing etc, complete as per SS |
| 6 | Supplying and filling in foundation andbasement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification |
| 7 | Providing and laying in position Standardised Concrete Mix M-25 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 350Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone sand (M- Sand) but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS standards. Below Ground Level |
| 8 | Above Ground Level Upto +0.0 to +3.0m |
| 9 | Above Ground Level Upto +3.0m to +6.0m |
| 10 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oakjoists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)Below Ground Level |
| 11 | Above Ground Level Upto +0.0 to +3.0m |
| 12 | Above Ground Level Upto +3.0m to +6.0m |
| 13 | Supplying, fabricating and placing in position of Steel Reinforcement using Mild steel or Ribbed tor steel rods, for all RCC worksas per the design given by the departmental officers including cost of steel and binding wire and all labour charges for cutting, bending, tying and placing in position etc, complete as per SS. |
| 14 | Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - Rev V No. 111,112,401,900 |
| 15 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. |
| 16 | Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion (SS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev-5 Specifications |
| 17 | Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2kgs of bituminous Emulsion (RS)for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications |
| 18 | Providing and laying 50 mm compactedthick dense bituminous macadamusing 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70bitumenfor premixing per 10 sqm including cost and conveyance of all materials toC M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and compaction byVibratory roller tothe required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30tC M P with bitumen boiler,tipper trucks, paver finisher, vibratory rollers and all other tools and plants required,includingall other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. |
| 19 | Providing and laying Bituminous concrete to 40mm thickusing 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with45.27 kgs of 60/70bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) andfor premixing per 10 sqmincluding cost and conveyance of all materials toC M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm/ 30mm with mechanical paver to the specified grades and cross sections and compaction byVibratory roller tothe required density etc.,including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30tC M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,includingall other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. |
| 20 | Provoiding and Laying Hot Applyied Thermoplastic Compund 2.5mm Thick Including Reflectorising Glass beads at 250 gms per Sqm Area , Thickness of 250 mm Exclusive of Surface Applied Glass Beads as Per IRC |
| 21 | GST 18% |