Tender For Repairs To The P.U.Ele School 1. M.Tiled Building East Facing 2. Rcc West Facing 3. Rcc East Facing (Prc) 4. Perunila Girls Toilet Repair 5. Sirunila Girls Toilet At Kaikalathur Pt. Veppanthattai Block Of Perambalur District Under Sids - 2
Tender Overview
Project Description
Repairs To The P.U.Ele School 1. M.Tiled Building East Facing 2. Rcc West Facing 3. Rcc East Facing (Prc) 4. Perunila Girls Toilet Repair 5. Sirunila Girls Toilet At Kaikalathur Pt. Veppanthattai Block Of Perambalur District Under Sids - 2022-2023 Pa
BOQ
| Sl. No. | Item Description |
| 1 | 1. Repairs to the P.U.Ele school M.tiled building East facing at Kaikalathur Pt. Towards cost and supply of best mangalore tiled of all labour charges etc complete |
| 2 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x4 1/4\"x2 3/4\" and conveyance of all materials to site and all labour charges etc complete |
| 3 | Pointing the RR Masonry with cement mortar 1:3 mixincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 4 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete |
| 5 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc complete |
| 6 | Cost and supply of steel door 1.00X2.10 |
| 7 | Special design art work with first class quality emulsion paint including wall putty, Priming coat etc complete |
| 8 | WHITE WASHING ONE COAT using best freshlyburnt white shell lime in all floors including cost of lime and other materials, brushes, scafolding charges etc. complete complying with standard specification and as directed. |
| 9 | Distembering one coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 10 | Exterior Emulsion painting one coats with best approved quality and colourpaint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 11 | Painting two coats over Old C.Wood Joinery works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete |
| 12 | Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete. |
| 13 | Painting two coats over new iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete. |
| 14 | Painting two coats with approved Black Oxide for Old Black Board over the cement platered surface including cost and conveyance of paint and all labour charges etc complete |
| 15 | Supplying & fixingwith cuddapah slabs 20-30mm thick for cup board thick including of all labour charges etc complete |
| 16 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 17 | LED Light |
| 18 | Fan |
| 19 | 15 Amps Plug point |
| 20 | Rain water pipe |
| 21 | Repairs to window and door |
| 22 | Provision for String Bandal |
| 23 | Cost of door locking Cubborad work |
| 24 | Cost and supply of name board |
| 25 | 2. Repairs to the P.U.Ele school RCC roof West facing at Kaikalathur Pt. Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight. |
| 26 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc complete |
| 27 | Plastering with cement mortar 1:3 mixto10mmthick including cost and conveyance of all materials to site and all labour charges etc complete |
| 28 | Special design art work with first class quality emulsion paint including wall putty, Priming coat etc complete |
| 29 | WHITE WASHING ONE COAT using best freshlyburnt white shell lime in all floors including cost of lime and other materials, brushes, scafolding charges etc. complete complying with standard specification and as directed. |
| 30 | Exterior Emulsion painting one coats with best approved quality and colourpaint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 31 | Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete. |
| 32 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x4 1/4\"x2 3/4\" and conveyance of all materials to site and all labour charges etc complete |
| 33 | Supplying & fixingwith cuddapah slabs 20-30mm thick for cup board thick including of all labour charges etc complete |
| 34 | Distembering one coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 35 | Painting two coats with approved Black Oxide for Old Black Board over the cement platered surface including cost and conveyance of paint and all labour charges etc complete |
| 36 | LED Light |
| 37 | Fan |
| 38 | 15 Amps Plug point |
| 39 | Cost of door locking Cubborad work |
| 40 | Cost and supply of name board |
| 41 | 3. Repairs to the P.U.Ele school RCC roof East facing (PRC) at Kaikalathur Pt. Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight. |
| 42 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc complete |
| 43 | Plastering with cement mortar 1:3 mixto10mmthick including cost and conveyance of all materials to site and all labour charges etc complete |
| 44 | Special design art work with first class quality emulsion paint including wall putty, Priming coat etc complete |
| 45 | Exterior Emulsion painting one coats with best approved quality and colourpaint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 46 | WHITE WASHING ONE COAT using best freshlyburnt white shell lime in all floors including cost of lime and other materials, brushes, scafolding charges etc. complete complying with standard specification and as directed. |
| 47 | Distembering one coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 48 | Painting two coats with approved Black Oxide for Old Black Board over the cement platered surface including cost and conveyance of paint and all labour charges etc complete |
| 49 | Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete. |
| 50 | LED Light |
| 51 | Fan |
| 52 | Plug point |
| 53 | Provision for RWH pipe with 110 mm dia PVC pipe arrangement |
| 54 | 110 mm PVC Elbow |
| 55 | Cost of door locking Cubborad work |
| 56 | Cost and supply of name board |
