|
| 1 | Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m. and as directed by TWAD BOARD Officers. |
| 2 | First depth of 0 to 2 m |
| 3 | 2nd depth of 2m to 3m |
| 4 | Filling with clean m.sand complying with standard specification includingwatering ramming and consolidation etc., complete and as directed by TWAD BOARD Officers. |
| 5 | Levelling coarse in cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials,mixing,placing, ramming, curing,finishing etc., complete and as directed by TWAD BOARD Officers. |
| 6 | Reinforced Cement Concrete with M30 Design Mixfor the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing position, lifting, vibrating, finishing curing,finishing etc., complete and as directed by TWAD BOARD Officers. |
| 7 | Beyond 1.50 m & upto 4.50 m below GL |
| 8 | Upto 1.50 m Below GL |
| 9 | Upto 4.50 m above GL |
| 10 | Supply and erection of steel centering,shuttering for soffits and sidesincluding necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10stiffened with MS angle of size 25 X 25 X 3mm for boarding laid over Silver Oak joists of size 10cm X 6.5cm space at 10cm c/c and supported by Casurino Props10cm - 13cm spaced at 75cm c/c etc., complete and as directed by TWAD Board Officers. |
| 11 | For0.00 to 3.30 M (Plane Surface) |
| 12 | For0.00 to 3.30 M (Curved Surface) |
| 13 | For0.00 to 3.30 M (FOR ROUND COLUMN) |
| 14 | For 3.30 M- 4.3 M(Plane Surface) |
| 15 | For 3.30 M TO 4.30M (Curved Surface) |
| 16 | Supplying, fabricating and placing in position of RTS rods for reinforcement including cost of steel and binding wire, labour charges etc., complete for RCC works and as directed by TWAD Board Officers. |
| 17 | Providing and fixing of cut stone (Rough dressed) set in CM 1:3 of size 0.45 X 0.45 X 0.15M at site including cost ofall materials, mixing, placing position, lifting, vibrating, finishing curing,finishing etc., complete and as directed by TWAD BOARD Officers. |
| 18 | Providing RCCVentilator of 0.15 m dia using 20mm HBG stone including cost of all materials, centering, shuttering, strutting,reinforcement, placing of concrete, finishing, curing and fixing in position on the roof slab with mosquito proof net arrangement and etc., |
| 19 | Supply,Delivery and fixing of CI Manhole frame with cover of following size including cost of all materials, fixing of MS clamps,Bolt and nuts etc.,complete and as directed by TWAD Board Officers. |
| 20 | Colour washing two coats using cement paint includingcost ofcement paint cost of all materials, labour charges, etc., |
| 21 | Refilling the foundation with excavatedSoil (other than sand) in layers of not more than 15cm thick, watering, well ramming, consolidating, complying with standard specification and as directed by TWAD Board Officers. |
| 22 | GST Amount for providing Service to Government Contract Works for the above RENEWALWorks. { GST Amount is the Total GST Amount for overall quoted amountabove this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |