Directorate Of Municipal Administration-DMA has published Tender For Supply, Erection And Maintenance Of Imc Air Conditioning System, Disel Generator System, Backup/Storage System For Electrical Utilities Of Ichalkaranji Municipal Council For 2023-24 In Imc Area.. Submission Date for this Tender is 29-06-2023. Air Handling Unit Tenders in ichalkaranji Maharashtra. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supplying and erecting Main Bearing Bush FOR Air Conditioning Plant |
2 | Supplying and erectingConnecting Rod Only Air Conditioning Plant |
3 | Supplying and erectingGudgen PinFOR Air Conditioning Plant |
4 | Supplying and erecting Gudgen Pin Bush FOR Air Conditioning Plant |
5 | Supplying and erectingPiston OnlyFOR Air Conditioning Plant |
6 | Supplying and erectingCylinder line FOR Air Conditioning Plant |
7 | Supplying and erectingDelivery Valve AssemblyFOR Air Conditioning Plant |
8 | Supplying and erectingShaft Seal AssemblyFOR Air Conditioning Plant |
9 | Supplying and erectingSuction ValveringFOR Air Conditioning Plant |
10 | Supplying and erectingSuction ValvespringFOR Air Conditioning Plant |
11 | Supplying and erectingOil Pump AssemblyFOR Air Conditioning Plant |
12 | Supplying and erectingVLD TeflonFOR Air Conditioning Plant |
13 | Supplying and erectingGasket set FOR Air Conditioning Plant |
14 | Supplying and erectingO Ring set FOR Air Conditioning Plant |
15 | Supplying and erectingAluminum Packing set FOR Air Conditioning Plant |
16 | Supplying and erectingOil FilterFOR Air Conditioning Plant |
17 | Supplying and erectingCrankcase HeaterFOR Air Conditioning Plant |
18 | Supplying and erectingLoad Unload CoilFOR Air Conditioning Plant |
19 | Supplying and erectingK-5 Valve FOR Air Conditioning Plant |
20 | Supplying and erecting Discharging Valve gasketFOR Air Conditioning Plant |
21 | Supplying and erectingPressure Gauge FOR Air Conditioning Plant |
22 | Supplying and erectingSafety ValveFOR Air Conditioning Plant |
23 | Supplying and erectingDM-032 Driver Both side flare connection 1/4 FOR Air Conditioning Plant |
24 | Supplying and erectingOil FOR Air Conditioning Plant |
25 | Supplying and erectingCrank Shaft FOR Air Conditioning Plant |
26 | Supplying and erectingSolenoid Coil for Pilot valve FOR Air Conditioning Plant |
27 | Supplying and erecting Expansion Valve FOR Air Conditioning Plant |
28 | Supplying and erecting Liquid Line DriverFOR Air Conditioning Plant |
29 | Supplying and erectingK-5 Valve FOR Air Conditioning Plant |
30 | Supplying and erecting Liquid Line Strainer FOR Air Conditioning Plant |
31 | Supplying and erecting Piston RingFOR Air Conditioning Plant |
32 | Supplying and erecting Rubber Spider for Coupling FOR Air Conditioning Plant |
33 | Supplying and erecting Nitrogen Cylinder FOR Air Conditioning Plant |
34 | Supplying and erecting Miscellaneoushardware FOR Air Conditioning Plant |
35 | Supplying and erecting star delta contracter FOR Air Conditioning Plant |
36 | Supplying and erecting Decaling chemicalFOR Air Conditioning Plant |
37 | Supplying and erecting Champion Gasket Sheet size 8*4*3mm FOR Air Conditioning Plant |
38 | Supplying and erecting Copper pipe 1/4 FOR Air Conditioning Plant |
39 | Supplying and erecting MP 55Differential Pressure Switch FOR Air Conditioning Plant |
40 | Supplying and erecting MP 1 Pressure Switch FOR Air Conditioning Plant |
41 | Supplying and erecting Refrigeration Gas R22 FOR Air Conditioning Plant |
42 | Preventive maintenance includes mechanical faults finding of Decaling of condenser. |
43 | Preventive maintenance includes mechanical faults finding of External Cleaning of Evaporating Coil and servicing. |
44 | Preventive maintenance includes mechanical faults finding of Lubricating Bearing. |
45 | Preventive maintenance includes mechanical faults finding of Replacement of defective gauges. |
46 | Preventive maintenance includes mechanical faults finding of Servicing/Overhauling of compressor. |
47 | Preventive maintenance includes mechanical faults finding of Reflecting of refrigerant. |
48 | Preventive maintenance includes mechanical faults finding of Attending fault Any sudden breakdown will be attended within 48 hours... |
49 | Removing existing cooling tower and commissioning of new advance cooling tower with required modification in piping as per quotation work |
50 | Providing Manual Operation AC Plant for day-to-day Technical work (O&M) monthly (provided by considering min wages gov.regulation/G.R.) |
51 | Supplying and erecting FILLS (1200X 300 X300) (Black-Munters) FOR cooling tower Air Conditioning Plant |
52 | Supplying and erecting DRIFTS (1200 x 300 x130) FOR cooling tower Air Conditioning Plant |
53 | Supplying and erecting NOZZLES 2 1/2” FOR cooling tower Air Conditioning Plant |
54 | Supplying and erecting PVC MATERIAL FOR cooling tower Air Conditioning Plant |
55 | Supplying and erecting FRP LINING FOR cooling tower Air Conditioning Plant |
56 | Supplying and erecting M.S FABRICATION (with material) FOR cooling tower Air Conditioning Plant |
57 | Supplying and Erecting ofPiston Ring Set for Disel Generator Set |
58 | Supplying and Erecting ofAir Filter for Disel Generator Set |
59 | Supplying and Erecting ofBearing Conn. Rod for Disel Generator Set |
60 | Supplying and Erecting ofCylindrical liner for Disel Generator Set |
61 | Supplying and Erecting ofFull packing (Upper and Lower) Set for Disel Generator Set |
62 | Supplying and Erecting ofWater Filter for Disel Generator Set |
63 | Supplying and Erecting ofOil Filter for Disel Generator Set |