| 57 | 3. Repairs to the P.U.Ele school RCC roof Girls toilet at Perunila H/O Kaikalathur Pt. Towards cost and supply of IWC pan |
| 58 | Towards cost and supply of wash bassin |
| 59 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x4 1/4\"x2 3/4\" and conveyance of all materials to site and all labour charges etc complete |
| 60 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc complete |
| 61 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 62 | Collection and supply of Sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard specifications |
| 63 | Cost and supply of RCC ring 1.35 m dia |
| 64 | Cost and supply of RCC slab 1.35 m dia |
| 65 | Dadooing of walls with white glazed tiles of size 15cmx15cmx6 mmof best quality including cost and conveyance of all materials to site and all labour charges etc complete |
| 66 | Distembering one coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 67 | Exterior Emulsion painting one coats with best approved quality and colourpaint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 68 | Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete. |
| 69 | Towards cost and supply of following pipes and specials |
| 70 | 110 mm PVC pipe |
| 71 | 110 mm PVC elbow |
| 72 | 63 mm PVC pipe |
| 73 | 63 mm PVC Elbow |
| 74 | 63 mm PVC Tee |
| 75 | 63X32 mm PVC Saddle piece |
| 76 | 32 mm PVC pipe |
| 77 | 32 mm PVC elbow |
| 78 | 32 mm PVC Tee |
| 79 | 32 mm PVC Tap |
| 80 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 81 | Collection and supply of Sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard specifications |
| 82 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 83 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x4 1/4\"x2 3/4\" and conveyance of all materials to site and all labour charges etc complete |
| 84 | Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etc using mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmild steel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(country wood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand supported by casurina props of 10cm to 13cm dia spacedat 75cmcentretocentre complete complying with standardspecificationsandasdirectedbydepartmental officers including conveyance of all materials to site and proper centering etc complete. |
| 85 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all charges etc., complete |
| 86 | Reinforced cement concrete 1:1.5:3 mix using 20mmISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete |
| 87 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc complete |
| 88 | Cost and supply of Steel door size 0.75X1.80 |
| 89 | Cost and supply of name board |
| 90 | 4. Repairs to the P.U.Ele school RCC roof Girls toilet at Sirunila H/O Kaikalathur Pt. Towards cost and supply of IWC pan |
| 91 | Towards cost and supply of wash bassin |
| 92 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x4 1/4\"x2 3/4\" and conveyance of all materials to site and all labour charges etc complete |
| 93 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc complete |
| 94 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 95 | Collection and supply of Sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard specifications |
| 96 | Cost and supply of RCC ring 1.35 m dia |
| 97 | Cost and supply of RCC slab 1.35 m dia |
| 98 | Dadooing of walls with white glazed tiles of size 15cmx15cmx6 mmof best quality including cost and conveyance of all materials to site and all labour charges etc complete |
| 99 | Distembering one coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
| 100 | Exterior Emulsion painting one coats with best approved quality and colourpaint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. |
| 101 | Painting two coats over old iron work such as doors, windows, ventilators, windows bars, balustrades etc., with best approved best quality of synthetic enamal paint of approved colour over the existing priming coat etc., complete. |
| 102 | Towards cost and supply of following pipes and specials |
| 103 | 110 mm PVC pipe |
| 104 | 110 mm PVC elbow |
| 105 | 63 mm PVC pipe |
| 106 | 63 mm PVC Elbow |
| 107 | 63 mm PVC Tee |
| 108 | 63X32 mm PVC Saddle piece |
| 109 | 32 mm PVC pipe |
| 110 | 32 mm PVC elbow |
| 111 | 32 mm PVC Tee |
| 112 | 32 mm PVC Tap |
| 113 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 114 | Collection and supply of Sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard specifications |
| 115 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete |
| 116 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x4 1/4\"x2 3/4\" and conveyance of all materials to site and all labour charges etc complete |
| 117 | Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etc using mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmild steel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(country wood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand supported by casurina props of 10cm to 13cm dia spacedat 75cmcentretocentre complete complying with standardspecificationsandasdirectedbydepartmental officers including conveyance of all materials to site and proper centering etc complete. |
| 118 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all charges etc., complete |
| 119 | Reinforced cement concrete 1:1.5:3 mix using 20mmISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete |
| 120 | Plastering with cement mortar 1:5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc complete |
| 121 | Cost and supply of Steel door size 0.75X1.80 |
| 122 | Cost and supply of name board |
| 123 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender