| 1 | CIB SIZE ,4\"-0\"X3\"-0\"X 0\"-9\"above plinth level with trapered having 20 degree angle slope in brick masonary (1:4)mix including plaster ,paint, lettering ,all complete as per direction in charge inculiding inguration stone with writing |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil : |
| 3 | REMOVAL OF INDIVIDUAL OPEN/EMBEDDED BOULDERS BY ANY MEANS |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed inculiding lead lift and carriage |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 6 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: 7.1.1 Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 7 | Dry random rubble masonry with hard stone in foundation and plinth:Without bond stone |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 9 | SPREADING RIVER BED MATERIAL , WATERING & ROLLING COMPLETE INCLUDING PREPERATION OF THE SURFACE & ROLLING WITH HAND ROLLER INCLUDING SUPPILY & STACKING |
| 10 | Supplying & stacking of hard stone (for stone pitching) 22.5cm thick at site |
| 11 | PROVIDING & SPREADING COARSE SAND INCLUDING SUPPLY& ROLLING |
| 12 | PROVIDING & LAYING OF BRICK BATSINCLUDING SUPPLY,STACKING & ROLLING |
| 13 | Supplying and stacking of good earth at site including ROLLING TO THE REQUIRED SLOPE SO AS AVOID WATER LOGGING & PROVIDEA GOOD TURF |
| 14 | Carriage ofSAND at an avg. distance OF 0.50 KM by A/T |
| 15 | Carriage ofSAND at an avg. distance OF 0.50 KM by A/T |
| 16 | Carriage ofbajri at an avg. distance of 150 KM by M/T & 0.5 KM BY A/T |
| 17 | Carriage ofCEMENTat an avg. distance of 150 KM by M/T & 0.5 KM BY A/T |