Tender For Repair Work Of Weather Proof Course, Plinth Protection And Floor Work Badmal-Bolangir, bolangir-Odisha

Bharat Heavy Electricals Limited-BHEL has published Tender For Repair Work Of Weather Proof Course, Plinth Protection And Floor Work Badmal-Bolangir. Submission Date for this Tender is 26-06-2023. Solar Power Plants Tenders in bolangir Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

38194254
Tender For Repair Work Of Weather Proof Course, Plinth Protection And Floor Work Badmal-Bolangir
Open Tender
Indian
Odisha
bolangir
26-06-2023

Tender Details

Repair Work Of Weather Proof Course, Plinth Protection And Floor Work Badmal-Bolangir Repair Work Of Weather Proof Course, Plinth Protection And Floor Work At Main Control Room Building (Mcr), Inverter Room Building (Icr) And Other Miscellaneous Works For 7.5 Mw Solar Pv Plant Bel-Ofbl, Badmal-Bolangir Odisha

Key Value

Document Fees
Refer document
EMD
INR 44250.0 /-
Tender Value
INR 22.12 Lakhs /-

BOQ Items

Name of Work: Repair work for weather proof course, plinth protection and Floor work atMain Control room building (MCR), Inverter room building (ICR) and other miscellaneous worksfor 7.5 Mw Solar PV PlantBEL-OFBL, BADMAL-BOLANGIR (ODISHA) NOTE: 1. CONTRACTOR SHOULD QUOTE PERCENTAGE (%) ABOVE/BELOW (OR) AT PAR WITH RESPECT TO TOTAL AMOUNT. 2. QUOTED PERCENTAGE (%)IS APPLICABLE ON ALL ITEM RATES UNIFORMLY... Important Note: 1. Quantity of Line items may vary up to any extent (Decrease or Increase), As per requirement of work. Unit Rate shall be firm (no change) irrespective of quantity deviation if any. 2. Work shall be executed as per instruction of BHEL Engineer. 3. Payment shall be done for actual executed quantity certified by BHEL Engineer. 4. All statutory documents like Attendance register, wage register, Proof of payment, ESI, PF payment etc. shall be submitted along with invoice.
Sl. No. Item Description
1A. Main Control Room Building Repair work of weather proof course atMCR roof
2Demolishing brick tile and loose mortar, concrete, other material etc, covering in terracing (roof)including stacking of serviceable material and disposal of unserviceable material outside the Solar plant premises, As directed by Engineer-in-charge of BHEL
3Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge of BHEL.
4Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 12.5 mm nominal size derived from natural sources). As directed by Engineer-in-charge of BHEL over roof of building in slope to drain out rain water
5Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
6Supply and fixing chicken mesh inconcrete over roof of building including all as directed by Engineer-in-charge of BHEL
712 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand)with mixing water proof material over the concrete laid on roof as directed by Engineer-in-charge of BHEL
8Finishingwithwaterproof (approved brand by BHEL) Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ as per manufacture"s instruction and including priming coat of exterior primer applied @ as per manufacturer"s instruction) over the concrete laid on roof as directed by Engineer-in-charge of BHEL
9A. Main Control Room Building Repair workof Plinth Protection work at MCR
10Demolishing cement concrete manually/ by mechanical means including disposal of material outside of Solar plant premises as per direction of BHEL Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
11Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material outside Solar plant premises as per direction of BHEL Engineer-in-charge. n cement mortar
12Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated outside Solar premises and lift upto 1.5 m, as directed by BHEL Engineer-incharge. All kinds of soil
13Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and wateringas directed by BHEL Engineer-incharge
14Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete
15Dry stone pitching 22.5 cm thickincluding supply of stones and preparing surface, stone laying with soil, waterining and rammingcomplete.
16Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
17Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand).
1812 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand)
19Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 110 mm diameter including all complete work
20Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. 110 mm Shoe including all complete work
21A. Main Control Room Building Repair workof Flooring work at MCR
22Dismantling disposal oftile work in floors, cement mortar and other loose materials including stacking material and disposal of debris outside the solar premisesFor thickness of tiles 10 mm to 25 mm
23Demolishing cement concrete manually/ by mechanical means including disposal of material outside of Solar plant premises as per direction of BHEL Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
24Dry stone pitching 22.5 cm thickincluding supply of stones and preparing surface, stone laying with soil, waterining and rammingcomplete.
25Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete
26Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
27Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600x600 mm as directed by BHEL Engineer in charge
28B.ICR Building (Inverter room building) 1 Repair work of weather proof courseat ICR(Inverter room building) 1 roof
29Demolishing brick tile and loose mortar, concrete, other material etc, covering in terracing (roof)including stacking of serviceable material and disposal of unserviceable material outside the Solar plant premises, As directed by Engineer-in-charge of BHEL
30Hacking of CC flooring including cleaning for surface etc. complete as per direction of the Engineer-in-Charge of BHEL.
31Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 12.5 mm nominal size derived from natural sources). As directed by Engineer-in-charge of BHEL over roof of building in slope to drain out rain water
32Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
33Supply and fixing chicken mesh inconcrete over roof of building including all as directed by Engineer-in-charge of BHEL
3412 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand)with mixing water proof material over the concrete laid on roof as directed by Engineer-in-charge of BHEL
35Finishingwithwaterproof (approved brand by BHEL) Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ as per manufacture"s instruction and including priming coat of exterior primer applied @ as per manufacturer"s instruction) over the concrete laid on roof as directed by Engineer-in-charge of BHEL
36ICR Building (Inverter room building) 1 Plinth Protection work at ICR Building (Inverter room building) 1
37Demolishing cement concrete manually/ by mechanical means including disposal of material outside of Solar plant premises as per direction of BHEL Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
38Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material outside Solar plant premises as per direction of BHEL Engineer-in-charge. n cement mortar
39Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated outside Solar premises and lift upto 1.5 m, as directed by BHEL Engineer-incharge. All kinds of soil
40Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and wateringas directed by BHEL Engineer-incharge
41Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete
42Dry stone pitching 22.5 cm thickincluding supply of stones and preparing surface, stone laying with soil, waterining and rammingcomplete.
43Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
44Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand).
4512 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand)
46Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 110 mm diameter including all complete work
47Providing and fixing on wall face unplasticised - PVC moulded fittings/ accessories for unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. 110 mm Shoe including all complete work
48Repair work of flooring at ICR(Inverter room building) 1
49Demolishing cement concrete manually/ by mechanical means including disposal of material outside of Solar plant premises as per direction of BHEL Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
50Dry stone pitching 22.5 cm thickincluding supply of stones and preparing surface, stone laying with soil, waterining and rammingcomplete.
51Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete
52Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
5340 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or 40mm thick cement concrete (IPS) Flooring (1:2:4) as per manufacturer"s specifications and as directed by BHEL Engineer -in-charge. complete
54Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer"s specifications including appropriate priming coat, preparation of surface, etc. complete. On concrete work
55Miscellaneous work
56Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material outside solar plant premises as per direction of BHELEngineer - in- charge.
57Repairs to plaster of thickness 12 mm to 20 mm in patches , including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbishoutside the solar plant, all complete as per direction of BHEL Engineer-in-Charge. With cement mortar 1:4 (1cement: 4 coarse sand)
58Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated outside Solar premises and lift upto 1.5 m, as directed by BHEL Engineer-incharge. All kinds of soil
59Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
60Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
61Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand).
6212 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand)
63Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand
64Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.