Tender For Widening Of Existing Burari Road Bridge At Rd 3990M Of Jahangirpuri Drain On Both Upstream And Downstream Side. (Balance Work), delhi-Delhi

Irrigation And Flood Control Department-IFCD has published Tender For Widening Of Existing Burari Road Bridge At Rd 3990M Of Jahangirpuri Drain On Both Upstream And Downstream Side. (Balance Work). Submission Date for this Tender is 30-06-2023. Bridge Work Tenders in delhi Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

38204788
Tender For Widening Of Existing Burari Road Bridge At Rd 3990M Of Jahangirpuri Drain On Both Upstream And Downstream Side. (Balance Work)
Open Tender
Indian
Delhi
delhi
30-06-2023

Tender Details

Widening Of Existing Burari Road Bridge At Rd 3990M Of Jahangirpuri Drain On Both Upstream And Downstream Side. ( Balance Work )

Key Value

Document Fees
Refer document
EMD
INR 290144.0 /-
Tender Value
INR 1.45 Crore /-

BOQ Items

Name of work :-Widening of existing Burari road bridge at RD 3990m of Jahangir puri drain on both upstream and downstream sides (Balance work).
Sl. No. Item Description
1Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
2Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 6.00 m, disposed earth to be levelled and neatly dressed. All kind of soil
3Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m :
4Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Single pile above 50 tonne and upto 100 tonne Safe capacity Initial test (Test Load 2.5 times the Safe capacity) Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Note: 2. Testing agency shall submitt the design of loading platform for the approval of Engineer-in-charge.
5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size).
6Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc., including cost of de-shuttering and decentering at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be measured).
7Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete
8Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
9Lintels, beams, plinth beams, girders, bressumers and cantilevers
10Suspended floors, roofs, landings, balconies and access platform
11Columns, Pillars, Piers, Abutments, Posts and Struts
12Providing and laying in position machine batched and machine mixed design mix M-35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.All work upto plinth level.
13Providing and laying in position machine batched and machine mixed design mix M-40 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.All work above plinth level upto floor V level.
14Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars.
15Providing and fixing 75mm dia PVC pipe heavy duty in the retaining wall at 1.00m c/c horizontal as well as vertical in staggered position complete as weep hole including filling of EC bags by filter etc and same to be placed behind the weep hole.
16Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications :On W.B.M. @ 0.75 Kg I sqm
172.5 cm thick bitumastic sheet with hot bitumen of approved quality, using stone chippings (60% with 12.5 mm nominal size and 40% with 10 mm nominal size) @ 1.65 cum per 100 sqm and coarse sand @ 1.65 cum per 100 sqm of road surface and with bitumen @ 56 kg/cum of stone chippings and @ 128 kg/cum of sand over a tack coat with hot straight run bitumen, including consolidation with road roller of 8 to 10 tonne etc. complete. (tack coat to be paid separately) : With paving Asphalt grade VG - 30
18Construction of maintenance and removal of bundies including cost of filling of EC bags with earth stitching and placing in position for care and diversion of all kind of water entring and flooring in the drain and pumping out the water from the surface as well as under ground seepage water to keep the construction are completly dry during execution of entire work including the execution in under water wherever required.
19Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)
20Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar
21Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : Water bound macadam road
22Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : bituminous road
23Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.
24Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
25Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail