Tender For Construction Of Sub Center For Haripur Under Gp_Haripur Of Nimapara Block In The District Of For The Year 2022_23 Dist_ Puri, Odisha
Tender Value
35.56 Lakhs
Estimated cost
Bid Submission
01 Jul 2023
0 days left
EMD
35570
Bank guarantee accepted
Document Fee
7080
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
nimapara → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Sub Center For Haripur Under Gp_Haripur Of Nimapara Block In The District Of For The Year 2022_23 Dist_ Puri, Odisha
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation in foundation inlaterite rock or any hard rock (other than granite or disintegrated rock) remeoved by chiselling including dressing & levelling the bed not exceeding 1.5m in depth and depositing the soil within initial lead of 50m and as specification approved by the department |
| 2 | Filling foundation and plinth with good coarse sandincluding watering& ramming as directed by the Engineer in charge. |
| 3 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm sizeblack broken granite stone aggregates of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm(6\") thick to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with T&P required for the work etc. complete i as per direction of the Engineer-in-charge. |
| 4 | Reinforced Cement concrete (1:1/2:3) with 12mm sizegraded crusher broken hard granite chips for R.C.C. works including hoisting and lying including centering shuttering etc complete.Ground Floor(a)Column Base/Footing |
| 5 | (b)Column |
| 6 | (c)Plinth Beam |
| 7 | (d)Roof Beam |
| 8 | (e)Lintel Band |
| 9 | (f)Chajja |
| 10 | (g)Sheleve |
| 11 | (h)Roof Slab |
| 12 | (i)Stair case |
| 13 | First floor(a)Column |
| 14 | (b)Lintel Band |
| 15 | (c)Chajja |
| 16 | (d)Roof Slab |
| 17 | (e )Sheleve |
| 18 | (f)Roof beam |
| 19 | (g)Stair case |
| 20 | Providing HYSD including cutting, bending, binding and tying the grills and placing in position including cost, covenyance and royalty of all materials and cost of all labour etc. complete,(a) Ground floor |
| 21 | (b) First floor |
| 22 | Brick work with Flyash Bricks 25cm×12cm×9cm size having crushing strength not less than 35 kg/cm 2 with dimensional tolerance ±2 percent in cement mortar (1:6) in foundation and plinth etc complete. |
| 23 | Brick work with Fly Ash bricks of size 25cmx12cmx8cm and crushing strength not less than 75 kg/cm2 in C.M.(1:6) in Super structure including cost of all material, labour, conveyance, royality, loading and unloading, sundries, tools and plants etc. complete as per the direction of the Engineer in Charge.(stair case head room) (a) Ground floor |
| 24 | (b) First floor |
| 25 | 20mm thick grading plasterwith cement mortar (1:4) overroof slablaid to proper slope finished smooth wateringand curring including cost ,conveyance, royality , taxes of all materials and labour with T&P required for the work etc. complete in all respect,(a) Ground floor |
| 26 | (b) First floor |
| 27 | 12 mm thick cement plaster (1:6)including all cost and conveyance, royalty, taxes of all materials etc.complete as directed by the Engineer in Charge.(a) Ground floor |
| 28 | (b) First floor |
| 29 | 16 mm thick cement plaster (1:6)including all cost and conveyance, royalty, taxes of all materials etc.complete as directed by the Engineer in Charge.(a) Ground floor |
| 30 | (b) First floor |
| 31 | Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles.( Ceramic Tiles )(a) Ground floor |
| 32 | (b) First floor |
| 33 | FixingVitrified tiles in floors treads or steps and landingon 20mm thick bed of cement mortar 1:4 jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete excludingcost of precast tiles.(a)Ground Floor |
| 34 | (b) First floor |
| 35 | Supplying, fitting, fixing Chequered tiles in floors of following size of approved make confirming to IS: 13755 laid on 20mm thick cement mortar 1:4 (1 cement : 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour, T&P etc. required for the work all complete as per direction of Engineer-in-charge. |
| 36 | Supplying, fitting & fixing of window (siding type made up alminum section 151-154,151-155, as windows frame section No.151-155, 151-153 nad 151-167 as shutter framw with 5mm thcik black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour T & P etc complete as per direction of Enginner -in charge.(a) Ground floor |
| 37 | (b) First floor |
| 38 | Fixing Vitrifiedtiles in dados (Printed Series)skirting and risers of stepson 12 mm thick cement plaster(1:3) jointed with neat cement slurry mixed with pigments to matche shade of the tiles including rubbing and polishing completeasper direction of Engineer-in-charge. (Ground Floor) |
| 39 | First Floor |
| 40 | Priming one coat two wall surafce using water bound cement primer including cost, conveyance all materilas, labour and T & P etc complete.(a) Ground floor |
| 41 | (b) First floor |
| 42 | Finishing wall surface of walls with Acrylic wall putty ( water based ) of approved make including cost of all labour, materials etc complete(a)(Ground floor) |
| 43 | (b) First floor |
| 44 | Finishing wall surface with two coats of weather coat over a coat of cement primingincluding cost and conveyance of all materials, labour T&P, hire charges of machine, all taxes etc all completes in all respects as per the direction ofEngineer charges. (a) Ground Floor |
| 45 | (b) First floor |
| 46 | Distempering two coats over interior wall surfacewith Distemper of approved shadeincluding cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C.. (a) Ground floor |
| 47 | (b) First floor |
| 48 | Providing & Fixing & Fixing M.S. Doors & windowIncluding cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C.(a) Ground Floor |
| 49 | (b) First floor |
| 50 | Painting two coats over wood and iron workwith approved Enamel paint over a coat of primming, including cost and conveyance of all materials to site, and all labour charges complete as per direction of E.I.C..(a) Ground floor |
| 51 | (b) First floor |
AI Tender Summary
Tender Timeline
Jun 16, 2023
11:30 IST
Tender Published
Tender notice published.
CompletedJul 01, 2023
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedJul 05, 2023
Bid Opening Date
Technical bids will be opened and evaluated.