64 | Supplying and Erecting ofFuel Filter for Disel Generator Set |
65 | Supplying and Erecting ofFuel Water Seperator Filterfor Disel Generator Set |
66 | Supplying and Erecting ofTurbo Repair Kit for Disel Generator Set |
67 | Supplying and Erecting ofEngine Oilfor Disel Generator Set |
68 | Supplying and Erecting ofCoolant 10ltr for Disel Generator Set |
69 | Supplying and Erecting ofValve Exchanger for Disel Generator Set |
70 | Supplying and Erecting ofValve Inlet for Disel Generator Set |
71 | Supplying and Erecting ofValve Seat Exchanger for Disel Generator Set |
72 | Supplying and Erecting ofGuide for Disel Generator Set |
73 | Supplying and Erecting ofSteam Seal for Disel Generator Set |
74 | Supplying and Erecting ofDiode kit for Disel Generator Set |
75 | Supplying and Erecting ofBearing Alternator for Disel Generator Set |
76 | Supplying and Erecting ofMain Bearing Set for Disel Generator Set |
77 | Supplying and Erecting ofWheel and Shaft Turbo for Disel Generator Set |
78 | Supplying and Erecting ofPiston Set for Disel Generator Set |
79 | Supplying and Erecting ofUV Coil for Disel Generator Set |
80 | Providing Engine Overhauling charges incl engine R/R, alternator R/R, engine to alternator alignment Fuel tank cleaning and load trial for Disel Generator Set |
81 | Providing Labour charges for fuel pump & nozzle repair & calibration for Disel Generator Set |
82 | Providing Labour charges for turbocharger for Diesel Generator Set |
83 | crane charges and transportation charges of Diesel Generator Set ( From Site to Workshop & Workshop To Site upto 30km) |
84 | starter and alternator repair charges along with spares for Disel Generator Set |
85 | main alternator dismantling, cleaning, heating and varnishing for Disel Generator Set |
86 | rewinding of 75 HP Compresser motor rewinding for AC Plant and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year |
87 | 7.5 HP Pump overhauling (replacement of bearing, bushing, shaft repair) for AC Plant |
88 | Providing Labour charges for cylinder head testing, repair & calibration for Disel Generator Set |
89 | Supply and Erection of 80 mm sluice valve for AC Plant |
90 | Supply and Erection of 80 mm NRV valve for AC Plant |
91 | Supply and Erection of 65 mm stop valve for AC Plant |
92 | Supply and Erection of Pressure Guage for AC Plant |
93 | On/Off emergency Push Botton (Market Rate) |
94 | Supplying ,installing , testing and commissioning tower type room AC unit of 3.5TR to 3.9TR capacity suitable to operate on 415V, 50 Hz, A.C. supply having 1 no AHU and 1 no cabinet type floor mounting type condensing unit with refrigerant R32/410A & copper condenser coil with anticorrosive fins copper condenser, hydrophilic evaporator fins powder coated outer body, with scroll/rotary compressor connected with provided refrigerant pipes, electric cables and drain pipe. |
95 | Supplying, installing, testing and commissioning tower type room AC unit of 4.0TR to 4.9TR capacity suitable to operate on 415V, 50 Hz, A.C. supply having 1 no AHU and 1 no cabinet type floor mounting type condensing unit with refrigerant R32/R410A & copper condenser coil with anticorrosive fins copper condenser, hydrophilic evaporator Fins Powder coated outer body, with scroll/rotary compressor connected with provided refrigerant pipes, electric cables and drain pipe. |
96 | supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 9.5 mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiations with OEM standards of VRV/VRF air conditioning system complete. |
97 | supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 19.1mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19 mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiations with OEM standards of VRV/VRF air conditioning system complete. |
98 | Supplying, installing, testing and commissioning of single phase, 230V, 50 Hz, 1400 to 1600VA digital pure sine wave inverter with backup time of ........ hrs. based on Insulated Gate Bipolar Transistor (IGBT) technology complete as per specification no. AP-INV |
99 | Supplying, installing, testing and commissioning of single phase, 230V, 50 Hz,2500 VA digital pure sine wave inverter with backup time of ........ hrs. based on Insulated Gate Bipolar Transistor (IGBT) technology complete as per specification no. AP-INV |
100 | Supplying and erecting fully automatic line voltage stabilizer buck and boost type for operation on input voltage 160-270V and output voltage 200-250V rated for 3kVA maximum load and with voltmeter, selector switch, 6A/16A flush type 3 pin socket for output and with 3 core copper flexible cord and 3 pin 6/16A plug top with overload & short circuit protection complete. |
101 | Supplying and erecting fully automatic line voltage stabilizer buck and boost type for operation on input voltage 160-270 V and output voltage 200-250V rated for 5kVA maximum load and with voltmeter, selector switch, 6A/16A flush type 3 pin socket for output and with 3 core copper flexible cord and 3 pin 6/16A plugtop with overload & short circuit protection complete . |
102 | Rewinding of electric motor above 7.5 H.P. upto 10 H.P. three phase up to 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year |
103 | Rewinding of electric motor above 20 H.P. upto 25 H.P. three phase up to 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year |
104 | Rewinding of electric motor above 12.5 H.P. upto 15 H.P. three phase up to 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail