| 1 | Dismantling damaged plain cement concrete clearing away and carefully etc., complete as per standard specifications |
| 2 | Earth work excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc., as per standard specifications |
| 3 | Supplying and filling in foundation andbasement with filling sand in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. |
| 4 | Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. |
| 5 | Supplying and errecting centering to sides and soffits including supports and struttingfor drainage sides andculvert body wall sidesusing M.S Sheets of size90cm x 60cm and B.G 10stifenedwith welded mild steel angles of size 25mm x 25mm x 3mm for boardinglaid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification. |
| 6 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. |
| 7 | Supplying, fabricating and placing in position M.S. or R.T.S. reinforcements grill for RCC works as per the design given including cost of steel and binding wire etc., complete complying with standard specification. (The contractor will have to make his own arrangements for the supply of M.S. plain rods / RTS rods and binding wire) |
| 8 | Reinforced Cement Concrete 1:1½:3 (One cement, one and half sand and three stone jelly) using 20 mm gauge hard granite broken stone jelly for all reinforced cement concrete works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrator, finishing, curing, etc.complete as directed by the Departmental Officers |
| 9 | Finishing the top of floor with Granolithic Finish with CC 1: 2: 4 (one cement, two sand & four HBG jelly) using chips of grade 10 mm andbelow for 25mm thickness and rubbed smooth etc, complete as per standard specification |