Kerala State Electricity Board-KSEB has published Constructing 11Kv Line Using Ht Covered Conductor At Tube Well For Avoiding Cross Country Ht Line, Mynagappallyunder Esd Sasthamcottaon Turnkey Basis. Submission Date for this Tender is 26-06-2023. Overhead Line Tenders in mynagappally Kerala. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | MATERIALS |
2 | Covered Conductor HT 70 sqmm |
3 | Helically Formed Fitting -Distribution Top Tie for ACSR Raccoon |
4 | Helically Formed Fitting -Distribution Top Tie for ACSR Raccoon |
5 | COMPOSITE PIN INSULATOR 11 kV with Pin |
6 | Cleat GI for 11kV Disc insulator |
7 | Hardware Fittings 11kV B&S Type |
8 | Disc Insulator 11 kV Composite Polymeric |
9 | LABOUR |
10 | Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. |
11 | Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation. |
12 | Transporting Transformers by hired vehicle upto 5km and upto 2 No. of 63 to 250kVA Transformers / RMUs excluding loading & unloading. |
13 | Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses. |
14 | Stringing of one km 3 PH 11kV line with XLPE Insulated ACSR Raccoon |
15 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
16 | Dismantling (without damage)one Km LT 3 ph 4 wire OH line, Cross arms,insulators and stacking the conductors in rolls . |
17 | Additional conductor line, cross arms,insulators and stacking conductors in rolls. |
18 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
19 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
20 | Dismantling one damaged LT PSC/RCC Strut pole incl. removal of clamps and stacking. |
21 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
22 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
23 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |
24 | Providing Stay for LT poles incl. digging & back filling pit. |
25 | Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel for N&St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
26 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
27 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
28 | Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line. |
29 | Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough). |
30 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
31 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
32 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
33 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
34 | Additional rate for providing one disc set on any type of HT pole for making cut point. |
35 | Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. |
36 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
37 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
38 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
39 | Fitting one set AB switch and giving connection |
40 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
41 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. |
42 | Drilling hole of various sizes on existing Channel/Cross Arm. |
43 | Pole in position inc fitting 2 channel cross arms , digging and back filling pit, drawing earth leads. |
44 | Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. |
45 | Dismantling (without damage) onekm 11kV line(3 conductors), cross arm,insulators,disc,rolling the conductor and stacking . |
46 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
47 | Dismantling one Transformer upto 160kVA from structure and loading to vehicle incl. disconnecting HT/LT/Earth connections. |