Tender For Restoration Of Bt Road At Pazhathotta Road.(Chainage Length 0/150 T0 1/470)
Tender Value
65 Lakhs
Estimated cost
Bid Submission
30 Jun 2023
0 days left
EMD
65000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
kadambur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Restoration Of Bt Road At Pazhathotta Road. ( Chainage Length 0 / 150 T0 1 / 470 )
BOQ
| Sl. No. | Item Description |
| 1 | Picking the existing damaged metalled and Block Topped Surface 50mm to 100mm thick including sectioning and levelling etc., complete as per standard specification TNDSS NO: Special |
| 2 | Collection and Spreading the Well gravel including cost and conveyance of all materials from approved quarries as noted in the lead chart to the road site including loading, unloading and stacking them to departmental gauge for premeasurement including labour charges for spreading leveling to camber and consolidated by power roller etc complete as per MORTH Specification 401 and 1015. |
| 3 | Providing and Laying, Spreading and Compacting graded stone aggregates to WET MIX MECADAM Specification in 250mm thickspecification including premixing the materials with water at OMC in mechanical mix plantCarriage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of materials,labour charges,rentals for machinery,fuel and all other incidental charges etc complete as per clause406 of MORTH Specification |
| 4 | Providing and laying Prime coat over WMM surface using7 kg of Emulsion bitumen (Ss1) per 10 sqmarea for preparatory of surface including cost of material, labour charges rentals for machinery,fuel and all other incidental charges etc complete as per clause 502 of MORTH Specifications |
| 5 | Providing and laying Tack coat over WMM surface using2.5 kg of Emulsion bitumen (Rs1) per 10 sqmarea for preparatory of surface including cost of material, labour charges rentals for machinery,fuel and all other incidental charges etc complete as per clause 503of MORTH Specifications |
| 6 | Providing and laying 50 mm compactedthick Dense Bituminous Macadamusing 0.24 cum of 26.5-13.2 mm graded metal and 0.25 cum of 13.2-2.36 mm graded metal and 0.23 cum of 2.36 mm & below metal with 53.20 kgs of 60/70bitumen (VG30)for premixing per 10 sqm including cost and conveyance of all materials toC M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50 mm with mechanical paver to the specified grades and cross sections and compaction byvibratory roller tothe required density etc.including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30tC M P with bitumen boiler,tipper trucks,paver finisher, power rollers and all other tools and plants required,includingall other incidental charges etc.,complete using C M P clause 505 of MORTH Rev-5 specifications. |
| 7 | Providing and layingBituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and below with 50.30kgs of VG 30 /VG 40 bitumen for 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30tCMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5. |
AI Tender Summary
Tender Timeline
Jun 21, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJun 30, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJun 30, 2023
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender